  1. Slide 1: Consolidation. High-Grade Exploration. Transformation.

    TSX.V MAU OTC MAUTF The Koné Gold Project: Consolidation. High-Grade Exploration. Transformation. CORPORATE PRESENTATION JANUARY 2023

  2. Slide 2: Cautionary Language

    Cautionary Language Introduction Montage Gold Corp. (“Montage” or the “Company”) is a Canadian-based precious metals exploration and development company focused on opportunities in Côte d’Ivoire. The Company’s flagship property is the Koné Gold Project, located in northwest Côte d’Ivoire, which curr

  3. Slide 3: Cautionary Language

    Cautionary Language Forward-looking Information Although Montage has attempted to identify important factors, assumptions and risks that could cause actual results to differ materially from those contained in forward-looking statements, there may be others that cause results not to be as anticipated

  4. Slide 4: Introduction to Montage

    Exploration License Syama Introduction to Montage Application N Sissingué Wahgnion 100km Bagoe Tongon Led by Former Red Back Mining Team Doropo § Recognized experts in Africa § Grew Red Back into intermediate producer; +US$7B sale in 2010 ABC § Discovery of Block 14 in Sudan (sold to Perseus in 2022

  5. Slide 5: Leadership Team

    Leadership Team RICK CLARK HUGH STUART ADAM SPENCER GLENN KONDO Chief Executive Officer President | B.Sc (Hons), M.Sc, FGS, CGeol EVP Corp. Development | CFA CFO | B.Comm, CA § 35+ Years in Mining Industry § 30+ Years in Exploration § 15+ Years in Mining Capital Markets § 20+ Years in Finance § Succ

  6. Slide 6: Strong Shareholder Backing

    Strong CAPITALIZATION Basic Shares Outstanding 160,504,290 Shareholder Options Outstanding1 8,500,000 Backing RSUs and DSUs 1,600,000 Fully-Diluted Shares Outstanding 170,604,290 OWNERSHIP 20.6% Close Price (TSXV:MAU) Jan 25, 2023 C$0.77 Basic Market Cap C$123.6M 9.8% Cash Position Dec 31, 2022 C$8.

  7. Slide 7: Positioned in Prolific Gold Belt

    Syama 6.1Moz Tabakoroni 1.5Moz Positioned in Prolific Gold Belt Sissingué 1.4Moz Waghnion Fimbiasso 0.3Moz 2Moz 2,258km2 Land Package 100% owned Bagoé 0.5Moz Tongon § Recently expanded through acquisition from Barrick/Endeavour 5Moz Kasseré 0.2Moz Koné Gold Project to Grow with Aggressive Exploratio

  8. Slide 8: Koné Deposit Provides an Excellent Start

    Koné Deposit Provides an Excellent Start Scale § 3.42Moz Probable Reserve at 0.66g/t 1 Low Strip § Less than 1:1 § 200m average true width Soft Rock § Bwi of 11kwh/t Great Infrastructure Koné Plant § Asphalt road to site Site 300m Simple Metallurgy Highway passing by Koné deposit § +90% recovery DFS

  9. Slide 9: Now with High-Grade Satellite Targets

    75 Sissédougou km • SISRC12_66: 60m at 2.70g/t Now with High- Key to Geology Basement (migmatites) TZ_2 (new) TZ_3 (new) • • SISDD11_06: 34.6m at 2.08g/t and 18.8m at 2.30g/t SISDD11_09: 23.0m at 2.14 g/t Grade Satellite Birimian Sediments Yeré North Birimian Volcanics • YETR001: 38.7m at 1.57g/t Di

  10. Slide 10: Gbongogo

    Gbongogo Hole ID From (m) To (m) Length (m) Au g/t HIGH GRADE HEAD START RC Drilling: GBRC022 3 30 27 1.87 Average grade of 2.1g/t from April 2022 Inferred Resource1 GBRC023A 1 38 37 2.49 GBRC024 0 95 95 2.03 § Over 3x higher than Koné deposit LOM average grade of 0.66g/t1 including 51 64 13 9.75 On

  11. Slide 11: Gbongogo

    Gbongogo PRIMARY TARGET FOR GROWTH Gbongogo North Gbongogo West Gbongogo Resource Gbongogo § Plunging diorite plug is not fully defined and is open to the South Legend north-east and south-west Planned Aircore holes +100ppb Soil Anomaly § Systematic Aircore drilling will test broader area 200m § Obj

  12. Slide 12: Gbongogo-Koban Trend

    Gbongogo-Koban Trend Korotou North East Koban North § Anomalous trend extending for 15km § Significant gold anomalism of +100ppb throughout Korotou East § New areas of artisanal mining recently Map Legend Koban identified Basement Qtz-Tourmaline Alteration (migmatites) Conglomerates Sena Western Sed

  13. Slide 13: Lokolo Trend

    Lokolo Trend Lokolo North LOKRC020: 13m at 1.75g/t § 17km strike on regional gold structure LOKRC021: 20m at 1.74g/t § Numerous areas of high-grade soil anomalies with frequent Lokolo West LOKRC003: 6m at 21.70g/t artisanal mining; multiple drill targets Lokolo Main LOKRC025: 20m at 2.45g/t LOKRC026

  14. Slide 14: Exploration Plan

    Exploration Plan Gbongogo RESOURCE Sissédougou Objectives over 12 months DEFINITION Petit Yao § Target Criteria: Anything grading >1.5g/t § Expand and Upgrade Gbongogo Inferred Resource Koban North § Advance multiple targets to resource Yeré North RESOURCE stage Lokolo Main POTENTIAL Lokolo South Se

  15. Slide 15: District Consolidated High-Grade

    District High-Grade Consolidated Exploration Strategy Aggressive 2,258km2 Land Package; Positions KGP for Significant Exploration Planned 85km strike-km Improvement Initial 25,000m drill program Strong Shareholder Value Backing Creation Perseus, Barrick, Revised economic study to Lundin, Endeavour,

  16. Slide 16: Hugh Stuart, President

    Hugh Stuart President hstuart@montagegoldcorp.com TSX.V MAU Adam Spencer EVP Corporate Development MontageGoldCorp.com aspencer@montagegoldcorp.com

  17. Slide 17: Local Impact & Community Relations

    Local Impact & Community Relations Montage Gold is backed by strong community support from the § Water wells in both Fadiadougou and Batogo surrounding villages of Fadiadougou, Batogo and Manabri. In § New classrooms constructed in Fadiadougou addition to being the largest employer in the area, Mont

  18. Slide 18: Mineral Reserves and Resources

    Mineral Reserves and Resources KONÉ – FEBRUARY 2022 MINERAL RESERVE ESTIMATE Oxide Transition Fresh Total Pit Classification Mt Au g/t Au Moz Mt Au g/t Au Moz Mt Au g/t Au Moz Mt Au g/t Au Moz South Pit Probable 9.8 0.57 0.18 7.9 0.56 0.14 141.4 0.67 3.05 159.1 0.66 3.39 North Pit Probable 0.9 0.47

  19. Slide 19: Disclosure Regarding Mineral Reserves and Resources

    Disclosure Regarding Mineral Reserves and Resources February 2022 Koné Mineral Reserve Estimate § The Mineral Reserves are classified according to the “CIM” definitions with an effective date of February 14, 2022. § All Mineral Reserves were classified as Probable based on the Indicated Mineral Reso