Xcel Energy Inc. · NASDAQ:XEL
Xcel Energy — Corporate Update (October 2011)
14 slides from Xcel Energy's corporate update, Oct 12, 2011
Slide 1: Coal Supply Presentation
Coal Supply Presentation Mark Roberts Manager, Fuel Supply Operations October 12, 2011
Slide 2: Coal-Fired Power Plants Statistics: Harrington Station
Coal-Fired Power Plants Statistics Harrington Station: Amarillo, Texas Three coal-fired units: 1,066 net MW Coal sources Low-sulfur Southern Powder River Basin (“PRB”) coal mines including North Antelope Rochelle, Antelope and Black Thunder Transportation: BNSF Railway Trestle unloading
Slide 3: Coal-Fired Power Plants Statistics: Tolk Station
Coal-Fired Power Plants Statistics Tolk Station: Muleshoe, Texas Two coal-fired units: 1,130 net MW Coal sources Low sulfur Southern PRB coal mines including North Antelope Rochelle, Antelope and Black Thunder Transportation: BNSF Railway Rotary unloading system Historical average annu
Slide 4: SPS Contract Information
SPS Contract Information TUCO, Inc. TUCO is a third-party contractor that contracts for the coal supply and transportation to Tolk and Harrington stations TUCO manages the coal, rail and coal-handling contracts SPS purchases coal from TUCO at the plant bunkers Xcel Fuel Supply Operations m
Slide 5: TUCO Coal Contract Information
TUCO Coal Contract Information Eight contracts in place for Tolk and Harrington The contracts are with Peabody Energy, Cloud Peak Energy and Arch Coal Peabody: Two contracts at fixed price 2011-13 3.8m tons/yr, 2014-5 2m tons/yr 2011 0.2m tons high-sodium test coal for Tolk Cloud Peak: T
Slide 6: TUCO Transportation Contract Information
TUCO Transportation Contract Information Transportation Both Tolk and Harrington served by BNSF Railway Both contracts extend through 2012 Railcars Railcars are provided by long-term lease held by Savage and included in the cost of coal handling 6
Slide 7: Near-Term Forecast Delivered Fuel Prices
Near-Term Forecast Delivered Fuel Prices ($/MMBtu) $2.50 $2.00 $1.50 $/MMBtu Harrington $1.00 Tolk $0.50 $- 2011 2012 2013 2014 2015 Based on 2011-2015 annual 5-year budget (includes coal, rail and coal losses) 7
Slide 8: PRB Map
PRB Map Powder River Basin Roughly 300mi x 100 mi USGS 140b tons of resources in areas of most interest 77b tons in Gillette Coalfield alone 8 88
Slide 9: Current PRB Coal Market Trends
Current PRB Coal Market Trends 2011 PRB production expected to be PRB 8800 Btu/lb Coal Forecasts ~485m tons (SPS will purchase ~1.7% of (FOB Mine in 2011$) this total) $25 Continued global coal demand and weak dollar expected to keep upward price $20 pressure on all domestic coal types If mine
Slide 10: Long-Term Forecasting Methodology for Resource Planning Purposes
Long-Term Forecasting Methodology for Resource Planning Purposes Coal Coal price forecasts result from review and consideration of multiple expert sources including but not limited to JD Energy, John T Boyd and Wood Mackenzie Beyond the term of provided long-term forecasts, an escalation facto
Slide 11: Long-Term Forecasting Methodology Continued: Delivered Coal Cost
Long-Term Forecasting Methodology Continued: Delivered Coal Cost Coal Plant-specific, long-term, delivered-price forecasts are developed Below is an example of the long-term, delivered-price forecast for SPS Delivered Coal Prices $3.50 Harrington $3.00 Tolk $2.50 $/MMBtu $2.00 $1.50 $1.00 11 1
Slide 12: SPS Coal Risks
SPS Coal Risks SPS is exposed to PRB coal price risk PRB demand has the potential to be affected by CSAPR and other environmental rules and legislation Premiums for ultralow sulfur PRB coals and the higher Btu products (8800 v. 8400) may increase Global demand has certain effects on PRB dema
Slide 13: SPS Transportation Risks
SPS Transportation Risks Rail pricing could be higher with new contracts to be in place starting in 2013 Current rail contracts do not include a diesel surcharge that will likely be included with the new contract starting in 2013 The railroads are requiring surfactants be applied to the top la
Slide 14: Xcel Energy
2 Xcel Energy’ RESPONSIBLE BY NATURE™