Eloro Resources Ltd. · TSX:ELO

Eloro Resources — Investor Presentation (January 2016)

21 slides from Eloro Resources's investor presentation, January 2016

  1. Slide 1: The La Victoria, Lemoyne North and Delta-Eastmain Gold Projects, Peru and Quebec

    TSX-V: ELO FSE: P2Q The La Victoria, Lemoyne North and Delta- Eastmain Gold Projects, Peru and Quebec Investment Risk Mitigation Through Mine Discovery and Development January 2016

  2. Slide 2: Cautionary Note Regarding Forward-Looking Statements

    CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS Certain information contained herein regarding Eloro Resources Ltd., including management’s assessment of future plans and operations, may constitute forward- looking statements under applicable securities law and necessarily involve risks, includ

  3. Slide 3: Experienced Management Team

    EXPERIENCED MANAGEMENT TEAM TORONTO AND VAL D’OR OFFICES Management Board of Directors Thomas Larsen Thomas Larsen CEO Chairman John Langton, M.Sc. P.Geo. Alex Horvath, P.Eng. President Director Jim Steel, MBA P.Geo. Francis Sauve Senior VP Mining Director Miles Nagamatsu, C.A. Dusan Berka, P. Eng.

  4. Slide 4: Capital Structure

    CAPITAL STRUCTURE Exchange/Ticker TSX Venture Exchange/ELO Frankfurt Stock Exchange/P2Q (WKN A1JKAT) Shares Issued and 17.77 million (Jan. 12, 2016) Outstanding Warrants 2.433 million Options 1.35 million Fully Diluted 21.55 million Share Price $0.14 (Jan. 12, 2016) Market Capitalization $2.49 milli

  5. Slide 5: La Victoria - Option

    LA VICTORIA - OPTION Eloro Resources Ltd. has an option to earn 60% of the La Victoria Gold/Silver Property, possibly the last significant mining property available in the Northern Peru Mineral Belt with the same rocks as several of the producing gold and silver mines in the Belt - a scant 15km to 5

  6. Slide 6: La Victoria - Option

    LA VICTORIA - OPTION  Located in the heart of the Ancash – La Libertad mining area in the North- Central Mineral Belt of Peru, 425 km N of Lima, 120 km E of Trujillo at 3,100 m to 4,200 m elevation.  The La Victoria Property Option and Joint Venture Agreement was signed with Tartisan Resources Cor

  7. Slide 7: Gold Producers North-Central Mineral Belt, Peru

    GOLD PRODUCERS NORTH-CENTRAL MINERAL BELT, PERU Gold Elevation ASL Distance From La Mine Company Production (m) Victoria 2013 ozs. Yanacocha Newmont Mining /Buenaventura 967,575 3,500 - 4,500 160 km NNW Lagunas Norte Barrick Gold Corporation 606,000 3,700 - 4,200 50 km NW (Alto Chicama) Quiruvilca S

  8. Slide 8: La Victoria Concessions

    LA VICTORIA CONCESSIONS  La Victoria Concessions held by Tartisan’s Peruvian subsidiary Minera Tartisan Peru SAC.  Neighbouring concessions acquired and/or expanded by BHP Pending Auction Billiton, IAMGOLD among others.  Concession between La Victoria East and West acquired, in concession registr

  9. Slide 9: La Victoria: Exploration Work to Date

    LA VICTORIA: EXPLORATION WORK TO DATE  Built 10-km access road from Highway 3N to San Markito zone  Concluded topographic survey with geodesic benchmarks  Magnetic survey – 125 line km  IP survey – 34 line km  Spectral analysis study  Rock sampling – 900+ samples submitted for analysis to date

  10. Slide 10: La Victoria Project: Development Strategy

    LA VICTORIA PROJECT: DEVELOPMENT STRATEGY Rufina Pit Preliminary Targets FIRST PRIORITY Pica Fault • 2500m drilling planned for Rufina West Zone; 10 holes @250M depth • Green square area conceptual cube of continuous surface Rufina West exposed mineralization. Average of 18 surface samples 11.1 g/t

  11. Slide 11: La Victoria Project: Development Strategy

    LA VICTORIA PROJECT: DEVELOPMENT STRATEGY Rufina East New Mineralized Zone Pica Fault • Rufina, east of Pica fault; road outcrop. • Arsenopyrite; sphalerite; chalcopyrite. Brecciated quartz, Rufina West argillic alteration, acid leaching, open space filling, drusy quartz, brecciated chert. Recent va

  12. Slide 12: La Victoria Project: Exploration Strategy

    LA VICTORIA PROJECT: EXPLORATION STRATEGY San Markito Pit Target SECOND PRIORITY • 1000m drilling planned for San Markito; 10 holes @100M depth • Hydrothermal breccia potential zero strip ratio for first 50m; • Quartz vein values to 2 g/t gold + 470 g/t silver; sedimentary values to 2.2 g/t gold + 1

  13. Slide 13: Peru – La Victoria: Principal Value Drivers

    PERU – LA VICTORIA Eloro Resources Ltd. PRINCIPAL VALUE DRIVERS • Rufina Sector – Preliminary oxide heap leach gold target; 25.6MM tonnes at >2 g/t. Open to depth and to east under volcanic cover. Oxide grades to 46.4 g/t (west sector). Sulphide grades to 63.8 g/t (east sector) • San Markito Sector

  14. Slide 14: Principal Quebec Projects

    TSX-V: ELO FSE: P2Q PRINCIPAL QUEBEC PROJECTS • Lemoyne North • Delta / Eastmain Eloro is pleased to be working with Diagnos Inc, Brossard, Quebec, in the application of CARDS® “Computer Aided Resource Detection System” to determine the true exploration potential of the Lemoyne North Property so as

  15. Slide 15: Quebec – Lemoyne North

    QUEBEC – LEMOYNE NORTH  Lemoyne North Project (57 claims, 29 km2); La Grande Greenstone Belt, James Bay area.  Gold and base-metal exploration district 100 km northeast of Eleonore Mine.  Hosts numerous gold and base- metal occurrences.  7 untested CARDS* gold targets.  Bi-modal volcanic sequen

  16. Slide 16: Quebec – Lemoyne North

    Veco ELOrO CESOUrCES LToO. QUEBEC — LEMOYNE NORTH 490,000 453,500 Geology Felsic plutonic 1) Greywacke i " Quartz-monzodiorite Ml Iron formation 423000 Bertha Showing 21.22 g/t Au, 38.30 g/t Ag, 4.04% Cu al v4 5 Gabbro Felsic volcanic 65.42 g/t Au, 2.88% Cu Din Ml Ultramafic plutonic BB Mafic volean

  17. Slide 17: Eastmain Greenstone Belt - QC

    EASTMAIN GREENSTONE BELT - QC  Eastmain Greenstone Belt, James Bay area of north-western Quebec.  Emerging gold and base-metal exploration district around Eleonore Mine (5.0 M oz. Au Proven and Probable reserves),  Delta/Eastmain project – hosts numerous untested, shallow InfiniTEM point-anomalie

  18. Slide 18: Quebec - Delta / Eastmain

    QUEBEC - DELTA / EASTMAIN CARDS Au target CARDS Cu target 18

  19. Slide 19: Quebec – Exploration: Principal Value Drivers

    QUEBEC – EXPLORATION PRINCIPAL VALUE DRIVERS Exploration Properties 1. Lemoyne North – 57 claims with numerous multi-metal targets; 2016 Program to re- evaluate true mineral potential based on CARDS®* analysis by Diagnos Inc. of Brossard, Quebec. *Computer Aided Resource Detection System 2. Delta/Ea

  20. Slide 20: Eloro's Golden Opportunity

    ELORO’S GOLDEN OPPORTUNITY “Drilling and building is where all the value creation occurs” David Garofalo, Incoming Goldcorp CEO, Toronto Globe & Mail, Dec. 29, 2015  Experienced team with track records and ability to acquire, explore, discover, develop, produce and manage high-merit projects.  Hig

  21. Slide 21: Thank you!

    Thank you! Toll Free: +1.800.360.8006 Tel.: +1.416.868.9168 Email: info@elororesources.com Website: www.elororesources.com 21

Eloro Resources — Investor Presentation (January 2016) on 6ix