Slide 1: Havilah Resources: Mutooroo Copper-Cobalt Project
HAVILAH RESOURCES Mutooroo Copper-Cobalt Project
Slide 2: Disclaimer
Disclaimer • The information contained in this presentation is not financial product advice. The presentation is for information purposes and is of a general and summary nature only. Havilah Resources NL (Havilah) nor any member of the Havilah Group of companies, gives no warranties in relation to t
Slide 3: Project Location
Project Location Mutooroo Project Location •16 km south of railway line and main highway •60 km southwest of regional mining city of Broken Hill
Slide 4: Project Location
€ Oban | U Benagerie| e303 (2.1 Mining Lease granted i Portia Au Horn porta 720,000 tonnes @ 2.9 g/t Au° 11.3 Mt @ 0.89% Cu, 0.64 g/t Au & 500 ppm Mot | 8.2 mt @ 260ppm T | Havilah mineral tenement boundary 00 tonne) 4. Frome Geothermal & Project 84,000 PJ published inferred heat energy resource 640
Slide 5: Project Site
Mutooroo Project Site
Slide 6: Copper-Cobalt Project
Mutooroo Copper-Cobalt Project •Close to railway and Broken Hill. •Simple open pit mining proposition. •Opencut to 200m at least with ore extending beyond 300m depth •Massive pyrrhotite orebody occurring as a series of 45° dipping lode zones. 13.1 Mt @ 1.48% Cu within ore envelope •Over 300 drill ho
Slide 7: Cross Section
220.1 approximate base of — weathering 2001 180 L 160.L 1401. 100 L BOL. metres above sea level 493600 W 19.5m @ 0.6% Cu HAVILAH RESOURCES NL MUTOOROO PROJECT CROSS-SECTION SHOWING ORE ZONES July 2008 Havilah Resources NL
Slide 8: Cross Section
-30L 40 L -50L -60L -70L 4m @ 20L 2.2% Cu 0.28% Co -90L 31im@ 1.71% Cu sini 0.18% Co -10L “120 L -130.L 493550 W 493600 W Mutooroo Cross-section /HR\ Havilah Resources NL
Slide 9: Copper-Cobalt Project – Deep Sulphide Lodes
Mutooroo Copper-Cobalt Project– Deep Sulphide Lodes
Slide 10: Massive Sulphide Ore
Mutooroo Massive Sulphide Ore •Massive sulphide ore: Pyrrhotite (Fe &S) quartz Pyrite (Co), Chalcopyrite(Cu) Quartz chalcopyrite •Very heavy = lot pyrrhotite of tonnes for a small mining volume •Low impurities such as arsenic & cadmium
Slide 11: Processing Flowsheet
Mutooroo Processing Flowsheet Conventional open pit mining 500K tpa Crushing and gravity beneficiation to remove quartz Magnetic separation followed by flotation to produce high grade copper concentrate Roast iron sulphides to produce 540K tpa sulphuric acid Leach calcine residue to recover cobalt a