Slide 1: Company Presentation December 2012
DECEMBER Page |1 2012 C O M P Awww.alterrapower.ca NY PRESENTATION TSX : AXY
Slide 2: Forward-Looking Information
Forward-Looking Information This presentation contains certain “forward-looking information” within the meaning of Canadian securities laws, which may include, but is not limited to, statements with respect to future events or future performance, management’s expectations regarding Alterra’s product
Slide 3: Alterra Power
Alterra Power Alterra’s mission: to be a leading global renewable energy company through… Continued excellence in production and safety as premier asset operator / manager Successful origination and development of new utility-scale projects Opportunistic acquisitions of other renewable power p
Slide 4: Alterra: Recent Growth and Performance
Alterra: Recent Growth and Performance Decrease reflects: Alterra’s recent growth ... •• partial sell-down of HS Orka interest Performance through 3Q 2012: lower aluminum prices (net interest) • weakening of the Icelandic Kronar (net interest) $68.5 million revenue CAPACITY (end of year) PRODUCTIO
Slide 5: Alterra: Planned Internal Growth
Alterra: Planned Internal Growth Current plan would almost double EBITDA by 2015 Current Assets Operating by 2015 Growth Managed 567 MW 927 MW +64% AXY Owned 298 MW 494 MW +66% AXY Share of 1,380 GWh 2,200 GWh +59% Production AXY Revenue $110 MM $180 MM +63% AXY EBITDA $55 MM $105 MM +91% Projects D
Slide 6: Assets and Pipeline
Assets and Pipeline Globally diversified across technology types and renewable power markets Wind and hydro: primarily concentrated in North America Geothermal: located in overlap of resource and strong markets / power demand Power Plant Capacity Technology Operating (2012) Gross AXY Share Reykj
Slide 7: Outstanding Track Record as Developer / Builder
Outstanding Track Record as Developer / Builder Successful developer track record across renewable technologies Proven ability to develop and deliver large assets at greenfield locations Development teams from all these projects remain substantially intact Recent project successes Wind Dokie 144
Slide 8: Upper Toba: Update
Upper Toba: Update Current Status Pre-construction activities begun on site Prospective EPC contractor reviewing and optimizing design Forthcoming clarification on partnership arrangements Equity capital need of ~$40MM for 51% interest Potential sources: Financing at holdco (non-parent) le
Slide 9: Geothermal Development: The Right Approach
Geothermal Development: The Right Approach Early mover: moving into promising power markets with strong geothermal potential Strong development skills: resource assessment, community relations and project de-risking Utilize value-add partners: sharing capital outlays and further de-risking projects
Slide 10: BC Opportunity
BC Opportunity British Columbia’s demand for power is expected to grow significantly in the next 3-5 years LNG plants in Kitimat Mining growth General population growth Clean renewable power sourced from IPPs is expected to be a critical source of new supply Alterra is uniquely positioned to b
Slide 11: Leading Growth Profile
Leading Growth Profile Alterra has one of Canada’s largest clean energy development pipelines 2,500 600 2,250 500 203 2,000 153 1,750 MW a (end of year) 400 1,500 GWh a 156 300 73 1,250 73 73 156 1,000 94 200 94 94 750 243 500 100 185 165 131 131 250 0 0 2012 2013 2014 2015 2016e GEOTHERMAL HYDRO WI
Slide 12: Recent News
Recent News Recent positive events: Agreement with EDC outlining terms for potential partnership in Chile and Peru 2012 production through 3Q: 100% of budget $37.5 MM infusion into Iceland company per exercise of partner option, increasing partner stake to 33.4% Unsolicited, friendly offer f
Slide 13: Alterra: Headwinds / Tailwinds
Alterra: Headwinds / Tailwinds Headwinds Tailwinds Growth of natural gas reserves BC growth: “move the gas Disappearance / uncertainty cleanly” around programs that benefit High supply of capital for renewable power energy projects Gas acceptance by some as a Attractiveness of Canada “cl
Slide 14: 2012: Next Milestones
2012: Next Milestones Looking ahead in 2012 and 2013: Upper Toba run-of-river hydro: Complete optimization of project design Finalize partnership arrangements / equity capital Finalize project financing Begin construction by mid-2013 Reykjanes 3+4 geothermal Finalize PPA amendment (in process) O
Slide 15: Analyst Coverage and Capital Structure
Analyst Coverage and Capital Structure CAPITAL STRUCTURE: ( NET INTEREST ) MARKET CAPITALIZATION (30 NOVEMBER 2012) C$ 193 MM CASH (30 SEPTEMBER 2012) US$ 42 MM TOTAL ASSETS (30 SEPTEMBER 2012) US$ 947 MM LONG TERM DEBT (30 SEPTEMBER 2012) US$ 500 MM FIRM CONTACT Canaccord Genuity Jared Alexander CI
Slide 16: Appendices
APPENDICES DECEMBER Page | 16 2012 www.alterrapower.ca www.alterrapower.ca TSX : AXY
Slide 17: Senior Management
Senior Management Outstanding development, financial and operations expertise Ross Beaty: Executive Chairman Mr. Beaty is a geologist and resource company entrepreneur with over 40 years of experience in the international minerals industry. He is the founder of Magma Energy Corp., Pan American Silve
Slide 18: Board of Directors
Board of Directors Ross Beaty Mr. Beaty is a geologist and resource company entrepreneur with more than 40 years of experience in the international minerals industry, the founder and chair of Magma Energy Corp and Pan American Silver (TSX: PAA, NASDAQ: PAAS) and several other resource companies Exec
Slide 19: Overview - Toba Montrose Hydro
Overview - Toba Montrose Hydro Alterra owns a 40% economic interest in two run-of-river hydroelectric generation facilities in southwestern British Columbia Facilities East Toba River and Montrose Creek Capacity & Production 235 MW generating 727 GWh / year 60% - GE EFS Ownership 40% - Alter
Slide 20: Overview - Dokie 1 Wind Farm
Overview - Dokie 1 Wind Farm Alterra owns a 51% economic interest in the Dokie 1 wind farm, located in northern British Columbia Facilities Dokie Wind Farm Capacity & Production 144 MW generating 330 GWh annually 51% - Alterra Ownership 49% - GE EFS Start of Operation March 2, 2011 Power P
Slide 21: Overview - Svartsengi and Reykjanes Geothermal
Overview - Svartsengi and Reykjanes Geothermal Alterra’s 67% - owned subsidiary HS Orka owns two geothermal power plants in southwestern Iceland Facilities Svartsengi and Reykjanes 172 MW generating 1,258 GWh /year Capacity & Production Thermal (hot water) production 150 MWth 67% - Alterra O
Slide 22: Overview - Soda Lake Geothermal
Overview - Soda Lake Geothermal Alterra owns a 23 MW geothermal power plant near Fallon in northern Nevada Facilities Soda Lake 1+2 23 MW, currently operating at 15 MW gross and generating Capacity / Production 84 GWh /year Ownership 100% Alterra Start of Operation 1987 / 1991 Power Purchase
Slide 23: Overview - ABW Solar
Overview - ABW Solar Alterra has agreed to acquire a 10% interest in a portfolio of solar facilities from First Solar, to be built in southern Ontario Facility 3 solar facilities in southwestern Ontario Amherstburg – 10 MW Capacity Belmont – 20 MW Walpole – 20 MW Proposed 90% - GE EFS Owne
Slide 24: Overview - Upper Toba Valley Hydro
Overview - Upper Toba Valley Hydro A power purchase agreement and permitting are in place for additional run of river hydro plants near the Toba Montrose facilities in southwestern B.C. Jimmie Creek and Upper Toba River Locations In close vicinity to existing Toba Montrose facility Capacity / Pr
Slide 25: Overview - Reykjanes 3 & 4 Geothermal Expansion
Overview - Reykjanes 3 & 4 Geothermal Expansion The Reykjanes geothermal reservoir shows solid promise for further utilization and is permitted for an expansion of production Location Existing Reykjanes facility and steam field Capacity / Production 80 MW generating 630 GWh annually 67% - Alte
Slide 26: Overview - Dokie 2 Wind Farm Expansion
Overview - Dokie 2 Wind Farm Expansion The Dokie Wind Farm in northern B.C. is permitted for a 156 MW expansion Location Undeveloped ridgelines within Dokie 1 wind farm area Capacity / Production 107 to 156 MW, generating 330-460 GWh annually 51% - Alterra Ownership 49% - GE EFS Permitting
Slide 27: Overview - Mariposa Geothermal (Chile)
Overview - Mariposa Geothermal (Chile) The Mariposa geothermal field in Chile has an inferred capacity of 320 MW In the Andes Mountains in south-central Chile, approximately 300 Location km south of Santiago 320 MW inferred resource with promising characteristics Capacity / Production Exploita
Slide 28: Overview - Geothermal Assets in Peru
Overview - Geothermal Assets in Peru Alterra’s new concessions in Peru are at an early stage of exploration and development 100% Alterra Ownership Interest from multiple prospective partners Region of hot springs and silica sinters Opportunity Alterra plan: advance to inferred status Stron
Slide 29: Overview - Mensano and Roccastrada Geothermal (Italy)
Overview - Mensano and Roccastrada Geothermal (Italy) Alterra’s exploration concessions in Italy are in the historic and promising Larderello region of Tuscany 100% Alterra Ownership Interest from multiple prospective partners 32 geothermal plants already operating in region Opportunity Attr