  1. Slide 1: 2026 Interim results

    2026 Interim results 23 SEPTEMBER 2026

  2. Slide 2: Three key pillars of the growth story

    Three key pillars of the growth story 1. Sign new manufacturing licensees 2. Accelerate partners to market 3. Single stack technology platform 2 Ceres Power Ltd Ⓒ2026. All Rights Reserved.

  3. Slide 3: Progress against strategic pillars

    Progress against strategic pillars 1. Sign new manufacturing licensees Pipeline continues to grow and we remain confident on signing a new licensee this year 2. Accelerate partners to market • South Korea – Doosan sign c. £60 million contract to supply stacks to Reverion in Germany • Taiwan – Delta

  4. Slide 4: One platform, global factories and partnerships

    One platform, global factories and partnerships Reversible operation from a core cell and stack technology POWER Endura Cell Stack Factory HYDROGEN 4 Ceres Power Ltd Ⓒ2026. All Rights Reserved.

  5. Slide 5: The demand for power

    The demand for power 5 Ceres Power Ltd Ⓒ2026. All Rights Reserved.

  6. Slide 6: Manufacturing partnerships enable shorter timelines

    Manufacturing partnerships enable shorter timelines Gas Up to 5 –7 years turbines Small modular 7 – 10 years Time to power reactors Grid 5 – 10+ years connection First < 4 years factory Current < 3 years Time to market factories Next < 2 years factories 1. US gas -fired turbine wait times as much as

  7. Slide 7: Why does Ceres Endura SOFC win in the power market

    Why does Ceres ® Endura SOFC win in the power market Time to power Cost competitive 800V DC Permitting compatible Designed for cost, efficiency, and scaled manufacturing 7 Ceres Power Ltd Ⓒ2026. All Rights Reserved.

  8. Slide 8: Large, attractive markets for solid oxide fuel cell power

    Large, attractive markets for solid oxide fuel cell power Global market opportunity for solid oxide is forecast at 22GW by 2030 Market opportunity drivers by end use Market opportunity by region case 8% 7% Shipping RoW 49% Data centre 28 % 19% 50 % EMEA Industry India, 22GW 22GW China p.a by 2030 p.

  9. Slide 9: Doosan sign c.£60m contract for stack supply

    Doosan sign c.£60m contract for stack supply • Reverion will integrate SOFC stacks into reversible systems for power facilities in Germany and Europe. • This is Doosan’s first export contract for SOFC. 9 Ceres Power Ltd Ⓒ2026. All Rights Reserved. Image courtesy of Doosan

  10. Slide 10: Delta progressing on time with initial capacity

    Delta progressing on time with initial capacity • Pilot production targeting end of 2026 at Tainan • Delta announces plans to expand capacity to mass manufacture fuel cells in Guanyin 10 Ceres Power Ltd Ⓒ2026. All Rights Reserved. Image credit to Delta Electronics – Tainan factory

  11. Slide 11: Ceres and Centrica sign strategic partnership

    Ceres and Centrica sign strategic partnership • Aim to accelerate the deployment of solid oxide on -site power solutions to meet the multi -GW demand from commercial and industrial customers across UK and Europe • Published joint white paper reviewing on -site power generation 11 Ceres Power Ltd Ⓒ20

  12. Slide 12: Delta and Centrica sign infrastructure partnership

    Delta and Centrica sign infrastructure partnership • Targeting the data centres and energy intensive industries in the UK and Europe markets with SOFC off -grid energy generation 13 Ceres Power Ltd Ⓒ2026. All Rights Reserved. Image courtesy of Delta Electronics

  13. Slide 13: Weichai targeting 200 MW by end of 2027

    Weichai targeting 200 MW by end of 2027 • Weichai subsidiary Baudouin announce plans with EODev to deploy 600 kW SOFC systems across Europe 14 Ceres Power Ltd Ⓒ2026. All Rights Reserved. Image credit to Weichai Power

  14. Slide 14: Hydrogen progress

    Hydrogen progress 15 Ceres Power Ltd Ⓒ2026. All Rights Reserved.

  15. Slide 15: Partners continue to progress as market develops

    Partners continue to progress as market develops Denso: Government funding Shell: 1MW demonstrator Thermax: Pilot plant DENSO receives c.£165 Shell demonstrator Thermax establishing million in government exceeding expectations pilot plant in Pune, India. funding. for daily hydrogen production 16 Cer

  16. Slide 16: Green hydrogen remains a large, long-term opportunity

    Green hydrogen remains a large, long -term opportunity Industrial power will be the most compatible for SOEC technology Hydrogen production opportunity Next generation pressurised SOEC module 9% Row 4% USA 8% Europe 38 GW 44% China p.a. by 2035 18% Middle East 18% India 17 Ceres Power Ltd Ⓒ2026. All

  17. Slide 17: Becoming the industry standard for solid oxide

    Becoming the industry standard for solid oxide Global ecosystem of world -class partners Manufacturing partners Technology Innovation Centre Systems / Channel partners 18 Ceres Power Ltd Ⓒ2026. All Rights Reserved.

  18. Slide 18: Financial update

    Financial update 19 Ceres Power Ltd Ⓒ2026. All Rights Reserved.

  19. Slide 19: Financial review

    Financial review For the six months ended 30 June 2026 Revenue Gross margin Gross profit Adjusted EBITDA £22.8m 71% £ 16.1m (£6.8m) H1 2025: £21.1m H1 2025: 79% H1 2025: £16.6m H1 2025: (£11.3m) R&D costs June 2026 fundraise Cash and short -term Underlying investments Cash outflow* £18.3 m £102.6m £

  20. Slide 20: Revenue and gross profit

    Revenue and gross profit Sector leading gross margin maintained Revenue and gross profit £m • Contracted revenue for the year is £45 million • We have successfully executed our contracts to recognised £22.8 million in the first six months 21 Ceres Power Ltd Ⓒ2026. All Rights Reserved.

  21. Slide 21: Business transformation plan to drive future growth

    Business transformation plan to drive future growth Optimising our business for the path ahead Thus far we have successfully, • Realigned Ceres into focused delivery driven teams • Commercially launched our best -in-class, dual -purpose Ceres ® Endura stack platform serving both power and hydrogen m

  22. Slide 22: Optimised cost base for commercial phase

    Optimised cost base for commercial phase The right size to enable the next phase of growth while maintaining leading edge technology • Adjusted OpEx has decreased c.25% over the 12 months since H1 2025. • Adjusted OpEx costs reduced in H1 2026 due to cost base optimisation due to business transforma

  23. Slide 23: Commercial focus reducing cash outflow

    Commercial focus reducing cash outflow £m • H1 2026 cash outflow reduced to £10.4m, supported by a 14% reduction in operating costs and lower R&D expenditure as investment became increasingly focused on commercial opportunities and partner scale -up. • H1 2025 benefited from one -off customer receip

  24. Slide 24: Positioning Ceres to take full advantage of the opportunity

    Positioning Ceres to take full advantage of the opportunity Power demand is accelerating - Time to power is now the defining constraint. Ceres has built the Endura platform designed to scale at pace with world class partners. Our aim is for our technology to become the global standard that the globa

  25. Slide 25: Thank you