AURELIA METALS Mining The Metals That Matter Noosa Mining Conference 23 July 2026 ASX: AMI
Slide 2: Forward Looking Statements
FORWARD LOOKING STATEMENTS This presentation has been prepared by Aurelia Metals Limited (‘AMI’ or the ‘Company’). It should not By its very nature, production and exploration for gold and base metals is a high risk business and is not be considered as an offer or invitation to subscribe for or purc
Slide 3: Our Investment Position
OUR INVESTMENT POSITION Exposure to the right metals Strong balance sheet $143.9M cash at 30 June 2026 and no drawn debt1 Self funded production growth pipeline 3 growth developments Federation - Great Cobar - Peak Plant Optimisation Significant exploration prospectivity Identified productivity impr
Slide 4: A Platform Built for Long-Term Growth & Value
A PLATFORM BUILT FOR LONG-TERM GROWTH & VALUE Current Operations Growth Peak Processing Plant Peak Processing New Occidental Plant Expansion Hera Processing Great Cobar Plant Restart Option Peak South Mine New Cobar Mine Nymagee Exploration Federation Mine 1,900KM2 OF PROSPECTIVE EXPLORATION TENEMEN
Slide 5: FY26 Production and Costs
FY26 PRODUCTION AND COSTS Gold production above revised higher guidance, all other metrics in line SepQ DecQ MarQ JunQ YTD FY26 Gold Production (koz) Copper Production (kt) Measure Unit Revised FY26 FY26 FY26 FY26 FY26 Guidance 51% 80% koz 10.4 11.7 13.0 15.3 50.4 45 – 50 Q1 to Q4 Q1 to Q4 Gold prod
Slide 6: Peak
PEAK Plant operating at record annualised throughput with recoveries maintained Mine development metres providing Maximising tonnes processed (kt) through the production flexibility Peak plant 1,547 1,528 221 1,379 1,359 191 197 187 1,041 175 888 151 Mar 25 Jun 25 Sep 25 Dec 25 Mar 26 Jun 26 Mar 25
Slide 7: Plant Upgrades
PLANT UPGRADES Delivering 1.1 – 1.2Mtpa throughput capacity Tailings and Process Water Management • Improves copper and zinc recovery, reduces cyanide consumption New 22m tailings thickener now in operation at Peak (June 2026) • Thickener commissioned and commenced operation in June 2026 Concrete po
Slide 8: Federation
FEDERATION Mined tonnes and grade performing strongly Operating development supporting higher Ore mined (kt) ahead of plan for FY26 tonnages 108 112 1,481 1,417 1,449 1,336 76 1,134 63 877 53 34 Mar 25 Jun 25 Sep 25 Dec 25 Mar 26 Jun 26 Mar 25 Jun 25 Sep 25 Dec 25 Mar 26 Jun 26 Qtr Qtr Qtr Qtr Qtr Q
Slide 9: Federation Exploration
FEDERATION EXPLORATION Successful first underground exploration program completed at Federation1 • Extended the high-grade Federation West mineralisation down-dip by ~70m • Discovered the Harley Lens, a new polymetallic lens further northwest • Intersected high-grade mineralisation within 1.8m of cu
Slide 10: Great Cobar Copper Project
GREAT COBAR COPPER PROJECT Development executing in line with budget and schedule Q4 H1 H2 H1 H2 FY26 FY27 FY27 FY28 FY28 Mine development of 438m completed Mine development in quarter Ventilation works Mine development of 1,823m Shaft raise bore completed to date Amenities improvement Ventilation u
Slide 11: Great Cobar Copper
GREAT COBAR COPPER Investment case materially higher at current prices • Mineral Resource 11Mt at 2.0% Cu and 0.5g/t Au1 • Development from existing mine workings at New Cobar • Capital investment of $92M to unlock initial 8 year mine life • Production forecast to commence in ~2 years • Significant
Slide 12: Exploration Potential
EXPLORATION POTENTIAL Significant discovery potential in a premier Australian mining region • Tenements covering 105km of the highly prospective Rookery Fault • Extensive data coverage including: • magnetics (100%) • gravity (80%) • surface geochemistry (80%) • targeted induced polarisation and elec
Slide 13: New Occidental Tailings Project
NEW OCCIDENTAL TAILINGS PROJECT Incremental low capital cost gold production – 32koz Au Historical Gold-Bearing Stockpiles • Pre-Feasibility Study and Maiden MROR released 16 June1 • Mineral Resource estimate of 2.6Mt @ 0.65g/t Au2 • To be processed through the Peak processing plant in addition to f
Slide 14: Strengthened Balance Sheet
STRENTHENED BALANCE SHEET Substantial free cash flow generated and refinance completed in the June 2026 quarter Group Cash A$M1 40.0 183.9 Record quarterly cash flow from Cobar operations 53.1 36.2 143.9 (6.2) (14.7) (2.1) Precious metal sales represented 55% of (13.4) total revenue (3.8) 94.7 New l
Slide 15: Our Community, Our Future
OUR COMMUNITY OUR FUTURE NOOSA MINING CONFERENCE | 23 JULY 2026 | PAGE 15
Slide 16: Positioned to Deliver Production Growth
POSITIONED TO DELIVER PRODUCTION GROWTH Safely prioritising the highest value production and cash flow outcomes ✓ Strong balance sheet: $144M net cash1, $184M liquidity1 ✓ Federation mine built and ramping up volumes ✓ Peak processing plant full, with throughput expansion underway Significant ROM st
Slide 17: Contact
CONTACT T: +61 7 3180 5000 E: office@aureliametals.com.au Level 10, 10 Felix Street BRISBANE QLD 4000 GPO Box 7 BRISBANE QLD 4001 aureliametals.com
Slide 18: Appendix 1: Great Cobar Mineral Resources Estimates
APPENDIX 1 | GREAT COBAR MINERAL RESOURCES ESTIMATES Great Cobar Copper MRE reported by classification as at 30 June 2025 Tonnes Cu Au Zn Pb Ag Class (kt) (%) (g/t) (%) (%) (g/t) Indicated 5,900 2.1 0.6 0.1 0.0 6 Inferred 4,900 1.9 0.4 0.2 0.1 6 Great Cobar Copper Total 11,000 2.0 0.5 0.1 0.0 6 Note
Slide 19: Appendix 2: New Occidental Mineral Resources Estimate
APPENDIX 2 | NEW OCCIDENTAL MINERAL RESOURCES ESTIMATE New Occidental MRE reported by classification as at 30 April 2026 Tonnes Au Class (kt) (g/t) Indicated 2,300 0.66 Inferred 300 0.63 Total 2,600 0.65 Note: Values are reported to two significant figures which may result in rounding discrepancies