Tlou Energy Ltd · ASX:TOU

Tlou Energy — Shareholder Meeting (November 2014)

24 slides from Tlou Energy's shareholder meeting presentation, Nov 6, 2014

  1. Slide 1: Cover letter: 2014 AGM Presentations

    Tlou Energy Ltd 210 Alice Street Brisbane Qld 4000 Phone: +61 7 3012 9793 Fax:- +61 7 3003 0675 www.tlouenergy.com Our Ref: Stephen Rodgers Your Ref: For personal use only 6 November 2014 Company Announcements Office Australian Securities Exchange Limited 20 Bridge Street Sydney NSW 2000 Dear Sir /

  2. Slide 2: Chairman's address - AGM

    TLOU ENERGY LIMITED Chairman’s address - AGM It gives me great pleasure to deliver the Chairman’s address at Tlou’s second AGM as a For personal use only listed entity. The past year has been an exciting year for Tlou, with the continuing progression and expansion of our Lesedi CBM project in Botswa

  3. Slide 3: Managing Director's address - AGM

    TLOU ENERGY LIMITED Managing Director’s address - AGM Welcome to this our second AGM as a listed entity. For personal use only The company has had a very active year operationally. The results to date are outlined in today’s presentation, with key points including:  Highly encouraging gas pressures

  4. Slide 4: 2014 AGM Presentation

    For personal use only 2014 AGM Presentation Date: 6th November 2014

  5. Slide 5: Disclaimer

    Disclaimer For personal use only Disclaimer Future performance This presentation (Presentation) has been prepared by Tlou Energy Limited (Tlou). The Presentation and This Presentation contains certain “forward-looking statements”. Forward looking words such as, “expect”, information contained in it

  6. Slide 6: About Tlou Energy

    About Tlou Energy For personal use only Who we ASX listed coalbed methane (CBM) company are What CBM in Botswana we do Our Provide a clean and reliable energy Goal source to Botswana & southern Africa 3

  7. Slide 7: Company Overview

    Company Overview For personal use only Market Cap: Share Price: $0.28 ~$41m (5 Nov 2014) 148m shares Operations: Acreage: Botswana 10 Permits 100% owned 4 pilot locations HQ: Brisbane ASX: TOU 4

  8. Slide 8: Key Information

    Key Information For personal use only Lesedi CBM Project • Botswana’s most advanced • 100% owned and operated NSAI Certified Contingent Resources • 152 BCF (2C) • 2,322 BCF (3C) Significant market opportunity • High energy demand Location • Low cost • Supportive government 5

  9. Slide 9: Experienced Team

    Experienced Team For personal use only Board of Directors Key In-Country Management Nathan Mitchell – Chairman •17 years in resource exploration •International Operational Experience •Pioneer of CBM drilling techniques Gabaake Gabaake – African Regional Manager •Geologist and former Botswana public

  10. Slide 10: Botswana Field Operations

    Botswana Field Operations For personal use only 7

  11. Slide 11: Operational Focus

    Operational Focus For personal use only • ~8,300km2 • ~100 well database • Two pilots testing: o Selemo pod – Lateral o Mopani 2 – Vertical • Two pilots being completed: o Lesedi pod – Lateral o Lesedi 2P – Vertical 8

  12. Slide 12: Lesedi Project

    9 For personal use only Lesedi Project

  13. Slide 13: Lesedi CBM Project Technical Fundamentals

    Lesedi CBM Project For personal use only Technical Fundamentals Coal depth ~300-700m Cumulative net coal thickness ~25m (Average) Gas contents 4-6 m3/t (DAF) (Average) Unstimulated reservoir ~2-5mD permeability per DST Gas compositions 75%+ methane 10

  14. Slide 14: Horizontal Pilot Design

    Horizontal Pilot Design For personal use only • Horizontal wells (~750m in-seam) with vertical pumping well • Lesedi completed as a dual lateral • Selemo completed as a single lateral • Target Reservoir: Basal Morupule coal seam (~6m) 11

  15. Slide 15: Production data - Nov 2014

    Production data - 5 Nov 2014 For personal use only Downhole Vertical well Pressure casing pressure Lateral well casing pressure 12

  16. Slide 16: Production data - Nov 2014

    Production data - 5 Nov 2014 For personal use only Downhole Vertical well pressure casing pressure Swap out valve 13

  17. Slide 17: Botswana Operations

    Botswana Operations For personal use only 14

  18. Slide 18: Commercial opportunities

    Commercial opportunities For personal use only 15

  19. Slide 19: Commercialisation

    Commercialisation For personal use only Sequence • Compressed Natural Gas (CNG) – proof of concept • Existing Orapa Power Station – 90MW Gas or Diesel • Proposed Power Station – 300MW Gas &/or Coal • Proposed export Existing Power Grid • 33kV close to Lesedi Project • 220kV to the east • 400kV Inter

  20. Slide 20: Commercialisation: Proof of concept

    Commercialisation For personal use only Proof of concept • Power local primary school via CNG • Kodibeleng township ~80km • Low capital cost Flow gas CNG at well site Truck CNG Power school 17

  21. Slide 21: Independently Certified Contingent Resources (NSAI)

    Independently Certified Contingent Resources (NSAI) For personal use only Resource Statement Contingent Resource OGIP(2) Unrisked Gross (100 Percent) Unrisked Net (100 Percent) Category (BCF) (BCF) (BCF) • 152 BCF (2C) Contingent Resources Low Estimate (1C) (1) 0.0 0.0 0.0 • 2,322 BCF (3C) Best Esti

  22. Slide 22: Forward Plan

    Forward Plan For personal use only MOU for Reserve Expanded Reserve Flow gas program gas supply certification upgrade • Achieve • In progress • Target • Additional • Target commercial 1H 2015 pods based 2H 2015 rates on results 19

  23. Slide 23: Tlou Energy Limited summary

    Tlou Energy Limited (ASX:TOU) For personal use only Botswana CBM focus 148m shares Market Cap: ~A$41m Cash Balance: ~A$7.6m (Sept 2014) Certified Contingent Resources (NSAI) Supportive government & low cost location Pathway to commercialisation 20

  24. Slide 24: Thank You

    For personal use only Thank You

Tlou Energy — Shareholder Meeting (November 2014) on 6ix