Critical Mineral Resources Plc · LSE:CMRS

Critical Mineral Resources — Investor Presentation (February 2026)

24 slides from Critical Mineral Resources's investor presentation, February 2026

  1. Slide 1: Critical Mineral Resources Plc Corporate Presentation

    CRITICAL MINERAL RESOURCES PLC Corporate Presentation

  2. Slide 2: Disclaimer

    2 DISCLAIMER The sole purpose of this investor presentation, talks given by presenters, the information communicated during any delivery of the presentation and any question and answer session and any document or material distributed at or in connection with the presentation (together, the “Presenta

  3. Slide 3: Board of Directors

    3 BOARD OF DIRECTORS GÉRA UD CHARLES NOUREDDINE RUSSELL RUSSELL MOUSA RRIE LONG SABRAOUI THOM SON TUCKER CHAIRMAN CEO COO NED NED Géraud has extensive Charlie is a mining Noureddine is an Russell Thomson is an Russell Tucker brings resources experience specialist with industry experienced field acco

  4. Slide 4: Investment Case

    4 INVESTMENT CASE 01 04 Strategy to become a mid-sized north African copper Moroccan expertise to ensure smooth permitting producer journey, lowering execution risk First asset is copper–silver discovery* at Agadir-Melloul Aiming for 2027 construction 02 05 Earning 60% through staged development exp

  5. Slide 5: Morocco's Strong Copper Outlook 2030F

    5 WORLD COPPER MINE SUPPLY (Mt) MOROCCO’S STRONG 37 COPPER OUTLOOK POSSIBLE PROBABLE COMMITTED AFTER DISRUPTION ALLOWANCE • Favourable jurisdiction – No.1 in Africa Fraser Institute 32 FORECAST MINE SUPPLY • Presence of large-scale copper deposits confirmed ACTUAL/REQUIRED MINE SUPPLY (Tizert: 130mt

  6. Slide 6: Agadir Melloul Introduction

    6 AGADIR MELLOUL INTRODUCTION

  7. Slide 7: Company making sedimentary COMPANY MAKING

    7 Company making sedimentary COMPANY MAKING copper deposit SEDIMENTARY COPPER DEPOSIT AGADIR-MELLOUL AGADIR TIZERT ZGOUNDER / AYA GOLD & SILVER OTHER MINES 50 100km

  8. Slide 8: Achievements to Date

    8 ACHIEVEMENTS TO DATE • Initial discovery at Zone 1 and Zone 2 • District-controlling land package: c.60km2 with exclusivity over a further 16km2 • Fieldwork demonstrates mineralised strike length of >12km on initial permits • Confirmation that Agadir-Melloul is a direct geological analogue of Tize

  9. Slide 9: 2026 Work Programme, Four Milestones and Catalysts

    9 2026 WORK PROGRAMME, FOUR MILESTONES AND CATALYSTS JAN FEB FEB MAR APR JUN DEC DEC DIAMOND PROJECT MINING PROJECT LARGE MAIDEN FEASIBILITY CONSTRUCTION DRILLING ACQUISITION LICENSE ACQUISITION SCALE RESOURCE1 AND DECISION MET-TEST PERMITTING NEW OWNER’S HIGH ZONES FRONTIER AFRILAB’S J ORC EIA & 50

  10. Slide 10: Initial Drill Results, Copper, Silver and Gold

    10 INITIAL DRILL RESULTS, COPPER, SILVER AND GOLD ALL MINERALISATION FROM OR NEAR SURFACE RESULTS No. Length (m) Cu (%) Ag (g/t) No. Length (m) Cu (%) Ag (g/t) SUPPORT BH01 5.8 1.12 19.0 BHR09 10.0 1.10 20.0 2.0M WIDTH BH04 2.5 0.85 4.0 BHR05 1.0 1.44 - 1.2% CUEQ BH06 2.0 1.30 - BHF01 2.0 0.95 - BH0

  11. Slide 11: Zone 1 North – Shallow, Tabular Copper Mineralisation

    11 ZONE 1 NORTH – SHALLOW, TABULAR COPPER MINERALISATION

  12. Slide 12: Mineralised Rhyolite Discovery

    12 MINERALISED RHYOLITE DISCOVERY • At surface rhyolite discovery at Zone 2 • Mineralisation style unknown but potentially primary • Opens-up basement as a drilling target • Potential for large scale discovery • Some parts of the rhyolite contain gold RHYOLITE CORE 6.0m at 1.4% Cu and 30g/t Ag

  13. Slide 13: Initial Portfolio

    13 ZONE 2 INITIAL PORTFOLIO • District scale deposit ZONE 4 • Thus far only drilled 1% of project • All four zones show semi-continuous / consistent copper ZONE 1 mineralisation over multi kilometre strike lengths • Mineralisation primarily (80%) hosted in sedimentary rocks but Precambrian rhyolite

  14. Slide 14: Exploration Target

    14 EXPLORATION TARGET AREA (km2 of Adoudounian) % / KM2 MINERALISED CuEQ GRADE (%) Potential Resources Contained copper eq. TARGET 50 10% 5.0 1.2% 25MT 300KT 50 15% 7.5 1.2% 38MT 450 KT • 300,000 tonnes = $2.5 billion 65 10% 6.5 1.1% 33M T 358KT 65 15% 9.75 1.1% 49MT 536KT 85 10% 8.5 1.0% 43MT 425KT

  15. Slide 15: Tizert Analogue

    15 55km west of Agadir Melloul TIZERT Tizert started life with 1.1Mt at 2.3% Cu and 65 g/t Ag now 130MT at 0.9% copper + silver credits ANALOGUE Agadir Melloul is starting a similar journey TIZERT JOURNEY: RESOURCE PHASE 1 130 MT GROWTH (17Y) RESOURCE EXPECTED 1.1 MT PLANNED 100MT M&I “VERY OUTPUT R

  16. Slide 16: Continued Drilling

    16 FAST-TRACK DEVELOPMENT 650 to 1,000 tpd Initial Mine • Earning-in to 60% through development of modest scale copper flotation plant CONTINUED DRILLING • Production provides path to cashflow within 3.5 years STRATEGIC RESOURCE Targeting a large-scale discovery • Majority of value from Strategic Re

  17. Slide 17: The CMR Vision

    17 THE CMR VISION SHALLOW DRILLING FOR FEASIBILITY STUDY TO START RAPID GROWTH OF COPPER IMMEDIATELY WITH MINE EISA • Morocco is an excellent destination for mining RESOURCES ALREADY SUBMITTED • It is geologically well endowed with known but underexplored metallogenic belts • Its mining regulations

  18. Slide 18: Appendix

    18 APPENDIX GEOLOGY, ROCKS AND 1,000TPD COMPARATORS

  19. Slide 19: Orebody Thickness Analogues

    19 OREBODY THICKNESS ANALOGUES KUPFERSCHIEFER / LUBIN / KGHM : OREBODY CuEq GRADE DEPTH Mine Company WIDTH (m) GRADE (at 2.0M) (M) LUBIN KGHM POLSKA MIEDZ S.A 2.8 1.2% 1.2% 350-1000 MANSFELD MKM MANSFELD KUPFER 0.5 3.5% 1.0% 0-1000 AGA-MELLOUL CRITICAL MINERAL RES. 2.0* 1.2%* 1.2% 0-50 * 2.0m and 1.

  20. Slide 20: Initial Mine Development

    20 INITIAL MINE DEVELOPMENT

  21. Slide 21: Surface Mineralisation

    21 SURFACE MINERALISATION • Zones 1 and 2 characterized by shallow mineralization <60m depth • Surface mineralization at Zone 1 North • Open pit mining planned at several locations followed by shallow underground • Targeting an Initial Mine of 500 to 1,000tpd followed by expansion

  22. Slide 22: Development Progress to Date

    22 DEVELOPMENT PROGRESS TO DATE • EISA and Mining Licence application submitted – ML expected to be granted during 1H26 • Land access application submitted: 4-year lease automatically renewed, government-controlled land • Water studies commencing shortly • Planning for filtered tailings to extract m

  23. Slide 23: Metallurgy

    23 METALLURGY • Testwork undertaken by Afrilab in Marrakesh (SGS Certified) • Mineralogy and Metallurgy typical of West Anti-Atlas • Sulphide to oxide ratio of approx. 80:20 • Copper and silver sulphides must be recovered at the head of the circuit without sulphidation; oxidized copper is then recov

  24. Slide 24: Contact

    CONTACT CEO Charlie Long charlie.long@cmrplc.com REGISTERED OFFICE Eccleston Yards 25 Eccleston Place London SWIW 9NF