Aic Mines Limited · ASX:A1M
Aic Mines — Investor Presentation (November 2020)
14 slides from Aic Mines's investor presentation, Nov 9, 2020
Slide 1: Investor Presentation November 2020
For personal use only Investor Presentation November 2020
Slide 2: Important Information
Important Information For personal use only This presentation has been prepared by AIC Mines Limited (“the Company” or “AIC Mines”) to provide summary information about AIC Mines and its activities at the date of this presentation. The information contained in this presentation does not purport to b
Slide 3: Company Overview
Company Overview For personal use only An experienced management team focused on building a new Australian mid-tier gold and copper miner through exploration, development and acquisition ASX Code A1M Board of Directors Share Price 1 46c Josef El-Raghy Chairman Shares on Issue 68.7M Aaron Colleran Ma
Slide 4: Current Projects: Exploring for Gold and Copper in WA
Current Projects Exploring for Gold and Copper in WA For personal use only Lamil Joint Venture • 1,280km2 tenement package located 30km west of the world-class Telfer Gold-Copper Mine • Displays all the ingredients required to host a Telfer-style deposit • RC and diamond drilling commenced in Septem
Slide 5: Lamil Project, Paterson Province WA
Lamil Project Paterson Province WA For personal use only • The Paterson Province is one of the most highly endowed yet under-explored regions in Australia • Recent discoveries at Winu and Havieron are testament to the potential of the region • The main Lamil Dome target exhibits the key structural f
Slide 6: Lamil Project: Prominent Regional Hinge Zone
Lamil Project Prominent Regional Hinge Zone For personal use only • The project area occupies a prominent regional ‘hinge zone’ which is clearly defined by a significant flexure in major belt-parallel structures • AIC geophysical interpretation shows a regional scale NE-SW trending structure is trac
Slide 7: Lamil Project: Drilling Commenced September 2020
Lamil Project Drilling Commenced September 2020 For personal use only • The region remains under- explored due to its relatively deep cover • A recent breakthrough based on detailed geophysics indicates that the depth of cover over the main targets at Lamil is <100m1 • Cover was previously thought t
Slide 8: Lamil Project: Forward Work Program
Lamil Project Forward Work Program For personal use only • Phase 1 drilling program to continue through to mid- December • Results from the Phase 1 drilling program will start being received from late November and will guide additional drilling • Phase 2 drilling program to extend and infill the Pha
Slide 9: Marymia Project: Prospective for Gold and Copper
Marymia Project Prospective for Gold and Copper For personal use only Significant Copper Prospects • Surface geochem has identified a significant copper anomaly at the Curara Well JV1. The target occurs at the base of the Naracoota Formation and in close proximity to the Jenkins Fault – a similar se
Slide 10: Marymia Project: 3,600km2 tenement package
Marymia Project 3,600km2 tenement package For personal use only • Current evaluation is designed to map structural complexity under cover and target deep controlling structures • Numerous targets with elements consistent with the known major deposits in the region (i.e. Plutonic, Marymia and DeGruss
Slide 11: Marymia Project: Forward Work Program
Marymia Project Forward Work Program For personal use only • Drill testing Curara Well copper target • Heritage Survey clearance has been received • Commencement dependent on rig availability • Downhole EM testing at Doolgunna • DHEM planned on 4 holes confirmed to be within DeGrussa ‘mine sequence’
Slide 12: Growth Strategy: A Disciplined Acquisition Strategy
Growth Strategy A Disciplined Acquisition Strategy For personal use only Build a portfolio of mines through exploration, development and acquisition • Our strategy is to target late-stage Australian gold and copper projects where we can add value through exploration and development • Numerous opport
Slide 13: Investment Thesis
Investment Thesis For personal use only • Highly credentialed team • Well capitalised • Committed to high impact exploration • Inaugural drilling program underway at Lamil Project • Marymia Project strategically located within trucking distance of the Plutonic Gold Mine and the DeGrussa Copper Mine
Slide 14: Commencement of RC drilling at the Lamil Project September 2020
Commencement of RC drilling at the Lamil Project 21 September 2020 For personal use only www.aicmines.com.au ABN: 11 060 156 452 P: +61 (8) 6269 0110 E: info@aicmines.com.au A: A8, 435 Roberts Rd, Subiaco, WA, 6008 14