American Electric Power Company, Inc. · NASDAQ:AEP

American Electric Power — 2009 AEP Renewable Energy RFP Pre-Bid Webinar (SPP Interconnected Projects)

31 slides from American Electric Power's conference presentation, Jun 18, 2009

  1. Slide 1: 2009 AEP Renewable Energy RFP Bidder's Presentation

    2009 AEP Renewable Energy RFP Bidder’s Presentation Pre-Bid Webinar SPP Interconnected Projects Thursday June 18, 2009 1:00 p.m. EPT Webinar Registration info: https://www2.gotomeeting.com/register/704286290

  2. Slide 2: Webinar Agenda

    Webinar Agenda z Introduction to AEP z RFP Overview z Evaluation Process z Regulatory Overview z RFP Communication 2

  3. Slide 3: Introduction to AEP

    (TE AMERICAN ELECTRIC POWER Introduction to AEP

  4. Slide 4: American Electric Power (AEP)

    American Electric Power (AEP) • American Electric Power (NYSE: AEP) • Founded in 1906 • Employees: 22,000 • 7 operating units in 11 states • TX, OK, LA, AR, OH, IN, MI, VA, WV, KY & TN • 38,000 MW of generating capacity • Includes: Coal, natural gas, nuclear, hydro and wind • Largest owner of transm

  5. Slide 5: AEP Utility Subsidiary Credit Ratings

    AEP Utility Subsidiary Credit Ratings Company Senior Unsecured Moody's S&P Fitch Appalachian Power Company Baa2 BBB BBB+ Columbus Southern Power Company A3 BBB A- Indiana Michigan Power Company Baa2 BBB BBB Kentucky Power Company Baa2 BBB BBB Ohio Power Company A3 BBB BBB+ Public Service Company of

  6. Slide 6: AEP Service Territory

    AEP Service Territory 213,000 miles of Distribution #1 39,000 miles of Transmission #1 38,400 MW of Generating Capacity #2 5.2 million customers in 11 states 6

  7. Slide 7: AEP Renewable Footprint

    AEP Renewable Footprint New 10 MW Solar PPA with juwi Solar Inc. Renewables Portfolio* Wind Regulated 1296 MW Non-regulated 489 MW Hydro Run-of-river 364 MW Solar Regulated 10 MW * Includes owned assets and long-term 7 purchased energy contracts

  8. Slide 8: Recent Successes

    Recent Successes 2007 AEP Corporate Sustainability Report Babcock & Brown 1000 MW Goal 2007 2008 BP Alternative Energy 2 RFPS 4 RFPs Edison Mission 2 OPCOs 5 OPCOs Horizon Wind Energy Executed 275 MW Executed 628.4 MW Invenergy 2009 AEP Corporate Sustainability NextEra Energy Resources Report increa

  9. Slide 9: New This Year

    (TE AMERICAN ELECTRIC POWER New This Year

  10. Slide 10: New/Revised RFP Concepts

    New/Revised RFP Concepts z Right of First Offer (ROFO) z Multiple Year Proposal Due date (2009 , 2010, 2011 Projects) z Minimum Size Requirements z Term Sheet submission for non-intermittent renewable projects z Weighting of Price vs Non-price factors z One electronic copy of the entire proposal in

  11. Slide 11: RFP Overview

    (TE AMERICAN ELECTRIC POWER RFP Overview 11

  12. Slide 12: RFP Overview

    RFP Overview z Seeking up to 1,100 MW of cost effective renewable energy from projects capable of being on-line in 2009, 2010 or 2011 • Renewable Energy Project: Wind Power, Low-impact Hydro, Geothermal, Biomass Energy, Biologically-derived Methane • No AEP self-build / affiliate bidding into this R

  13. Slide 13: RFP Website Structure/Access

    RFP Website Structure/Access z Website Structure • Utilizing a particular AEP subsidiary website to access the Q&A section or the Form REPA does not mean that you are bidding a project to that specific subsidiary z Questions and Answers • Everyone will have access to the Q&A section of the RFP websi

  14. Slide 14: SPP Transmission Queue

    SPP Transmission Queue (RFP Section 2.2.5; Section 5.5 ) z SPP Interconnection point may be in any state within the SPP operating territory (preference to AEP transmission) z Submitted RFP bids must include: • SPP queue number and copies of any relevant SPP Interconnection Studies and third party lo

  15. Slide 15: SPP Transmission Queue

    SPP Transmission Queue (RFP Section 5.5.2.2 ) z Short-listed SPP Projects may be: • Screened for cost to deliver product to AEP West load • Submitted to the SPP Aggregate System Impact Study for evaluation of obtaining Network Service • Costs associated with analysis for delivering product to AEP We

  16. Slide 16: RFP Timeline

    RFP Timeline (RFP Section 3.1 ) Project On-line Year 2009 2010 2011 (by 12/31/2009) (by 12/31/2010) (by 12/31/2011) RFP Issued 6/1/2009 Bidder's Conference (PJM) 6/16/2009 Bidder's Conference (SPP) N/A 6/18/2009 Expression of Interest Form 6/9/2009 8/10/2009 12/22/2009 Confidentiality Form 6/16/2009

  17. Slide 17: Minimum Project Size

    Minimum Project Size (RFP Section 2.2.2 ) z 5 MW minimum: • Landfill gas • Hydroelectric (low impact) • Biologically derived methane gas z 20 MW minimum: • Wind energy • Biomass Energy • Geothermal All awarded agreements presume a 20-year term 17

  18. Slide 18: Bid Proposal Forms

    Bid Proposal Forms z Submission of the following is required: • Appendix A – Expression of Interest Form • Appendix B (1-3) – Bid Summary • Appendix C (1-2) – Bid Price Sheet (PJM/SPP) • Appendix C-3 – Energy Input Sheet • Appendix D – Mutual Confidentiality Agreement • Appendix E – Bidder’s Credit-

  19. Slide 19: REPA Exceptions/Term Sheet

    REPA Exceptions/Term Sheet (RFP Section 6.6) z REPA • Technology: Wind, Hydro • Exceptions to REPA, with explanations, must be submitted as a separate document with Proposals • Redline versions of REPA will NOT be accepted as compliance with terms of RFP z Term Sheet • Technology: Biomass, Landfill

  20. Slide 20: Bundled All-in Bid Price

    Bundled All-in Bid Price (RFP Section 2.2.4; Appendix C-2) 2010/2011 Production Year Bid Price Period Bid Price Details Premium-Peak $/MWh (120% of Peak) Weekdays: Jan/Feb/Jul/Aug/Dec Peak $ "Bid" / MWh Weekdays: Mar/Apr/May/Jun/Sep/Oct/Nov Off-Peak $42.00 / MWh Nights, Weekends & NERC Holidays: Jan

  21. Slide 21: Energy Forecast

    Energy Forecast (RFP Section 6.7.2; Appendix C-3) All proposals must provide an 8760 hourly production profile for a typical calendar year Explain information source assumption for wake losses, line losses, etc., and the location where the data was measured All Hour Ending “HE” times will be in CPT

  22. Slide 22: Right of First Offer (ROFO)

    Right of First Offer (ROFO) (RFP Section 6.6.3) z In the event that the developer decides to sell the facility or interest in the facility, the Purchaser would be interested in the right of first offer 22

  23. Slide 23: Evaluation Process

    cr AMERICAN ELECTRIC POWER Evaluation Process 23

  24. Slide 24: Bidder Eligibility Requirements

    Bidder Eligibility Requirements z Minimum Bid Eligibility Requirements (Section 6) • All required material included per Section 7 • Acceptable level of development, credit and technology risk • Demonstrated previous experience in comparable completed renewable energy project(s) in U.S. z Proposal Co

  25. Slide 25: Evaluation and Selection

    Evaluation and Selection (RFP Section 8) z Bid Evaluation and Selection Requirements • Quantitative Factors (Price Factors) 80% include but are not limited to – • SPP Locational Imbalance Price (LIP) at delivery point (current and expected) • Imputed REC cost • Associated capacity value • Qualitativ

  26. Slide 26: Regulatory Overview

    (TE AMERICAN ELECTRIC POWER Regulatory Overview 26

  27. Slide 27: Regulatory Approval

    Regulatory Approval (RFP Section 10) z The REPA shall be dependent upon AEPSC obtaining sufficient assurance that the costs of power and energy purchased pursuant to the REPA will be recognized for recovery in the rates charged to its jurisdictional customers. The determination of what constitutes “

  28. Slide 28: RFP Communication

    cr AMERICAN ELECTRIC POWER RFP Communication 28

  29. Slide 29: RFP Communication

    RFP Communication z RFP Manager Peggy Simmons 155 West Nationwide Blvd Columbus OH 43215 614-583-6009 pisimmons@aep.com 29

  30. Slide 30: Successful Proposal Checklist

    Successful Proposal Checklist z Proposal Organization Checklist: (1 original, 1 electronic copy, 1 CD) • Transmittal letter • Legal Proceedings (if any) • Bidder’s Information • Type & Terms of Offer • Experience & References • Exceptions to REPA • Executive Summary • Facility Information • Financia

  31. Slide 31: Thank you for your attention

    Thank you for your attention Solar Wind Biomass Geothermal Hydro 31

American Electric Power Company — 2009 AEP Renewable Energy RFP Pre-Bid Webinar (SPP Interconnected Projects) on 6ix