Slide 1: Schedule 14A Proxy Statement - Whiting Petroleum Corporation
UNITED STATES SECURITIES AND EXCHANGE COMMISSION WASHINGTON, D.C. 20549 SCHEDULE 14A Proxy Statement Pursuant to Section 14(a) of the Securities Exchange Act of 1934 (Amendment No. ) Filed by the Registrant x Filed by a party other than the Registrant ¨ Check the appropriate box: ¨ Preliminary Proxy
Slide 2: Form, Schedule or Registration Statement No.; Filing party; Date Filed
(2) Form, Schedule or Registration Statement No.: (3) Filing party: (4) Date Filed:
Slide 3: Whiting Investor Update: Leading in Technology to Unlock America's Oil Riches
Whiting in ENERGY Leading WHITING Investor November Update Petroleum +12, Technology TECHNOLOGY 2014Corporation to Unlock = GROWTH America’s Oil Riches
Slide 4: Forward-Looking Statements and Non-GAAP Measures
Forward-Looking Measures, This statements shareholders, levels actual proposed from gas plans, on expectations affected In reconciliation economically operate likely additional Whiting potentially contingencies which since quantities actually NYSE: 2Energy this Form prices; presentation the the as o
Slide 5: Corporate Overview
Corporate Jim Whiting NYSE: 3Energy Volker + WLL CEO, Technology Overview - Chairman, Jim Volker, = President WHITING and Timbro &Growth CEORanch Managing Partner, Ron Timmerman, Review Whiting’s Redtail Prospect Development Plans on the Timbro Ranch in Weld County, Colorado
Slide 6: Whiting Achievements: Record Production and Strong Well Results
Whiting Four 1) 2) 3) -4) NYSE: 4Energy Record Brehm Pronghorn Sundheim Flatland New Current Tarpon Record Slickwater Redtail Significant Niobrara Codell/Fort + WLL Petroleum 13-7H Bakken Production Technology Federal Pad Production Niobrara 21-27-1H Federal Completions Demonstrates Well “C” Third /
Slide 7: A Focused Asset Base: Williston and Niobrara
A16.8 Williston Niobrara Redtail Denver, HEADQUARTERS North Over Major (1) Q3 116.7 Rocky 87% 3% 10% Bakken 100.0 80.0 60.0 40.0 -20.0 30% 2009 MBOE/d NYSE: 5Energy Focused At 2014 63.5 48.9 30.3 26.3 CAGR 9,500 2010 MBOE/d 87.5 Ward December Asset Mountains + WLL /Colorado Net A Three Technology 20
Slide 8: Williston Basin October Record Production
Williston October Record Flatland Iverson Strongest producer clusters Brehm Additional Sovig rate Increased per Sundheim had 200-day production offsetting Slickwater IP: 30-Day 60-Day Lineament Brockton-Froid Divide Sheridan MISSOURI Roosevelt STARBUCK HIDDEN TARPON CASSANDRA Richland LEWIS McKenzie
Slide 9: Maximizing Recovery: Improving Completion Efficiency
Maximizing Improving Older 250 300 Sliding Free New Annulus Cemented NYSE: 7Energy fluid Style Style + WLL Sleeve Stages Technology between Liner 40 Frac Recovery 3Completion 120 Distribution Frac Perforation Completion packers Ports =Efficiency WHITING per 30 Clusters 1Stage 30 Growth per Potential
Slide 10: Exploiting Primary Objectives in the Williston
Exploiting Primary MISSOURI HIDDEN 16 Lower U. Middle L. Pronghorn Upr CURRENT POTENTIAL NEW LEASE NYSE: 8Energy WELLS Bakken Bakken WELLS 3Fks OBJECTIVES Virden + WLL Bakken LINE and Technology –BENCH 12 Shale Silt the Sand Shale 1st 2nd 6DRILLING BREAKS Prospective WELLS HIGH 0’ &Bakken Bench 100’
Slide 11: Maximizing Recovery: Improving 24-Hour Production Rates
Maximizing Improving 1,000 1,122 1,500 2,000 2,132 2,500 2,539 3,000 -2658 500 535 24-Hour NYSE: 9Energy 013648 2014 887 + WLL IP Technology 805 Hidden 30-Day Recovery +21% Bench Avg. =Efficiency WHITING 60-Day Production Avg. Growth Rates 90-Day - 21% Avg.Increase Over 90-Days
Slide 12: Williston Basin Well Economics
Williston Per Daily EUR (BOEPD) Nymex ROI IRR Payout 01PV(10) 100 1,000 Months 180 168 156 144 132 120 108 96 84 72 60 48 36 24 (1) of (2) equivalent NYSE: Energy 10 2 our Please EURs, Well (%) 2.3 -Equivalent oil 600 (Yrs.) + WLL oil $MM On 2.7 43% Results: Technology Basin and refer ROIs, differen
Slide 13: Redtail Economic Development Plan Highlights
Economic (Weld (Gas 1Pre 350 450 550 650 > Wattenberg Larimer Weld Laramie Redtail Logan Cheyenne Kimball Broomfield Boulder Colorado Source: KS CO NE SD WY OBJECTIVE Niobrara Fort DEVELOPMENT 8Mix 3,300+ on Whiting •ACREAGE COMPLETED Horizontal: DRILLING -Recently NYSE: Energy 11 Average The Wells
Slide 14: Redtail Well Economics
Redtail Per Daily EUR Nymex ROI IRR Payout 01PV(10) 10 100 1000 (1) Months 180 168 156 144 132 120 108 96 84 72 60 48 36 24 present (2) NYSE: Energy 12 2 EURs, Please Well (%) 2.5 -Equivalent 420 (Yrs.) + WLL the Niobrara oil $MM 3.1 42% Results: Technology refer ROIs, price/Bbl MBOE, fair 3.6 2.0 3
Slide 15: Consistently Focused on Delivering Strong Margins
Consistently Oil NGL Gas Whiting $90.00 $/BOE $73.88 $80.00 $70.00 $45.01 $60.00 $50.00 $30.00 $40.00 $41.58/68% 2% 5% $20.00 7% $10.00 2009 $0.00 Lease (1) NYSE: Energy 13 Includes Focused $86.78/Bbl 3% 2% 7% $4.08/Mcf 2010 $36.01/Bbl Operating $80.00 $76.76 $69.85 $61.48 $50.89/66% $50.65/68% $25.
Slide 16: Redtail Development Plan Overview
NYSE: + Redtail Surveyed Energy 14 WLL Geology Technology Wellhead andlocations Development = WHITING for thePlan Growth Horsetail Overview 30F Super Pad
Slide 17: Geologic Trending, Redtail Prospect
NYSE: Geologic NE COLORADO WYOMING Redtail Oil Nat. Extension Energy 15 Trending, Gas+ WLL Development Prospect Technology Sweet of Colorado Right SpotLateral Program =Mineral WHITING Wrench BeltGrowth Faults
Slide 18: Redtail Economic Development Plan Highlights
NYSE: Economic (Weld (Gas 1Pre 350 450 550 650 > Wattenberg Colorado Redtail Source: OBJECTIVE Niobrara Fort DEVELOPMENT 8Mix Whiting •ACREAGE COMPLETED Horizontal: DRILLING -Recently Energy 16 Average The Wells –750 350 2013 –Hays/Codell of converted Razor 450 550 650 750 County, 960 + WLL Developm
Slide 19: Determining Reservoir Pore Characteristics
NYSE: Determining 1Molecular Conventional Unconventional 6Reservoirs % Pore Hydrocarbon 10-9 Diameter (1000 Energy 17Nanometer 5Micrometer of4 Throats 10-8 Total 3nanometers 2+ WLL 1Technology (M) 10-7 Diameters (non-effective) mobile Species Oil 10-6 Reservoir Oil Reservoirs = Reservoirs 1fraction
Slide 20: Unconventional Reservoir Characterization
NYSE: Unconventional Denver Core Logging Sample In-house Operated Collaboration Over Environmental Micron-scale Rapid Alter Mineral Quantitative Petrophysical Accurate Nanometer Dual-beam 3D Reservoir Organics Porosity Pore Permeability Energy 18 Composite throat Layout 250 Atmospheric Analysis + WL
Slide 21: Opportunity: High-Resolution Niobrara Imaging
NYSE: Opportunity High-resolution (nanometer 5(oil 7% Middle 9985’ Braaflat Sanish Mountrail 13% Niobrara 5580.2’ Terrace Redtail Weld Energy 19microns Porosity molecules Porosity County, Field Area + WLL Development Bakken 36-32M 11-11 B Technology County, Chalk =and 1CO =thousandth Bpore 20 Challe
Slide 22: Redtail Resource Potential
NYSE: Redtail Whiting 0GR F C B A 5875 5850 5825 5800 5775 5750 5725 5700 5675 5650 5625 5600 5575 5550 (1) Niobrara OOIP Reservoir NIO 70 16 10% 370 Recoverable (Total 32 15% *330 ** Energy 20 RHS 200 GOR=500 wells Stimulated Please Zone MBOE A B C Recovery 30 by OOIP 13% 11% + WLL Development RAZO
Slide 23: Redtail Defining Optimal Well Density
NYSE: Redtail Defining Razor 16 27L 27K Horsetail 32 7920 30F -Drilling Target: Status: 1A-B-C-B C B A NIOBRARA Producing Planned Future Energy 21 320 16Wells 330 32 165Pad Wells/DSU Pad ft.Pilot Infill Producing Drilling A-B-A-B B-B-B-B C-B-A-B- + WLL Development Density Wells /Optimal Technology P
Slide 24: Redtail Drilling Inventory and Development Plan
NYSE: Drilling 2014 Includes Gross 84% (Total 1,654 Based wells/DSU Redtail Legend 2013 Existing Status Future Township Permitted Energy Non-Operated Operated = 22WHITING Average –Net Operated Locations: on Locations 2018 + WLL Development 16 Inventory Wells Approximately Technology 8Wells) (WOGC We
Slide 25: Redtail Rig Schedule
NYSE: Redtail Rig July 2013 Six Five 4/1/2015 Four 11/15/2014 Three 7/20/2014 Two 2/14/2014 One 11/7/2013 Energy 7/17/2013 23 Rigs Schedule Rig Jan Rigs Rigs 2014 Rigs + WLL Development July Technology 2014 Jan2015 July Plan = Jan 2015 WHITING July 2016 2016 Growth
Slide 26: Redtail Drilling Process Overview
NYSE:Walton Drilling Doug Redtail Energy 24 + WLL Drilling Process Technology – Vice Rig Overview on President = the WHITING Razor National 26L Growth pad Drilling
Slide 27: Typical Niobrara Well Construction
NYSE: Typical SURFACE: CONDUCTOR: •PRESET VERTICAL: •ABOVE FW/POLYMER •NIOBRARA 9.5-9.7PPG LATERAL: •TARGET: •LINER: SWELL •640 •960 •CEMENTED •HOLE CURVE: SLIDING •KOP: •DEPTH: •BUILD •MUD: 90-DEG) •CASING: PDC/MM/MWD/GAMMA •BIT/BHA: •CEMENT: •DURATION: •ISSUES: DETECTABLE Energy NIOBRARA 25 -10,50
Slide 28: Frontier Rig 26
NYSE: Frontier DRAWWORKS: MAST: SUBSTRUCTURE: GENERATORS: SCR: TOP IRON ROTARY BOP: MUD Agitators, SHALE CHOKE FUEL WATER DOG CHANGE BLOCK SKID MISCELLANEOUS: Spare Energy 26 DRIVE: HOUSE: 4-Bay 11” Parts PACKAGE: PUMPS: SYSTEM: ROUGHNECK: TANK: + WLL 142’ 26 SHAKERS: TANK: HOOK: MANIFOLD: Technolog
Slide 29: Drilling Cost and Spud to TD Days
NYSE: 25 Spud 10 $1.35 6.7 Horsetail Razor Drilling $0.0 $0.5 $1.0 $1.5 $2.0 $2.5 $3.0 Energy 27 Well 20 Days to 15 MM 27I-3415A Federal 26I-2314B 26L-3503A 26L-3504B 21A-0913 + WLL Avg TD Moving Time Cost 10 Technology 30F-3105 30F-1944 (Days) 5Drlg before /026J-… Cost Average Horsetail Razor Cost
Slide 30: Redtail Well Completion and Operations Overview
Well Completion Mike NYSE: Redtail Energy 28 Stahl + Tank WLL Technology - Operations Battery and Operations = WHITING ManagerOverview Growth
Slide 31: Optimizing Completions: Improving Well Performance
Optimizing NYSE: Improving –Reducing Driving Energy 29Right-sizing Implementing Decreasing Simultaneous + WLL completed Technology completion cycle well Completions payout jobs time performance operations newwell time, technologies cost = WHITING cost through higher to $5.5 NPV increased Growth mill
Slide 32: Optimizing Frac Design: Proppant Pumped per Well
Total NYSE: 5.0 6.0 7.0 8.0 9.0 Optimizing 0.0 1.0 2.0 3.0 4.0 Well Energy 30 Million Count Proppant + WLL Technology Lbs FracPumped Design = WHITING per Avg.Well 5.5 mm Growth # sand
Slide 33: Stimulation Costs per Lb of Sand Down
NYSE: $/ Well $0.00 $0.10 $0.20 $0.30 $0.40 $0.50 $0.60 $0.70 $0.80 $0.90 $1.00 Energy 31 LBCount Stimulation Stim + WLL Technology Costs per Cost Lb= of WHITING Sand Down Growth Approx. 50% per Econ. of Scale
Slide 34: Frac Stages per Well
NYSE: Frac 50 Stages Well Energy 32 45Stages Count 40+ WLL 35 Technology Per 30 25 Well: 20 15 3= Entry WHITING 10 5 0PointsGrowth per Stage = 120 Entry Points
Slide 35: Redtail Water Storage and Frac Water Balance
NYSE: Redtail Assumes Storage Eliminating Water 0O 500,000 1,000,000 1,500,000 2,000,000 2,500,000 3,000,000 3,500,000 4,000,000 4,500,000 5,000,000 Energy 33ct-14Balance Nov-14 + WLL Frac (bbl) 13 Technology 15,000 Stages Water Available Dec-14 Forecasting truck per= day Jan-15 WHITING Storage trip
Slide 36: Developing Redtail Water Distribution System
NYSE: Developing Redtail Completion GAS PIT Google -Distribution 1Delivered As Energy 34 16 mile of A H miles PLANT September PIT PIT N+ Water WLL earth Technology Cost of B CInfrastructure: (fresh) System line PIT PIT of30, E$1.60 I water PIT 2014 = WHITING D per supply Saving Bbl Water and $1/Bbl
Slide 37: Niobrara Current Drilling and Completion Plans
NYSE: Niobrara Drilling Both Current Utilizing Averaging Stage Early Currently Supplying Fuel Conversion Energy 35 N-S jobs Density + WLL Plans Stimulation Orientation Development aTechnology and completing utilized processed 5.5 hybrid started E-W million design stage Q3 lateral Job gas 150-180 =lb
Slide 38: Niobrara Future Completion Plans
NYSE: Niobrara Future Completion Performed Frac Comparing Pumped Installing Water 4.0 All Saves Reducing Logistics Evaluating Target Energy 36 million freshwater Fluids approx. reduction Plans + WLL two Development Technology freshwater spud-to two sleeve produced Sim-Ops bbl complex Hardware slickw
Slide 39: Redtail Midstream Plans
NYSE: Midstream Phil Redtail Energy 37 Archer + WLL Gas Technology Plans -Plant Midstream = WHITING Manager Growth
Slide 40: Midstream Plans: Complete Gas, Oil and Water Services
NYSE: Midstream Complete Gas, Electricity, –Sales Second NGL Energy 38 Trailblazer 13 Communication Pony Future Gathering Utility Oil y-grade pipelines Express + WLL gas and planned Technology oil supply Plans Fuel pipeline Produced gas field pipeline services by oil Gas pipeline sales services othe
Slide 41: Planned Capital Investment in Gathering Infrastructure
NYSE: September Planned SW Frac Train Takeaway Capital Gas Oil Electricity Total Trailblazer REX Trailblazer/REX Redtail Tallgrass UET Pony OPPL WY 3rd CO Energy NGL GAS OIL Other 39 Gathering Party Gathering Plant NE Water Pawnee to $315 Express 1to+ 2 3 WLL Capacity Infrastructure Facilities Inves
Slide 42: Redtail Central Production Battery Capital Savings
NYSE: Redtail CPB Construct Reduce Centralized Oil Treaters, LACT, Gas VRUs/ECDs Capital Traditional CPBs Total Operated Utilities DSU Pad Energy 40 Tanks/ A Lift Drivers Savings (32 Pad Gas + WLL Central Investment capital equipment Sales 1st Measurement Wells Technology wells) simultaneous B Water