Slide 1: Challenges in Generation at Nathpa Jhakri Power Station Due to Heavy Silt
CHALLENGES IN GENERATION AT NATHPA JHAKRI POWER STATION (1500 MW) DUE TO HEAVY SILT IN RIVER SATLUJ A PRESENTATION AT POWER– GEN INDIA & CENTRAL ASIA 2006 (INTERNATIONAL CONFERENCE) By 26th Oct, 2006 H.K. SHARMA New Delhi CMD, SJVNL. SHIMLA

Slide 2: Brief Description of Nathpa Jhakri Project: Layout Plan
BRIEF DESCRIPTION OF NATHPA JHAKRI PROJECT LAYOUT PLAN HRT VI FACE RATTANPUR 2301 m MANGLAD 2526 m DAM. INTAKE & DESILTING POWER 6475 m COMPLEX HOUSE SHOLDING (CONTRACT 1.0) COMPLEX NUGALSARI NH-22 (CONTRACT 3.0) SATLUJ RIVER 888 m 4791 m 4008 m 6375 m WADHAL NATHPA CONTRACT 2.1 CONTRACT 2.2 (Total

Slide 3: Brief Description: Diversion Dam
BRIEF DESCRIPTION OF NATHPA JHAKRI PROJECT- CONTD. DIVERSION DAM TYPE - CONCRETE GRAVITY HEIGHT- 62.5 M, LENGTH – 185.45 M DESIGN FLOOD – 5660 CUM

Slide 4: Brief Description: Nathpa Reservoir
BRIEF DESCRIPTION OF NATHPA JHAKRI PROJECT- CONTD. NATHPA RESERVOIR LIVE STORAGE- 303 HAM (at EL 1495.5m) , AREA = 23.45 HA RESRVOIR LENGTH= 2.5 KM LIVE STORAGE- 111 HAM (at EL 1485.0m), AREA= 14.22 HA RESRVOIR LENGTH= 1.1 KM

Slide 5: Brief Description: Intake Structure
BRIEF DESCRIPTION OF NATHPA JHAKRI PROJECT-CONTD. INTAKE STRUCTURE NUMBER - FOUR NUMBER, OPENING SIZE - 6.0 M X 5.25 M

Slide 6: Brief Description: Desilting Chambers
BRIEF DESCRIPTION OF NATHPA JHAKRI PROJECT-CONTD. DESILTING CHAMBERS FOUR NUMBER UNDER GROUND EGG SHAPED, EACH 525 M LONG, 16.31 M WIDE & 27.5 M HIGH {One of the largest Desilting Chambers in the World}

Slide 7: Brief Description: Head Race Tunnel
BRIEF DESCRIPTION OF NATHPA JHAKRI PROJECT-CONTD. HEAD RACE TUNNEL CROSS SECTION - 10.15 M CIRCULAR, CONC. LINED LENGTH - 27.4 KM. LOW COVER REACHES - STEEL LINED 8.5 M DIA NEAR MANGLAD & DAJ CREEKS

Slide 8: Brief Description: Surge Shaft
BRIEF DESCRIPTION OF NATHPA JHAKRI PROJECT-CONTD. VIEW OF SURGE SHAFT TOP SURGE SHAFT TYPE - RESTRICTED ORIFICE WITH POND AT TOP AND A LOWER EXPANSION GALLERY HEIGHT - 301 M DIAMETER - 21.6 M FOR 210 M HEIGHT - 10.2 M FOR CONNECTING SHAFT 86 M HIGH

Slide 9: Brief Description: Power House Machine Hall
BRIEF DESCRIPTION OF NATHPA JHAKRI PROJECT-CONTD. POWER HOUSE-MACHINE HALL TYPE - UNDERGROUND SIZE - 222 M (L) X 20 M (W) X 49 M (H) TYPE - VERTICAL AXIS FRANCIS TURBINE NO. & CAPACITY - 6 X 250 MW DESIGN ENERGY 50% MEAN YEAR - 7351 GWH 90% DEPENDABLE YEAR - 6951 GWH

Slide 10: Brief Description: Transformer Hall & Switchgear
BRIEF DESCRIPTION OF NATHPA JHAKRI PROJECT-CONTD. TRANSFORMER HALL & SWITHGEAR EQUIPMENT HOUSED – UNIT TRANSFORMERS, SWITCHGEAR & DRAFT TUBE GATES CAVITY SIZE - 196 M X 17.5 M X 27.4 M

Slide 11: Brief Description: TRT Outfall & Tail Race Tunnel
BRIEF DESCRIPTION OF NATHPA JHAKRI PROJECT-CONTD. TRT OUTFALL & TAIL RACE TUNNEL TAIL RACE - 10.15 M DIA CIRCULAR, CONC. LINED TUNNEL, 982 M LONG

Slide 12: Special Features Helpful in Overcoming Silt Damages
SPECIAL FEATURE- HELPFUL IN OVECOMING SILT DAMGES • TURBINES :- • THE DESIGN OF TURBINES PERMIT RUNNER REPLACEMENT FROM BOTTOM BY REMOVAL OF DRAFT TUBE CONES. • UNDERWATER PARTS LIKE RUNNERS, GUIDE VANES, CHEEKPLATES, LYBRINTH SEALS CAN BE REPLACED FROM BOTTOM ITSELF. • COOLING SYSTEM :- • COOLING S

Slide 13: Nathpa Jhakri Project Benefits
NATHPA JHAKRI PROJECT HYDRO ELECTRIC PROJECT BENEFITS ¾ GENERATION OF ABOUT 6924 MU OF ELECTRICAL ENERGY ANNUALLY . ¾ 1500 MW VALUABLE PEAKING POWER TO ENERGY STARVED NORTHERN GRID. ¾ 12% FREE POWER TO HIMACHAL PRADESH AND 25% OF BALANCE AT BUS BAR RATES TO HP. ¾ ALLOCATION OF POWER BY MOP, GOI TO T

Slide 14: Distribution / Allocation of Power
NATHPA JHAKRI PROJECT DISTRIBUTION / ALLOCATION OF POWER Sr. No. State Allocation Percentage of the installed (in MW) capacity 1 Haryana 64 4.27 2 Himachal Pradesh* 547 36.47 3 Jammu & Kashmir 105 7.00 4 Punjab 114 7.60 5 Rajasthan 112 7.47 6 Uttar Pradesh 221 14.73 7 Uttaranchal 38 2.53 8 Chandigar

Slide 15: Nathpa Jhakri Net Profit
NATHPA JHAKRI HYDRO ELECTRIC PROJECT NET PROFIT 495.18 500 400 298.42 Rs. in Crores 300 200 100 0 2004-05 2005-06 YEAR

Slide 16: Satluj Basin - Silt Data
SATLUJ BASIN - SILT DATA

Slide 17: Catchment Area of Satluj Basin
CATCHMENT AREA OF SATLUJ BASIN INDO-TIBETAN BORDER SPITI RIVER SUMDO NATHPA JHAKRI POWER STATION SATLUJ RIVER KHAB BHAKRA DAM MANSAROVER

Slide 18: Silt Load in River Satluj: Catchment Area Characteristics
SILT LOAD IN RIVER SATLUJ CATCHMENT AREA CHARACTERSTICS • RIVER SATLUJ HAS A CATCHEMNT OF 49,820 SQ. KM AT NATHPA • 12,920 SQ. KM IS IN INDIA AND 36,900 SQ. KM IN TIBET/CHINA • BECAUSE OF FRAGILE GEOLOGY AND STEEP SLOPES, SOIL EROSION RATE IS HIGH DURING SNOWMELT • RIVER BLOCKADE ON ACCOUNT OF AVALA

Slide 19: Slope Deposits on Right Bank of Spiti River
SILT LOAD IN RIVER SATLUJ- CONTD. VIEW OF SLOPE DEPOSITS ON RIGHT BANK OF SPITI RIVER BETWEEN LOSAR & PIN-SPITI CONFLUENCE SLOPE SLOPE DEPOSITS DEPOSITS

Slide 20: Deposits on Left Bank of Spiti River
SILT LOAD IN RIVER SATLUJ- CONTD. VIEW OF DEPOSITS ON LEFT BANK OF SPITI RIVER BETWEEN LOSAR & PIN-SPITI CONFLUENCE DEPOSITS OF NALLAH SLOPE SLOPE DEPOSITS DEPOSITS SPITI RIVER

Slide 21: Lake Formation Due to Maling Slide
SPITI RIVER LAKE FORMATION DUE TO MALING SLIDE MALING SLIDE A view of lake formation due to Maling slide (80 km u/s Nathpa Dam)

Slide 22: Valley and Fan Deposits of Spiti River
GLACIALDEPO SIT SPITI RIVER SPITI RIVER A view of wide valley & fan deposits of Spiti river, d/s of Pooh village near Khab.

Slide 23: Glacial Deposits on Left Bank of Satluj River
A view of glacial deposits on left bank of Satluj river, d/s of Morang (67 km u/s of Nathpa Dam)

Slide 24: River Terrace Deposits Along Satluj River
A view of river terrace deposits along Satluj river between Jangi &Akpa (located at 58km & 70 km u/s of Nathpa Dam)

Slide 25: Satellite Imagery of Satluj Catchment Area (Parechu Lake)
Satellite Imagery of Satluj Catchment Area (Parechu lake) (Source: Hindustan Times 19.8.2004)

Slide 26: Satluj Catchment Topography in Tibet Region
Satluj Catchment topography in Tibet region

Slide 27: Satluj Catchment Topography in Tibet Region
Satluj Catchment topography in Tibet region

Slide 28: Satluj Catchment Topography in Tibet Region
Satluj Catchment topography in Tibet region

Slide 29: Satluj Catchment Topography in Tibet Region
Satluj Catchment topography in Tibet region

Slide 30: Satluj Catchment Topography in Tibet Region
Satluj Catchment topography in Tibet region

Slide 31: Suspended Sediment Load (PPM Range for Number of Days)
SUSPENDED SEDIMENT LOAD (PPM RANGE FOR THE NUMBER OF DAYS) (CONTD.)... S. NO. YEAR PPM PPM PPM PPM PPM <1000 1000 To 2001 TO 4001 TO >5000 2000 4000 5000 1 1971 279 45 40 - 1 2 1972 292 67 7 - - 3 1973 214 48 82 6 15 4 1974 303 56 6 - - 5 1975 251 58 45 5 6 6 1976 305 39 19 2 1 7 1977 320 25 15 3 2

Slide 32: Suspended Sediment Load (PPM Range for Number of Days)
SUSPENDED SEDIMENT LOAD (PPM RANGE FOR THE NUMBER OF DAYS) S. NO. YEAR PPM PPM PPM PPM PPM <1000 1000 To 2001 TO 4001 TO >5000 2000 4000 5000 15 1985 315 43 7 - - 16 1986 282 47 17 12 7 17 1987 339 21 5 - - 18 1988 341 20 5 - - 19 1989 301 38 25 1 - 20 1990 304 51 10 - - 21 1991 263 58 37 6 1 22 199

Slide 33: Silt Load Data at Wangtu Bridge (1997-2003)
SILT LOAD DATA OF RIVER SATLUJ OBSERVED AT WANGTU BRIDGE (1997-2003) S.NO. YEAR PPM PPM PPM 2001 TO 4001 TO >5000 4000 5000 1 1997 29 10 13 2 1998 33 12 16 3 1999 43 9 14 4 2000 64 21 28 5 2001 39 8 13 6 2002 35 7 12 7 2003 22 11 17 Average 37.85 11.14 16.14

Slide 34: Silt Load Data at Wangtu Bridge (2004-2006)
SILT LOAD DATA OF RIVER SATLUJ OBSERVED AT WANGTU BRIDGE (2004 TO 2006) S.NO. YEAR PPM PPM PPM 2001 TO 4001 TO >5000 4000 5000 1 2004 17 5 13 2 2005 23 8 53 3 2006 43 5 27 Average 27.66 6.00 31.00

Slide 35: Silt Load: Gradation of Suspended Silt Load
SILT LOAD IN RIVER SATLUJ- CONTD. GRADATION OF SUSPENDED SILT LOAD The maximum and minimum range of fractions for the years 1970 to 1996 is as follows : Coarse % Medium% Fine% Max. 28.00 36.67 85.00 Min. 5.00 10.00 42.00 Average 15.72 22.36 61.92 However, during the recent period there is considerab

Slide 36: Silt Load: Gradation Before and After Parechu Flood
SILT LOAD IN RIVER SATLUJ- CONTD. GRADATION OF SUSPENDED SILT LOAD PERCENTAGE OF COARSE, MEDIUM AND FINE FRACTIONS IN SUSPENDED SEDEMENTS- AS OBSERVED RECENTLY IN SATLUJ AT NATHPA DATE COARSE MEDIUM FINE REMARKS 19.06.05 TO 21.9% 33.5% 44.6% BEFORE FLOOD 22.06.05 27.06.05 TO 32.7% 25.1% 42.2% IMMEDI

Slide 37: Changing Trend of Silt Inflow: 2005
CHANGING TREND OF SILT INFLOW -SOME DATA YEAR 2005 (AFTER PARECHU BREACH) YEAR 2006 KHAB POWARI NATHPA 01.07.05 7,214 - 25,416 05.07.05 4,171 9,186 10,456 11.07.05 - 9,597 8,822 13.07.05 4,643 10,800 9,085 21.07.05 2,143 4,119 5,747 27.07.05 1,357 3,995 4,647 30.07.05 2,500 4,989 5,210 GENERAL TREND

Slide 38: Changing Trend of Silt Inflow: 2006
CHANGING TREND OF SILT INFLOW -SOME DATA YEAR 2006 YEAR KHAB POWARI NATHPA 2006 SATLUJ SPITI TOTAL 31.7.06 14,686 3, 252 9,374 8,792 7,906 01.8.06 24,843 2,776 15,368 9,901 10,160 02.8.06 13,695 2,662 8,948 10,808 11,187 03.8.06 30,804 3,781 19,126 16,656 16,540 04.8.06 26,641 8,175 18,792 21,474 21

Slide 39: Silt Load: Petrographic Analysis
SILT LOAD IN RIVER SATLUJ- CONTD. PETROGRAPHIC ANALYSIS S.No. Constituent Hardness Operation stage Hardness On Mohr’s July - August ,04 May- July,05 Scale Shape Average % Average % 1. Quartz 7 Angular to Subangular 68.94 53.81 2. Feldspar 6 Prismatic 0.78 6.70 3 Muscovite 2.2 .5 Elongated Flaky 9.06

Slide 40: Projects Facing Regular Damage Due to Excessive Silt
PROJECT FACING REGULAR DAMAGE DUE TO EXCESSIVE SILT Project Capacity Head Speed Turbine Class (MW) (M) (RPM) Baira Siul 3 X 60 240 375 Francis A Maneri 3 X 30 180 428.6 Francis A Bhali I Chilla 4 X 36 32.5 187.5 Kaplan B Dehar 6 X 165 282 300 Francis B Giri 2 X 30 147.5 428.6 Francis B Lower 2 X 6.3

Slide 41: Projects Facing Regular Damage Due to Excessive Silt
PROJECT FACING REGULAR DAMAGE DUE TO EXCESSIVE SILT Project Capacity Head Speed Turbine Class (MW) (Mtrs.) (RPM) Chibro 4 X 60 110 250 Francis B Dhakrani 3 X11.25 19.8 187.5 Kaplan B Salal 6 X 115 102 Francis A Nathpa 6 X 250 493 300 Francis A Jhakhri

Slide 42: Measures for Silt Exclusion
2 ) m7 =) = O x< ff — m7 a O ra ”n Wu a =) a) < ui =

Slide 43: Measures for Silt Exclusion Adopted at Nathpa
MEASURES FOR SILT EXCLUSION ADOPTED AT NATHPA DESILTING ARRANGEMENT CHECKED FOR REMOVAL OF PARTICLE 0.2 MM AND ABOVE SILT LOAD AT INLET CHECKED : 5000 PPM FLOW THROUGH VELOCITY : 0. 3 M/SEC FLUSHING CONDUITS IN EACH CHAMBER - • 3 NOS. FOR COARSE, MEDIUM AND FINE SEDIMENT VELOCITY - 3 - 3.75 M/SEC SI

Slide 44: Measures for Silt Exclusion: Desilting Arrangement
MEASURES FOR SILT EXCLUSION ADOPTED AT NATHPA DESILTING ARRANGEMENT

Slide 45: Efficiency of Desilting Arrangement
MEASURES FOR SILT EXCLUSION ADOPTED AT NATHPA EFFICIENCY OF DESILTING ARRANGMENT HYDRAULIC MODEL STUDIES AT CWPRS SIZE OF PARTICLES SETTLING EFFICIENCY ON MODEL COARSE ( > 0.2 MM) 90% MEDIUM (0.075 TO 0.2 MM) 32% FINE (< 0.075MM) 22% OVERALL EFFICIENCY: ON MODEL 37% ON PROTOTYPE 40% CONDUITS CAN FLU

Slide 46: Reservoir Flushing
MEASURES FOR SILT EXCLUSION ADOPTED AT NATHPA RESERVOIR FLUSHING NECESSITY OF TO PREVENT SILTATION OF LIVE AND FLUSHING DEAD STORAGE OF RESERVOIR AND TO RESTRICT ENTRY OF SEDIMENTS INTO INTAKE PROVISION LOW LEVEL SPILLWAY WITH 5 RADIAL MADE GATES RIVER IS ALLOWED IN FREE FLOW CONDITIONS ONCE OR MORE

Slide 47: Silt Problem Experienced
SILT PROBLEM EXPERIENCED (PERFORMANCE OF GENERATING UNITS UNDER HIGH SILT LOAD) FIRST YEAR OF OPERATION UPPER LIMIT FOR POWER GENERATION - 5000 PPM ALL RUNNER (EXCEPT 2, WITH PLASMA NITRIDING) AND ALL OTHER UNDER WATER PARTS WERE UNCOATED HEAVY DAMAGE AT THE END OF MONSOON SEASON TO ALL RUNNER

Slide 48: Silt Problem Experienced: Silt Passing Through Units
SILT PROBLEM EXPERIENCED - CONTD. (PERFORMANCE OF GENERATING UNITS UNDER HIGH SILT LOAD) SILT PASSING THROUGH UNITS AVERAGE PPM IN A AVERAGE SILT LOAD IN MONTH A MONTH AS PER DATA SUPPLIED (JUN- AUG) (JUN-AUG) TO MANUFACTURER 932 2.13 MT IN ACTUAL OPERATION 838 1.92 MT YR 2004 YR 2005 2035 4.65 MT Q

Slide 49: Damages to Under Water Parts
” a < oO ~ ui < S ~ Wi fa) 2 5 O ) AMAGE

Slide 50: Silt Problem Experienced: Runner Erosion
SILT PROBLEM EXPERIENCED - CONTD. UNIT NO. 6 EROSION AFTER 1492 HOURS OF OPERATION, SILT LOAD PASSED THROUGH RUNNER 6.1 LAC TONS

Slide 51: Silt Problem Experienced: Erosion After 2 Hours
SILT PROBLEM EXPERIENCED-CONTD. UNIT NO. 6 EROSION AFTER 1692 HOURS OF OPERATION, SILT LOAD PASSED THROUGH TURBINE 8.1 LAC TONS

Slide 52: Damages by Silt: New Runner
DAMAGES BY SILT- EXPERIENCED AT NJPS NEW RUNNER

Slide 53: Damages by Silt: Cracked and Eroded Runner
DAMAGES BY SILT- EXPERIENCED AT NJPS RUNNER WITH CRACKED ERODED RUNNER 2005 VANES AT OUTLET 2004

Slide 54: Damages by Silt: Uncoated Repaired Runners
DAMAGES BY SILT- EXPERIENCED AT NJPS UNCOATED REPAIRED RUNNERS 2005

Slide 55: Damages by Silt: Soft Coated Runner
DAMAGES BY SILT- EXPERIENCED AT NJPS Eroded soft coated Soft Coated Runner runner after high silt 2005 season

Slide 56: Damages by Silt: Hard Coated Guide Vane
DAMAGES BY SILT- EXPERIENCED AT NJPS Hard coated Guide Vane

Slide 57: Damages by Silt: Coated Guide Apparatus
DAMAGES BY SILT- EXPERIENCED AT NJPS Coated Guide apparatus after Coated Guide apparatus erosion Nov. 2005 (Guide (new) being assembled at Vane, Cheek Plate & Wear site Oct.2006 (Guide Vane, Ring) Cheek Plate & Wear Ring)

Slide 58: Damages by Silt: Coated Guide Vane
DAMAGES BY SILT- EXPERIENCED AT NJPS Coated guide vane after Coated guide vane after erosion erosion

Slide 59: Damages by Silt: Cheek Plate and Turbine Cover Sleeve
DAMAGES BY SILT- EXPERIENCED AT NJPS Cheek plate GV Bush & Cheek plate GV Bush & Turbine cover sleeve Turbine cover sleeve after erosion Dec. 2005 (new) being assembled at site Oct. 2006

Slide 60: Damages by Silt: Upper Labyrinth Seals
DAMAGES BY SILT- EXPERIENCED AT NJPS New Uncoated upper New Hard Coated Upper labyrinth seals Oct. 2005 Labyrinth Seal Oct. 2006

Slide 61: Damages by Silt: Upper Labyrinth Seal Erosion
DAMAGES BY SILT- EXPERIENCED AT NJPS Uncoated Upper Labyrinth seal after erosion Nov. 2005 Hard Coated Upper Labyrinth Uncoated Upper Labyrinth seal seal after erosion Oct. 2006 after erosion Nov. 2005

Slide 62: Damages by Silt: Guide Vane Bushes
DAMAGES BY SILT- EXPERIENCED AT NJPS New Guide vane Bushes Eroded Guide Vane Bushes (Lower) (Lower)

Slide 63: Damages by Silt: Cheek Plates
DAMAGES BY SILT- EXPERIENCED AT NJPS New coated cheek plate Uncoated cheek plate after Oct. 2006 erosion Dec. 2005

Slide 64: Damages by Silt: Lower Labyrinth Seal
DAMAGES BY SILT- EXPERIENCED AT NJPS Coated lower labyrinth Coated lower labyrinth seal after erosion Oct. seal after erosion Dec. 2006 2005

Slide 65: Silt Problem Experienced: Running Few Units with High Silt Load
SILT PROBLEM EXPERIENCED-CONTD. (EXPERIENCED OF RUNNING A FEW UNITS WITH HIGH SILT LOAD) • DURING HIGH FLOOD SEASON OF 2005 HIGH SILT CONCENTRATION IN RIVER PERSISTED FOR LONG TIME • WHEN SILT LOAD IN RIVER WAS 7000 PPM . 1 OR 2 UNITS WERE RUN WITH 4 CHAMBERS TO ACHIEVE HIGHER SETTLING EFFICIENCY OF

Slide 66: Parameters for Limits for Safe Running of Power Plant
PARAMETERS FOR THE LIMITS FOR SAFE RUNNING OF POWER PLANT • ORIGINALLY AN UPPER LIMIT OF 5000 PPM AT INTAKE WAS ADOPTED FOR DESIGN OF DESILTING CHAMBERS • KEEPING IN VIEW THE SILT DAMAGE AND THE PERFORMANCE OF UNITS THE FOLLOWING LIMITS HAVE NOW BEEN PROPOSED/ DECIDED i. AN UPPER LIMIT OF 2000 PPM I

Slide 67: Parameters for Limits for Safe Running of Power Plant (contd.)
PARAMETERS FOR THE LIMITS FOR SAFE RUNNING OF POWER PLANT- CONTD. • THE LIMIT FOR TOTAL SILT LOAD PASSING THROUGH A COATED RUNNER HAS BEEN FIXED AT 7 LAC. TONNES, WHICH WOULD BE REVIEWED AFTER ONE YEAR OF ACTUAL PERFORMANCE. (THIS LIMIT FOR UNCOATED RUNNER WAS 4 LAC. TONNES.) PARENT MATERIAL USED

Slide 68: Benefits of Providing HVOF Coating
BENEFITS OF PROVIDING HVOF COATING • MAJOR IMPROVEMENT IN CONTROLLING WEAR OF UNDER WATER TURBINE PARTS ACHIEVED BY PROVIDING HVOF COATING. • DURING 2005-2006 SEASON 7.5-8.0 LAC MT OF SILT HAS SAFELY PASSED THROUGH TURBINES WITH 300 MICRONS HVOF COATING INSTEAD OF ABOUT 3.5 LAC MT FOR UNCOATED PARTS

Slide 69: Additional Measures for Silt Control Under Consideration
ADDITIONAL MEASURES FOR SILT CONTROL – UNDER CONSIDERATION • DUE TO HEAVY SILT LOAD IN RIVER SATLUJ AFTER PARECHU LAKE BREACH ON 26.06.2005, SJVNL IS CONSTANTLY EXPERIMENTING AND EXPLORING ADDITIONAL MEASURES FOR SILT MANAGEMENT ON SHORT MEDIUM AND LONG TERM BASIS • OPINION OF MANY EXPERTS HAVE BEEN

Slide 70: Committee of Experts on Silt Management
COMMITTEE OF EXPERTS ON SILT MANAGEMENT • CONSTITUTED BY SJVNL (AS PER THE DECISION TAKEN DURING THE MEETING HELD WITH SECRETARY (POWER), GOI ON JULY 15, 2005 MEMBERS • DR. P R RAO, RETD. CHIEF ENGINEER (CWC) • PROF. R.J. GARDE, RETD. PROFESSOR CIVIL ENGINEER (IIT, ROORKEE) • DR M S REDDY, EX-SECY,

Slide 71: Committee of Experts: Recommendations for Silt Control
COMMITTEE OF EXPERTS ON SILT MANAGEMENT IMPORTANT RECOMMENDATIONS FOR SILT CONTROL SHORT TERM – EXPERIMENT WITH RESERVOIR OPERATION- OPTIMISATION OF GATE OPERATION ADVISED BY STUDY ON MODEL AND PROTOTYPE. MEDIUM TERM – BLANK PANEL- PROVISION OF BLANK PANEL OF HEIGHT 3.2M BY WELDING STEEL PLATE TO BO

Slide 72: Multi-Disciplinary Task Force (MDTF)
MULTI-DISCIPLINARY TASK FORCE (MDTF) ON PROBLEMS OF SILT EROISION & REMEDIAL MEASURES FOR NATHPA JHAKRI POWER STATION • CONSTITUTED BY MINISTRY OF POWER ( VIDE O/O NO. 13/31/2002-H-II DATED 5.11.2004) CHAIRMAN -- MEMBER (HYDRO), CEA MEMBERS 1. CHIEF ENGINEER (CENTRAL WATER COMMISSION) 2. EXECUTIVE D

Slide 73: Remedial Measures Suggested by MDTF: Short Term
REMEDIAL MEASURES SUGGESTED BY MDTF FOR NJHEP SHORT TERM 1. HARD COATING ON UNDERWATER PARTS . 2. MODIFICATION IN PROFILE OF RUNNER AT INLET 3. MAINTAINING ADEQUATE INVENTORY OF TURBINE COMPONENTS PRONE TO EROSION. 4. DEVELOPMENT OF NEW SILT EROSION RESISTANT MATRIALS. 5. RESERVOIR FLUSING IN VERY H

Slide 74: Remedial Measures Suggested by MDTF: Long Term
REMEDIAL MEASURES SUGGESTED BY MDTF FOR NJHEP LONG TERM a) PROCUREMENT OF COATED SPARES RUNNERS WITH LATEST COATING (SXH 70) WITH EROSION GUARANTEES FROM THE SUPPLIER. b) RAISING OF DAM HEIGHT. c) TO CARRY OUT HYDAULIC MODEL STUDY TO ASERTAIN THE IMPROVEMENT IN PROFOMANCE BY PROVIDING A NEW DIVERSIO

Slide 75: Joint Recommendations of CEA, BBMB & SJVN
ADDITIONAL MEASURES FOR SILT CONTROL – CONTD. UNDER CONSIDERATION OPINION OF EXPERTS JOINT RECOMMENDATIONS OF CEA, BBMB & SJVN THE PROBLEM HAS BEEN DELIBRATED JOINTLY BY SJVNL, BBMB AND CEA AND PROPOSAL PUT UP TO MOP i.e. 1) DEFINING UPPER LIMITS OF SILT FOR POWER GENERATION 2) WEEKLY FLUSHING OF RE

Slide 76: Opinion of World Bank Expert
ADDITIONAL MEASURES FOR SILT CONTROL – CONTD. UNDER CONSIDERATION OPINION OF WORLD BANK EXPERT MR. DENIEL J. GUNARATNAM VISITED NJHEP AND SUBMITTED A REPORT DATED 2.01.2006 RECOMMENDATIONS ARE AS FOLLOW :- 1) THE WEAR VULNERABLE PARTS BE COATED WITH WEAR RESISTANT COATINGS 2) CATCHEMENT AREA TREATME

Slide 77: Forum of Hydro Power Producers of Satluj Basin
ADDITIONAL MEASURES FOR SILT CONTROL – CONTD. UNDER CONSIDERATION FORUM OF HYDRO POWER PRODUCERS OF SATLUJ BASIN • INITIATED BY SJVNL MEMBER ORGANISATION 1. NATIONAL THERMAL POWER CORPORATION 2. BHAKRA BEAS MANAGEMENT BOARD 3. HIMACHAL PRADESH STATE ELECTRICITY BOARD 4. JAIPRAKASH HYDRO POWER LTD. 5

Slide 78: Forum of Hydro Power Producers: Objectives
ADDITIONAL MEASURES FOR SILT CONTROL – CONTD. UNDER CONSIDERATION FORUM OF HYDRO POWER PRODUCERS OF SATLUJ BASIN OBJECTIVES : 1. ENVIRONMENT - TO EVOLVE INTEGRATED CATCHMENT AREA TREATMENT PLAN 2. OPERATION OF POWER STATIONS & SHARING OF TECHNICAL EXPERTISE AND EXPERIENCE. 3. DATA SHARING – SHARE FA

Slide 79: Experiments with Reservoir Operation
ADDITIONAL MEASURES FOR SILT CONTROL UNDER CONSIDERATION – CONTD. (EXPERIMENTS WITH RESERVOIR OPERATION) OBJECTIVES IS TO MINIMIZE SILT ENTRY INTO INTAKES AND ALSO MINIMIZE THE NO. OF RESERVOIR FLUSHING OPERATION BY SUITABLE GATE OPERATION THE FOLLOWING IS ADOPTED i. WHEN INFLOW IS MARGINALLY IN EXC

Slide 80: Experiments with Reservoir Operation (contd.)
ADDITIONAL MEASURES FOR SILT CONTROL UNDER CONSIDERATION – CONTD. (EXPERIMENTS WITH RESERVOIR OPERATION) • ANOTHER ALTERNATIVE TO OPERATE GATES FURTHEST FROM INTAKE VIZ-A-VIZ (i ) ABOVE SHALL ALSO BE STUDIED THE FINAL SELECTION WOULD BE TRADE OFF BETWEEN THE SILT DRAWN INTO INTAKE AND NO. OF RESERVO

Slide 81: New Diversion Tunnel at Nathpa
ADDITIONAL MEASURES FOR SILT CONTROL UNDER CONSIDERATION – CONTD. (NEW DIVERSION TUNNEL AT NATHPA) • SJVNL PLANS TO CONSTRUCT A DIVERSION TUNNEL FROM 750 M U/S OF NATHPA DAM AXIS TO D/S OF DAM • OBJECTIVES IS TO DIVERT EXCESS WATER UPTO 1000 CUMECS, WITHOUT OPERATING SLUICE GATES, SO THAT TRANQUIL C

Slide 82: Storage Dam on River Satluj and Spiti
ADDITIONAL MEASURES FOR SILT CONTROL UNDER CONSIDERATION – CONTD. (STORAGE DAM ON RIVER SATLUJ AND SPITI) STORAGE DAM PROPOSED i.AT KHAB (2 KM D/S OF CONFLUENCE OF SATLUJ AND SPITI) ii.AT RIBBA DOWNSTREAM OF JANGI ON SATLUJ iii.TWO STORAGE DAMS ON SPITI NEAR ‘RANGRIK’ AND ‘POOH’ VILLAGES KHAB DAM (P

Slide 83: Catchment Area Treatment
ADDITIONAL MEASURES FOR SILT CONTROL UNDER CONSIDERATION – CONTD. (CATCHMENT AREA TREATMENT) CATCHMENT AREA TREATMENT INCLUDING VEGITATION COVER AND SOIL CONSERVATION WHICH IS ALSO OTHERWISE NEEDED FOR SUSTAINABLE DEVELOPMENT OF REGION, WOULD GREATELY RESULT IN REDUCTION OF SILT LOAD SJVNL’S FIR

Slide 84: Conclusion
HGniaiids qangdii tet Wananga ‘diinigai qnnagaa aiinigi Wananga qaungaiin Wnnangga senna: Wananga sinnaiis 2 o 7 =) —_l ) ra O O

Slide 85: Conclusion
CONCLUSION i. AS MOST HIMALAYAN RIVERS, LIKE SATLUJ CARRYING HEAVY SILT LOAD, THIS PROBLEM HAS TO BE ADDRESSED MOST EFFECTIVELY IN DESIGN STAGE OF ALL FUTURE PROJECTS ii. HVOF COATING OF UNDER WATER PARTS HAVE GIVEN GOOD RESULTS AT NJHEP AND COULD BE TRIED ON OTHER PROJECTS WITH SIMILAR PROBLEMS iii