Tower Resources Plc · LSE:TRP

Tower Resources — Oilbarrel Presentation (July 2012)

22 slides from Tower Resources's conference presentation, July 2012

  1. Slide 1: Welcome - Oilbarrel Presentation

    Welcome Oilbarrel Presentation July 2012 © 2012 Tower Resources plc

  2. Slide 2: Board of Directors

    Tower Resources Board of Directors Graeme Thomson Jeremy Asher CEO Chairman § Graeme Thomson has over 30 years public company § Jeremy Asher is an experienced investor in natural resource experience, and has held a number of senior positions in the companies. oil and gas business. § He is Chairma

  3. Slide 3: Summary: Two Areas of Activity - Namibia

    Summary Two Areas of Activity Namibia • 15% interest in three offshore blocks (licence 0010) 12,000 km2 • 1,600 km2 3D seismic programme completed in 2011 • Delta Maastrichtian prospect: best estimate unrisked gross prospective resources of Delta Maastrichtian prospect unrisked 2.2bn boe with 40% GC

  4. Slide 4: Summary: Two Areas of Activity - Western Sahara

    Summary Two Areas of Activity Western Sahara • 50% interest in three licenses in the Saharawi Arab Democratic Republic • Operator is Wessex Petroleum PLC • Two offshore, one onshore • Operations cannot begin before sovereignty of the region has been finally resolved © 2012 Tower Resources plc 4

  5. Slide 5: Atlantic Margin Basins Geographically Analogous

    Namibia Atlantic Margin Basins Geographically Analogous • Brazil and Namibia shared similar geology during the early phase of South Atlantic break-up and pull apart • The Namibia offshore basins mirror the highly prospective Santos basin in Brazil • High exploration success rates in Brazil is of sig

  6. Slide 6: Correlation of the South Atlantic margins

    Namibia BRAZIL NAMIBIA Arcadia license Parana basin Etendeke volcanics Santos & Walvis basins Correlation of the South Atlantic margins and the Lower Cretaceous volcanics © 2012 Tower Resources plc 6

  7. Slide 7: Licence areas

    Namibia Licence areas Licence Area Ac-vity Timeline 1 Firm 1811A Q2/Q3 2012 1 Contingent 1910A 1 Firm 2013 1 Contingent 2013/2014 TBC 2 Firm 2012 3D seismic 0047 2012 4,150km2 1 firm 2714B 2012 1 Contingent Active local drilling schedule in 2012 anticipated to generate regular news flow © 2012 Tower

  8. Slide 8: Tower CPR Prospective Recoverable Resources

    Namibia Tower CPR Prospective Recoverable Resources June 2011 CPR Gross Unrisked Best Total Net Estimate* GCOS(%) / risked Horizon ECOS (%) Resources** § Calculated risked EMV10 for the Oil (MMstb) Gas (MM Boe) (BCF) prospec8ve resources of Tower in just the Delta Maastrich0an Delta Maastrich8an 2,

  9. Slide 9: Three significant structures identified

    Namibia Three significant structures identified Delta Maastrichtian Depth Map § 2010 3D clearly delineates five potentially large reservoirs on Delta, with total of 9.256bn STB Unrisked Gross Prospective resources § Maastrichtian and Palaeocene Prospects are the largest: – Combined best estimate U

  10. Slide 10: Strong evidence for hydrocarbon charge

    Namibia Strong evidence for hydrocarbon charge Delta § High resolution 3D seismic line showing -­‐ Very strong and continuous AVO anomalies at the Maastrichtian level -­‐ Numerous and lengthy pockmarks (chimneys) - indicating the presence of hydrocarbons - thereby boosting the GCOS to 40% -­‐ Large

  11. Slide 11: 3D AVO Soft-sediment deformation

    Namibia 3D AVO Soft-sediment deformation “Pock Marks” scattered across twt structure 3D View Paleocene & Deformation Features (vertical view) “Pock Marks” scattered across twt structure © 2012 Tower Resources plc 11

  12. Slide 12: Current position and next steps

    Namibia Current position and next steps Current Position • Two prospects, five leads and three plays identified on the licence confirmed by recent 3D seismic • Recent farm-out activity validates prospectivity of region and interest of major IOCs • Namibian Government has identified Repsol as negotia

  13. Slide 13: Funding

    Tower Resources Funding Cash Position • Approximately $2.6 million of cash on hand as of May 2012 • Last $8.6 million placing was oversubscribed, placed with just four institutions (and directors) • Yorkville’s $3.1 million promissory note fully repaid • Future working capital needs are also support

  14. Slide 14: Appendix

    Appendix © 2012 Tower Resources plc 14

  15. Slide 15: CPR assumptions

    Namibia CPR assumptions ICE UK Brent Futures Slate 31/5/11 (Year Average) ICE UK Gas Futures Slate 31/5/11 (Year Average) © 2012 Tower Resources plc 15

  16. Slide 16: Regional Aptian Lacustrine Clays Maturity Map

    Namibia Regional Aptian Lacustrine Clays Maturity Map After Geotrack International 1998 © 2012 Tower Resources plc 16

  17. Slide 17: Basin rifting continued to Late Cretaceous

    Generalised stratigraphy Hydrocarbon sources and reservoirs Shallow sands with gas Top regional seal Eocene-Oligocene sand Possibly 28m net Phi 20 –25% Sands Late Palaeocene sand Base Ter-ary Possibly 34m net Phi 20-25% Unconformi-es / Low yield oil shows in Upper Low stands Palaeocene sand Late Cre

  18. Slide 18: AVO responses

    Namibia AVO responses Palaeocene Ponded sands Shallow gas Maastrichtian anomaly Campanian © 2012 Tower Resources plc 18

  19. Slide 19: Maastrichtian Delta Prospect

    Namibia Maastrichtian Delta Prospect AVO Anomaly Map and Closure Areas Red area 128 sq Km CPR P99 Resource Yellow area 298 sq Km CPR P50 Resource Green area 734 sq Km CPR P1 Resource Outlines for 3 different degrees of AVO response © 2012 Tower Resources plc 19

  20. Slide 20: AVO Anomaly map

    Namibia AVO Anomaly map Far Stack (No AVO = blue) (rota8ng) © 2012 Tower Resources plc 20

  21. Slide 21: All closures

    Namibia All closures © 2012 Tower Resources plc 21

  22. Slide 22: Disclaimer - Important Notice

    Disclaimer Important Notice The information contained in these slides has been prepared by the directors of Tower Resources plc (the “Company”). The information contained in these slides, the presentation made to you verbally and any other information provided to you (in writing or otherwise) in con

Tower Resources — Oilbarrel Presentation (July 2012) on 6ix