Ppx Mining Corp. · TSXV:PPX

Ppx Mining — Investor Presentation (January 2022)

17 slides from Ppx Mining's investor presentation, January 2022

  1. Slide 1: Corporate Presentation

    Corporate Presentation WWW.PPXMINING.COM January 2022 TSX.V: PPX BVL.PPX

  2. Slide 2: Forward Looking Statements and Cautionary Disclaimer

    Forward Looking Statements and Cautionary Disclaimer All statements, other than statements of historical fact, contained in this presentation constitute “forward-looking statements” and are based on the reasonable expectations, estimates and projections as of the date of this presentation. Forward-l

  3. Slide 3: Exploration Drives Production and Value Creation

    Exploration Drives Production and Value Creation Aggressive exploration brings Resource and Reserve growth: • Exploration drilling planned with a focus on the Callanquitas structure and the Portachuelos discovery • Pre-plan for future production increases….exploration drives future expansion • Distr

  4. Slide 4: Strategic Land Package in the Heart of the Northern Peru Copper-Gold Belt

    Strategic Land Package in the Heart of the Northern Peru Copper-Gold Belt 1300 Ha • PPX controls a large portion of the surface rights at Igor, including the Callanquitas mine site and the Plant Site • Community agreements in place allowing all operations, including processing, mining and exploratio

  5. Slide 5: IGOR Geologic Setting

    IGOR Geologic Setting 780000 781000 782000 783000 784000 -300000 300000 900000 10000000 10000000 3650 0 335 ® 34 00 75 33 34 25 3575 9155000 9155000 • Au and Ag mineralization HL Processing 3650 35 s 3450 00 ita 365 0 qu 3475 3525 365 an 9400000 9400000 IGOR 4 (200 Ha) 0 Este hosted by Cretaceous Pl

  6. Slide 6: IGOR: Multiple Au-Ag Deposits in a District-Scale System

    IGOR: Multiple Au-Ag Deposits in a 3800 Metres Domo District-Scale System Callanquitas Portachuelos Tesoros Village Igor 2900 Metres WWW.PPXMINING.COM TSX.V: PPX BVL.PPX

  7. Slide 7: Callanquitas Structure – Reserve and Resource Growth

    Callanquitas Structure – Reserve and Resource Growth • The entire Callanquitas resource and reserve is unconstrained by drilling at depth AND along strike • The deepest drill holes and resource/reserve blocks are also the highest grades, e.g. CA-17-85, 3.3m grading 27.72 gpt Au and 242 gpt Ag (30.97

  8. Slide 8: Portachuelos Discovery

    Portachuelos Discovery 40.2m @ 2.72 gpt • Portachuelos is a new discovery, previously Au Eq undrilled, located over 800 metres south of the Callanquitas resource • Drill hole CA-18-94, intercepted 40.2 metres grading 1.18 gpt Au and 115.4 gpt Ag (2.72 gpt Au Eq.) at a vertical depth of only 25 metre

  9. Slide 9: Portachuelos Discovery: Confirms the District-Scale Potential of Igor

    Portachuelos Discovery: Confirms the District-Scale Potential of Igor • Multiple, stacked mineralized zones support large tonnage potential. Mineralization has been traced by drilling over a strike length of at least 1000m, to depths of >300m and has a true width of up to 45m WWW.PPXMINING.COM TSX.V

  10. Slide 10: Portachuelos Discovery: Magnetic Data Reveals Regional-Scale Structure

    Portachuelos Discovery: Magnetic Data Reveals 3650 50 33 34 00 75 33 34 25 3650 s 3450 Regional-Scale Structure ita 36 50 qu 3475 36 an 50 IGOR 4 (200 Ha) ste 3625 al l CAMPAMENTO CALLANQUITAS 36 uitas E 00 tC 35 75 3600 ge 3575 Callanq 59.3 / 0.4m 0 00 340 36 r Tania Ta 2850 2950 3575 00 36 21.4 /

  11. Slide 11: IP-Resistivity Highlights Tesoros and Callanquitas Structures

    -300000 300000 900000 10000000 3650 50 33 34 00 7 5 ® 33 34 25 3575 3650 35 s 3450 00 ita 36 50 qu 3475 3525 36 an 50 9400000 ste 3625 35 al l CAMPAMENTO CALLANQUITAS 50 36 uitas E 00 35 75 IP-Resistivity Highlights Tesoros and Callanquitas Structures tC 35 75 3600 35 75 ge 3575 Callanq 59.3 / 0.4m

  12. Slide 12: Nearly Two Years of Mine Production De-Risks Igor: Proof of Concept

    Nearly Two Years of Mine Production De-Risks Igor: Proof of Concept • PPX has processed over Mined to Date 114,000 tonnes of ore with an average grade of 8.9 gpt Au at a nearby toll mill producing over 19,500 ounces Au. Average grade to date is nearly two-times Reserve Grade LOM • Over 10,000 tonnes

  13. Slide 13: Highlights of Igor Project Pre-Feasibility Study (“PFS”)

    Highlights of Igor Project Pre-Feasibility Study (“PFS”) • Pre-tax Internal Rate of Return (“IRR”) of 64% at $1250/oz gold and $16.50/oz silver, 59% post-tax. • Average Life of Mine (“LOM”) cash operating costs of $601/oz gold equivalent (“AuEq”) recovered and all-in sustaining costs (“AISC”) of $81

  14. Slide 14: PPX is Committed to our Communities

    PPX is Committed to our Communities • Economic development • Sustainable programs • Open communication • Healthy & safe work environment • Ethical conduct • Respect for human rights rs Co de m ol m eh un ar ity Sh Team WWW.PPXMINING.COM TSX.V: PPX BVL.PPX

  15. Slide 15: Why PPX?

    Why PPX? Intelligent, low-risk growth leveraged to gold price and exploration upside 1) Aggressive exploration brings Resource and Reserve growth • Exploration drilling planned with a focus on the Callanquitas structure and the Portachuelos discovery • Pre-plan for future production increases….explo

  16. Slide 16: PPX Capital Structure

    PPX Capital Structure TSX.V Toronto Stock Exchange BVL Venture Bolsa de Valores: Peru SSE Santiago Stock Exchange Total Shares Outstanding: 508.9 M Market Capitalization: Cdn$20.4M Ave. Trading Volume (TSX, BVL, SSE; 3 mos.): >100,000 shares/day Key Shareholders: Peruvian Investors 27% European Inst

  17. Slide 17: Resources and Reserves

    Resources and Reserves Mineral Resource Statement 2018 Igor Reported Resources (2.0 gpt AuEq cutoff) Type Class Tonnes gpt Au oz Au gpt Ag oz Ag gpt Au Eq oz Au Eq Measured 109,000 5.32 19,000 61.7 215,000 5.59 20,000 § 69% of the current Indicated 1,361,000 4.67 204,000 113.4 4,962,000 5.17 226,000

PPX Mining — Investor Presentation (January 2022) on 6ix