Vantage Metals Limited · ASX:VAN
Vantage Metals — Belararox — Investor Presentation (August 2025)
22 slides from Vantage Metals's investor presentation, August 2025
Slide 1: Investor Presentation & Activity Update
Investor Presentation & Activity Update August 2025 Targeting Tier-1 Copper Discoveries in San Juan, Argentina and Botswana’s Kalahari Belt
Slide 2: Disclaimer
Disclaimer Belararox Limited (”The Company”) does not purport to give financial or investment advice. No account has been Shares in the future. All securities transactions involve risks, which include (among others) the risk of adverse or taken of the objectives, financial situation or needs of any
Slide 3: Corporate Overview
Corporate Overview BELARAROX BOARD OF DIRECTORS CAPITAL STRUCTURE Share Price* A$0.081 52 Week Range $0.325 - $0.052 Shares on Issue 161,998,977 Options expiring 13 July 2026 (66c exercise price ASX:BRXOA) 38,716,761 Mr. Neil Warburton Mr. Arvind Misra Mr. Tim Zuo Mr. John Traicos Non-Executive Chai
Slide 4: Investment Highlights: 2 Projects, 2 Tier 1 Districts
Investment Highlights 2 PROJECTS 2 TIER 1 DISTRICTS | 1 CLEAR FOCUS | MAJOR COPPER DISCOVERIES TMT Project (Argentina) KC Project (Botswana) First Mover advantage Highly prospective 320 Drilling of first two Comprises 14 Located in a region with in a new and km² landholding with high-priority target
Slide 5: TMT Project (100% BRX) – San Juan, Argentina
TMT Project (100% BRX) – San Juan, Argentina EXPLORING FOR ELEPHANTS IN A LAND OF COPPER GIANTS Strategically located near major Highly prospective 320 km² copper and gold discoveries such landholding located in an area as Filo del Sol (Lundin), Josemaría boasting large copper porphyry (Lundin), Val
Slide 6: Two High Priority Targets Drill Tested
Two High Priority Targets Drill Tested Systematic Exploration • Spectral satellite anomalies identified a target-rich environment • Systematic field mapping and sampling obtained a total of 805 samples in the last field season, 605 rock chip and 200 talus samples Drilling • Phase 1 drilling at TMT t
Slide 7: Tambo South – Drilling
Tambo South – Drilling • First pass drilling at Tambo South intersected multiple copper mineralised intervals within broad and continuous zones of anomalous copper values • Updated 3D geological and geochemical modelling confirms mineralised zones at Tambo South remain open laterally and at depth •
Slide 8: Toro South Target
Toro South Target Picture taken from the TMT camp (~3300m asl, looking south towards the Toro South target 8
Slide 9: Toro South Exploration
Toro South Exploration Toro South • •Toro Toro SouthSouth target target sitssits 20km20km southeast southeastof ATEX of ATEX Resources' Resources'Valeriano ValerianoProject Project (current (current MREMRE of of 1.41 1.45 billion billion tonnes tonnesat 0.67% at 0.67% CuEq)CuEq) • •Toro Toro SouthSo
Slide 10: TMT Video
TMT Video CLICK HERE TO WATCH VIDEO ON YOUTUBE 10
Slide 11: Toro South – Surface Sampling
Toro South – Surface Sampling Exploration Results: • Surface sampling at Toro South has returned assay results of up to 1.41% Cu, 1.28 ppm Au, 421 ppm Ag, 8.13% Zn, and >20.0% Pb • Surface sampling of anomalous copper, gold and silver, pointing to a potential epithermal system overlying a deeper por
Slide 12: Toro South – Epithermal and Porphyry Targets
Toro South – Epithermal and Porphyry Targets • Surface sampling of anomalous copper, B B’ gold and silver, pointing to a potential epithermal system overlying a deeper porphyry target. • Geophysical MT surveys are planned to refine targeting at Toro South and Tambo Epithermal South ahead of potentia
Slide 13: Investment Highlights - KCP: Exploring for Copper Giants
Investment Highlights - KCP EXPLORING FOR COPPER GIANTS IN THE LAND OF ELEPHANTS KC Project (100% BRX) Proven Track Record Poised to Deliver Significant Growth • Kalahari Copper project in • Proven exploration team with a • Kalahari Copper Belt has the highest Botswana - A region hosting successful
Slide 14: Kalahari Copper Project
Kalahari Copper Project Kalahari Copper Project Highlights • Project located in the prolific Kalahari Copper Belt in Botswana • 14 tenements covering 4,268 km2 of land in prospective areas • Targeting sediment-hosted copper deposits • Tenements along strike of known copper-silver mineralisation • Kn
Slide 15: Exploration
Exploration Idealised Target: • Thickness: 10-50 m Kalahari Sands Cover typically 50-100m • Width: up to 500 m +/- Mamuno Sediments typically 0~1500 m (eroded in parts) • Stike length: 2-5 km • Grade: 0.5% to 2% copper Methodology: Upper D’Kar Magnetic, easily identifiable on regional magnetics • Id
Slide 16: KCP Video
KCP Video CLICK HERE TO WATCH VIDEO ON YOUTUBE 16
Slide 17: Target Testing - August 2025
Target Testing - August 2025 PL0085 Magnetics (contact) Gravity (structure) Targets • Adjacent to Cobre Ngami Copper Project • Along strike from Kitlanya West • Along strike from drill tested targets 1 2 Target Definition • 4 target zones 3 • DKF-NPF contact along faults • Gravity line • Regional ma
Slide 18: 2026 Program
2026 Program Drill Test Existing Targets PL770 & PL771 New Target Definition via AEM then Drill Testing AEM Survey Area Preliminary Drill Locations 18
Slide 19: Exploring for Large Copper Deposits
Exploring for Large Copper Deposits Belararox Limited (ASX:BRX) Arvind Misra Managing Director arvind.misra@belararox.com.au Tim Zuo Non-Executive Director / Corporate Advisor tim.zuo@belararox.com.au Paul Berson Corporate Storytime paul@corporatestorytime.com www.belararox.com.au This presentation
Slide 20: Competent Person Statements
Competent Person Statements Competent Person Statement Mr Chris Blaser is the Exploration Manager of Belararox Ltd and is a Competent Person who is a Member of the Australasian The information in this announcement that relates to Belara and Bullabulling exploration results is extracted from ASX Inst
Slide 21: TMT Team
a | ay oan Juan ad cohen Ministerlode Minerta i. ~ _
Slide 22: KCB Team
KCB Team 22