United Heat Transfer Ltd. · NSE:UHTL
United Heat Transfer — H2 FY2026 Earnings Presentation
29 slides from United Heat Transfer's earnings presentation, Jun 2, 2026
Slide 1: Letter to National Stock Exchange of India
Date: 02nd June, 2026 To, National Stock Exchange of India Ltd. Address: Exchange Plaza, Plot no. C/1, G Block, Bandra-Kurla Complex, Bandra (E), Mumbai – 400 051. NSE Scrip Symbol: UHTL Subject: Investor Presentation H2 FY 2026 Respected Sir/Madam, Pursuant to Regulation 30 of the Securities and Ex
Slide 2: Investor Presentation – H2 & FY26
EMBRACING TODAY, EMPOWERING TOMORROW. UNITED HEAT TRANSFER LTD Investor Presentation – H2 & FY26
Slide 3: Disclaimer
DISCLAIMER This document has been prepared for information purposes only and is not an offer or invitation or recommendation to buy or sell any securities of United Heat Transfer Ltd (“UHT”, “United Heat Transfer”, “United Heat”, "Company“), nor shall part, or all, of this document form the basis of
Slide 4: Presentation Flow
PRESENTATION FLOW Business & Financial Highlights Way Forward Business Overview Company Introduction I n v e s t o r P r e s e n t a t i o n 3
Slide 5: Company Introduction
EMBRACING TODAY, EMPOWERING TOMORROW. COMPANY INTRODUCTION INVESTOR PRESENTATION 4
Slide 6: Company Snapshot
COMPANY-SNAPSHOT Manufacturer of shell and tube heat exchangers, air-cooled heat exchangers, pressure vessels, and process flow skid equipment 1,20,000 Incorporated in January 1995 Sq.Ft covered Wide spectrum of Heat Exchangers - Air-Cooled Heat Exchangers, Shell and Tube Heat Exchangers, Extended S
Slide 7: Roadmap
ROADMAP 2021 2022 2024 ISO 14001: 2015 Supplied 1st CU TR certified Launched IPO in October ISO 45001: 2018 order 2024 (environmental sustainability and (highlights UHTPL’s export readiness, occupational health and safety) compliance with international standards) 2020 New Facility Expansion (80,000
Slide 8: Leadership Team
Chairman and Whole Time Managing Director Director LEADERSHIP TEAM MR.YOGESH PATIL MR.VIVEK PATIL Has more than 29 years of experience in Holds a Post – Graduate Diploma in the areas of Production, commercial, Boiler and Process Equipment Design finance and Heat Exchanger Industry. and Engineering.
Slide 9: Business Overview
EMBRACING TODAY, EMPOWERING TOMORROW. BUSINESS OVERVIEW I N V E S T O R P R E S E N T A T I O N 8
Slide 10: Business Model – Design to Delivery
BUSINESS MODEL – DESIGN TO DELIVERY OEM & Auto OEM Project / EPC • Standard Heat Transfer Equipment • Custom, Made-to-Order Solutions • One-time development / Schedule-based supply • Project-based engagements Revenue Model Revenue Model • Recurring revenue through volume-based standard • High-value,
Slide 11: Diverse Product Line [1/2]
DIVERSE PRODUCT LINE [1/2] Air Cooled Heat Charged Air Extended Surface Jacket Water Marine Heat Exchanger Cooler Heat Exchanger Heat Exchanger Exchangers Used to transfer heat from a fluid Integral to engine performance, Featuring increased surface area for Designed Jacket Water Heat Specifically d
Slide 12: Diverse Product Line [2/2]
DIVERSE PRODUCT LINE [2/2] Moisture Pressure Process Flow Shell and Tube Safe Tube Heat Separator Vessel Skid Heat Exchangers Exchanger Moisture separators operate based on Engineered to safely contain fluids or Tailored to specific project Versatile and robust, these Safe Tube Heat Exchanger is a p
Slide 13: Manufacturing Facility
MANUFACTURING FACILITY Additional new facility acquired to expand production capability of Air cooled Heat Exchangers and large sized heat exchangers Registered office & Manufacturing Manufacturing Clean Room for production of equipment from special materials (In expansion plans) Unit – 1 Unit – 2 ~
Slide 14: Fabrication & Machining Process
FABRICATION & MACHINING PROCESS Cutting Machining Rolling Drilling Welding Heat Treatment Tube Finning Fin Shot Blasting & Anti-Corrosion Facility Machine Stamping Painting Booth Coating ▪ CNC and plasma ▪ Machining ▪ Maximum width ▪ Tube-sheet cutting upto forming upto 3 3 meter drilling upto ▪ GTA
Slide 15: In House Quality Assurance
IN HOUSE QUALITY ASSURANCE Certified Welding Engineers NDT Level-II for DPT , RT 01 02 Inhouse Testing Facilities Welding Process qualification as per ASME IX & EN Standard. ▪ DPT (Level II & Level I Certified) 03 ▪ RT Film review (Level II Certified) ▪ Pneumatic 04 Welder Qualification for Weld Ove
Slide 16: Competitive Strengths
COMPETITIVE STRENGTHS Integrated Heavy Material In-house Engineered-to- Comprehensive Trusted manufacturing engineering versatility design & order solutions quality customer excellence capability engineering assurance partnerships expertise Streamlined Advanced Wide range of raw Proficiency across C
Slide 17: Sectors Covered and Performance
SECTORS COVERED PERFORMANCE Production Capacity Proposed to enhanced by 25-30% Refinery Oil & gas Approved for exotic alloys in EIL, ONGC,MDL,IOCL & Others New Product Development like Moisture Separator, Compressor Diesel & gas genset Exhaust Gas Cooler, Safe Tube Heat Exchanger & Automatic Backflu
Slide 18: Our Valued Clientele
OUR VALUED CLIENTELE AUTO OEMOEM EPC I n v e s t o r P r e s e n t a t i o n 17
Slide 19: Trusted Globally, Engineered in India
TRUSTED GLOBALLY, ENGINEERED IN INDIA Canada Netherlands Russia Germany Poland France Italy USA Iran South Korea Dubai,UAE India Egypt Algeria Saudi Arabia Malaysia Indonesia Rwanda Singapore South Africa I n v e s t o r P r e s e n t a t i o n 18
Slide 20: Way Forward
EMBRACING TODAY, EMPOWERING TOMORROW. WAY FORWARD I N V E S T O R P R E S E N T A T I O N 19
Slide 21: Way Forward
WAY FORWARD Strategically focusing on establishing presence in the Data Center Infrastructure segment with development of Cooling Distribution Units (CDUs), also added Vertiv as a new customer in the Data Center cooling solutions business. Aiming to increase Exports by strengthening the recurring ex
Slide 22: Business & Financial Highlights
EMBRACING TODAY, EMPOWERING TOMORROW. BUSINESS & FINANCIAL HIGHLIGHTS I N V E S T O R P R E S E N T A T I O N 21
Slide 23: Business Highlights
BUSINESS HIGHLIGHTS Capacity Expansion – Expansion into Data Talegaon Plant Centre Cooling Solutions Onboarded Vertiv as a new customer for Cooling Distribution Unit (CDU) solutions Construction of ~50,000 sq. ft. Focused on improving throughput, Additional infrastructure and First commercial supply
Slide 24: Income Statement – H2'FY26
INCOME STATEMENT – H2’FY26 Particulars (INR Mn) H2FY26 H1FY26 H2FY25 YoY% HoH% Key Highlights: Revenue from Operations 514.4 214.4 384.1 33.9 139.9 Total Expenditure 435.4 188.8 335.0 30.0 130.5 Revenue from Operations Cost of Goods Sold 287.1 72.3 192.0 49.5 297.2 Grew 33.9% YoY to INR 514.4 Mn in
Slide 25: Annual Income Statement
ANNUAL INCOME STATEMENT Particulars (INR Mn) FY22 FY23 FY24 FY25 FY26 Revenue from Operations 476.5 699.5 601.9 668.1 728.8 Total Expenditure 414.9 621.8 502.0 554.3 624.2 Cost of Goods Sold 266.3 403.1 338.4 324.5 359.3 Employee expenses 52.7 64.3 61.4 85.7 106.3 Other expenses 96.0 154.3 102.2 144
Slide 26: Balance Sheet
BALANCE SHEET Particulars (INR Mn) FY24 FY25 FY26 Particulars (INR Mn) FY24 FY25 FY26 EQUITY & LIABILITIES ASSETS Shareholders’ Funds 204.4 585.2 635.3 Non-Current Assets 374.8 380.9 431.5 Share Capital 127.5 190.0 190.0 Property, Plant & Equipment 342.9 341.0 350.4 Reserves & Surplus 76.9 395.2 445
Slide 27: Annexures
EMBRACING TODAY, EMPOWERING TOMORROW. ANNEXURES I N V E S T O R P R E S E N T A T I O N 26
Slide 28: Our Certifications & Global Compliance
OUR CERTIFICATIONS & GLOBAL COMPLIANCE WORKFLOW CERTIFICATIONS GLOBAL APPROVALS ISO 9001:2015 ▪ ASME U STAMP (QUALITY MANAGEMENT SYSTEM) ▪ PED REGULATIONS (CE MARKING) ▪ CANADIAN REGISTRATION CERTIFICATE ISO 14001:2015 (ENVIRONMENTAL MANAGEMENT SYSTEM) ▪ DOSH (MALAYSIA) ▪ ALGERIAN HYDROCARBONS REGUL
Slide 29: Thank You
United Heat Transfer Limited Corporate Office & Unit 1 : F-131, MIDC, Ambad, Nashik 422010, Maharashtra, India company.secretary@unitedheat.net unitedheat.net THANK KAPTIFY® Consulting YOU Strategy & Investor Relations | Consulting contact@kaptify.in | +91-845 288 6099 www.kaptify.in 28
United Heat Transfer — H2 FY2026 Earnings Presentation on 6ix