Chalice Gold Mines Limited

Chalice Gold Mines — Investor Presentation (July 2010)

23 slides from Chalice Gold Mines's investor presentation, July 2010

  1. Slide 1: Building an African Gold Mining Powerhouse

    ASX: CHN • Development targeted for 2011 • 104,000 oz per year producer • Huge exploration upside Building an African Gold Mining Powerhouse Corporate Presentation July 2010 www.chalicegold.com

  2. Slide 2: Disclaimer & Competent Person's Statement

    Disclaimer & Competent Person’s Statement • This presentation may contain value references and "forward looking statements“ which are subject to various risks and uncertainties that could cause actual results and future events to differ materially from those expressed or implied by such statements.

  3. Slide 3: Chalice Snapshot

    Chalice Snapshot • Creating shareholder wealth through exploration and production: • Focused on East Africa, Listed on ASX (CHN), Listing on TSX (August 2010) • 100% owned Zara Gold Project, Eritrea (subject to gov’t project participation rights): • High-grade Ore Reserves of 760,000oz @ 5.1g/t: Kok

  4. Slide 4: Corporate Snapshot

    Corporate Snapshot Capital Structure • Shares on issue 181M • Options on Issue 13.075M • Cash (est. July 10) ~A$6.6M Board • Tim Goyder (Executive Chairman) 6 month share price • Dr Doug Jones (Managing Director) • Mike Griffiths (Executive Director) • Anthony Kiernan (Non-Executive Director) • Step

  5. Slide 5: Zara – Project Location

    Zara — Project Location chalice Gotp MINES 250,000 mE ERITREA TN. \ . Ethiopia Granted Chalice Tenement 500,000 mE 0 25 50 kilometres [| Chalice Application 750,000 mE London Africa Prospecting Licences (CHN 20% interest) a Saudi Arabia =_ SN Djibouti

  6. Slide 6: Koka – Outstanding Returns, Outstanding Potential

    Koka – Outstanding Returns, Outstanding Potential • Positive Feasibility Study completed • US$122M development of open pit mining operation and on-site treatment plant • ~700,000tpa ore processing to produce 104,000oz pa • Forecast cash operating cost of just US$338/oz • NPV of US$196M and 35% IRR a

  7. Slide 7: Koka Project – Key Financial Outcomes

    Koka Project – Key Financial Outcomes 100% Project Financial Outcomes* Gold Price (Unleveraged) $900 $1,200 $1,500 Life-of-mine EBITDA $381M $589M $797M Average annual EBITDA $54M $84M $114M NPV5% after-tax cash flows $99M $196M $293M IRR after tax 22% 35% 45% Payback period (years) 2.8 2.1 1.8 * Th

  8. Slide 8: Koka Gold Deposit

    Koka Gold Deposit • JORC-compliant Indicated Resource of 5.0Mt @ 5.3 g/t Au for 840,000oz gold • Probable reserve – 4.6Mt @ 5.1g/t • Based on results from 137 diamond drill holes (~21,000m drilled) • Quartz stockwork system in microgranite • ~600m strike length, 20-30m wide • Bulk of resource shallo

  9. Slide 9: Koka Gold Deposit – 3D Pit Image

    Koka Gold Deposit – 3D Pit Image 9

  10. Slide 10: Koka Gold Deposit – Cross Sections

    Koka Gold Deposit – Cross Sections Stage 1 pit design – pd4tr Whittle shell 3 Whittle shell 18 Final pit design – pd1tr 10

  11. Slide 11: Koka Gold Mine – Plant Layout

    Koka Gold Mine – Plant Layout 11

  12. Slide 12: Koka Gold Mine – Site Layout

    Koka Gold Mine – Site Layout Plant Dump A Dump B Dump C 12

  13. Slide 13: Exploration Upside – The Bigger Picture

    Exploration Upside – The Bigger Picture • Zara Project located within emerging gold & base metal province • Gold endowment +20Moz – numerous deposits and mines dating back to ancient times • Minimal modern exploration • New world-class projects being developed: • 13Moz Sukari Gold Mine (Egypt) – in

  14. Slide 14: Chalice – Huge Exploration Upside

    Chalice – Huge Exploration Upside • Chalice has an interest in ~24,000 sq km of highly prospective tenements in Eritrea plus the 615km2 Zara Project • Recent exploration has identified several zones of extensive mineralisation in addition to the existing Koka resource, within the Zara Project • Dril

  15. Slide 15: Exploration – 'Near-Mine'

    Exploration – ‘Near-Mine’ • Other targets identified in immediate vicinity include: Koka • Konate – artisanal workings South on quartz stockwork • Koka South Extension – IP resistivity anomaly • Deep penetration IP survey planned to cover 6 x 1.5 km Koka-Konate corridor 15

  16. Slide 16: Koka South

    Koka South KOKA • Strong IP resistivity anomaly identified 200- 500m south of Koka • Ground follow-up confirmed zone of silica- sericite altered microgranite • Limited drilling confirmed Koka-style 8.9/1 mineralisation – up to 92g/t over 1m 24/2 2.2/1 • Potential ‘blind’ system open down plunge to 2

  17. Slide 17: Konate

    Konate • Zone of intensive artisanal workings 5km south of Koka: • ~600m by up to 30m wide • quartz vein stockwork in silica-sericite altered microgranite • limited historical drilling (5 holes) provided inconclusive results • IP survey conducted post-drilling suggests main zone not intersected • Fu

  18. Slide 18: Konate

    Konate Konate quartz veins by thickness in mm 200 m 18

  19. Slide 19: Regional Geochemical Sampling

    Regional Geochemical Sampling • Systematic geochemical drainage sampling best method for this terrane • Compelling initial BLEG (Bulk Leach Extractable Gold) and multi-element analyses result received • Six samples received >10ppb with highest being 362ppb • Results >5ppb considered anomalous • Foll

  20. Slide 20: Eritrea Overview

    Eritrea Overview • Stable operating and social environment • Proactive Government stance on mining developments – “open for business” • Modern Mining Code • Increasing foreign exploration & mining investment – 17 groups now active in country 20

  21. Slide 21: Eritrea Mining Act

    Eritrea Mining Act Prospecting licence Royalties • One year, not renewable,not transferrable • Up to 5% for precious metals and 3.5% for other • Maximum size 100km2 metallic minerals • Licence fee (US)$33.33 • Annual rental (US)$3.33/km2 Government Participation • 10% free-carried interest at the mi

  22. Slide 22: Summary

    Summary • Koka Gold Deposit: • Advanced high grade gold deposit • Strong economics • Low technical risk • Feasibility Study completed • Aggressive exploration programs underway to expand resource base • Strategic ground position in emerging gold & base metal province • Experienced Board and Manageme

  23. Slide 23: Building an African Gold Mining Powerhouse

    ASX: CHN • Development targeted for 2011 • 104,000 oz per year producer • Huge exploration upside Building an African Gold Mining Powerhouse Corporate Presentation July 2010 www.chalicegold.com