Slide 1: Investor Presentation August 2013: Strong Heritage Strong Future
Investor Presentation August, 2013 Strong Heritage Strong Future
Slide 2: Forward-Looking Statements
Forward - Looking Statements 2 This report contains forward - looking statements within the meaning of the Private Securities Litigation Reform Act of 1995, including, without limitation, statements about the proposed change in corporate structure as well as statements as to the expectations, belief
Slide 3: Great Equipment, Great People
Great Equipment Great People Demonstrating A Reputation For Operational Excellence Around… 3 Great Equipment Most advanced UDW drillships in the industry Industry leading position in high - spec jack - ups One of the youngest fleets in the industry Industry leading day rates and highest utilization
Slide 4: Rowan's Fleet Is Geographically Diversified
Rowan’s Fleet Is Geographically Diversified 4 6 / North Sea 10 / Middle East 4 / SE Asia 19 High - spec Jack - ups 8 Premium Jack - ups 3 Commodity Jack - ups with Skid - base Capability 7 / US GOM Drillship #1 4 Ultra - Deepwater Drillships Under Construction 1 / Med 2 / Trinidad Drillship #2 Jack
Slide 5: Rowan's $4.6 Billion Backlog Is Diversified
5 Rowan’s $4.6 Billion Backlog Is Diversified $1.2 Bn $1.5 Bn 2010 2011 2012 Current $2.2 Bn $4.6 Bn 25% 14% 44% 9% 3% 2% 3% 1% Norway Middle East Deepwater UK SEA Egypt GOM Trinidad Growing Backlog Distributed By Geography Rowan’s Diverse Customer Base
Slide 6: Rowan Is Entering UDW Market – With Advantages
Rowan Is Entering UDW Market – With Advantages • Long standing brand reputation for operational excellence and customer satisfaction • Very high specification drillship design with built - in redundancies • Core team of highly experienced and respected deepwater professionals already in place • Stro
Slide 7: Rowan Drillships Built With The Operator In Mind
Rowan Drillships Built With The Operator In Mind • Two seven - ram BOPs • Equipped with 12,000 ft of riser • DP - 3 compliant with retractable thrusters • Five mud pumps with dual mud systems • Four million pound riser tensioning system • Third load path • Accommodations for 201 people on board 7 Ex
Slide 8: UDW Drillships Contracted
3 of 4 UDW Drillships Contracted 8 Delivery December 2013 2013 2014 2015 3 Year Contract Commences March 2014 Rowan Renaissance 1 Delivery June 2014 2 Rowan Resolute Delivery October 2014 3 Rowan Reliance Delivery March 2015 4 Rowan Relentless 3 Year Contract Commences September 2014 3 Year Contract
Slide 9: Worldwide Drillship Fleet Totals
Worldwide Drillship Fleet Totals 90 Rigs Total Utilization Is 96% 9 USA Indian Ocean North Sea Middle East Far East Southeast Asia C&S America West Africa Australia 95% 20 Rigs 100% 29 Rigs 100% 16 Rigs 100% 13 Rigs 100% 1 Rig 4 0% 5 Rigs 100% 3 Rigs 100% 1 Rig 100% 1 Rigs Includes data supplied by
Slide 10: Deepwater Demand Fundamentally Strong
Deepwater Demand Fundamentally Strong 2008 – 2013 YTD, Water Depth 4,000’ and Greater 2008 2009 2010 2011 2012 1H 2013 Announced Discoveries by Year 31 36 40 29 53 2 6 2 2 2 4 4 3 10 11 6 1 1 3 5 1 1 5 52 13 8 1 7 1 Includes data supplied by ODS - Petrodata , Inc; Copyright 2013 (as of 08/01/13) 23
Slide 11: Deepwater GOM Activity Expected To Accelerate
Deepwater GOM Activity Expected To Accelerate 11 Historical & Forecasted US GOM Floating Rig Count Deepwater GOM Wells Drilled By Exploration & Development (>1,000 ft) • GOM deepwater rig count forecast to grow from 36 to as many as 60 rigs by 2015 • Development wells forecast to triple to about 70
Slide 12: Both Day Rates And Duration At Attractive Levels
$0 $100,000 $200,000 $300,000 $400,000 $500,000 $600,000 $700,000 1 Year or Less > 1 Year and < 3 Years 3 Years or More 12 Both Day Rates And Duration At Attractive Levels Day Rate Fixtures for 10,000’+ Drillships : January 2005 - Current Rowan Enters UDW Market Includes data supplied by ODS - Petro
Slide 13: Floater Market Bifurcating At A Fast Pace
Floater Market Bifurcating At A Fast Pace 50 60 70 80 90 100 <5,000' 5,000'-7,499' 7,500'-9,999' 10,000'+ % Worldwide Utilization by Water Depth Includes data supplied by ODS - Petrodata, Inc; Copyright 2013 (as of 08/06/13) 13
Slide 14: UDW Newbuilds Being Absorbed By Strong Market
UDW Newbuilds Being Absorbed By Strong Market 14 13 7 5 23 2 12 11 0 5 10 15 20 25 2013 2014 2015 2016+ Contracted Not Contracted 73 - 10,000’+ Drillship Newbuilds Under Construction 16 15 19 • 66% Contracted • Two uncontracted 2013 drillships believed to be committed • 21 contracted units in 2016 a
Slide 15: Rowan Has A Large, Young Jack-up Fleet
15 Age of Global Jack - up Fleet Total Global Jack - up Fleet is 496 Rigs Nearly 2/3 of the jack - up fleet is older than 25 years <10 years 31% >30 years 54% 26 - 30 years 9% 10 - 20 years 4% 21 - 25 years 2% Size of Peer Existing Jack - up Fleets 42 39 30 20 15 7 0 10 20 30 40 50 ESV NE RDC SDRL/N
Slide 16: Rowan Is The Leader In High-spec Jack-ups
Rowan Is The Leader In High - spec Jack - ups Number of High - spec Jack - ups 0 2 4 6 8 10 12 14 16 18 20 Current By YE 2016 19 Rowan High - spec Jack - ups Includes data supplied by ODS - Petrodata, Inc; Copyright 2013 (as of 08/01/13) 16
Slide 17: Rowan Achieves Higher Day Rates And Utilization
Rowan Achieves Higher Day Rates And Utilization Comparison of Current Day Rates: Rowan vs. Peers (000s) Comparison of Utilization 2002 – 2013YTD: Rowan vs. Peers 0 20 40 60 80 100 Rowan Peers (1) Peers include DO, RIG, NE, SDRL/ NADL, and ESV $279 $148 $144 $122 $169 $136 $126 $112 $0 $50 $100 $150
Slide 18: Global Jack-up Fleet Totals
Global Jack - up Fleet Totals 496 Rigs Total Utilization Is 86% 18 US GOM Indian Ocean North Sea Mediterranean Middle East Southeast Asia Mexico C&S America West Africa Australia 60% 60 Rigs 93% 45 Rigs 80% 15 Rigs 93% 28 Rigs 97% 34 Rigs 100% 2 Rigs 88% 73 Rigs 86% 138 Rigs 84% 19 Rigs 100% 42 Rigs
Slide 19: Competitive Jack-up Utilization At 94%
Competitive Jack - up Utilization At 94% 0 100 200 300 400 500 600 Total Supply CS / OOS China / Iran Competitive Supply 496 Total Jack - ups 45 Cold Stacked / OOS 55 Non - competitive countries 396 Competitive Jack - ups 61% older than 25 years 94% Utilization 86% Utilization 19 Includes data suppl
Slide 20: Jack-up Market Continues To Bifurcate
Jack - up Market Continues To Bifurcate 20 40 60 80 100 IS, MS, MC <300'IC 300'IC 350'+ IC(including High Spec) High Spec* Worldwide Utilization By Rig Class % * Excludes Chinese Rig, Master Driller Includes data supplied by ODS - Petrodata, Inc; Copyright 2013 (as of 08/01/13) 20
Slide 21: What's Driving Bifurcation In The J/U Markets?
What’s Driving Bifurcation In The J/U Markets? • Operators need greater rig capabilities to drill challenging wellbore designs » Deep shelf gas » Long reach horizontals » HPHT » Large pipe programs/heavy string weights • IOCs and NOCs are focused on achieving lower wellbore costs rather than the low
Slide 22: Newbuild Jack-ups Should Replace Aging Rigs
Newbuild Jack - ups Should Replace Aging Rigs 22 10 4 1 3 24 22 40 4 0 5 10 15 20 25 30 35 40 45 2013 2014 2015 2016+ Contracted Not Contracted 300’IC+ Newbuilds Under Construction: 108 Total 41 34 26 • 17% Contracted • Only 38 of the 108 units under construction are high - spec • 41 jack - ups have
Slide 23: Newbuild Jack-ups Needed To Replace Aging Fleet
0 10 20 30 40 50 60 70 80 90 Newbuild Jack - ups Needed To Replace Aging Fleet 23 311 JACK - UPS OVER 25 YEARS 261 JACK - UPS IN LATEST CYCLE Jack - ups by Year Built Includes data supplied by ODS - Petrodata, Inc; Copyright 2013 (as of 07/18/13)
Slide 24: A Wave Of Jack-up Retirements Could Be Coming
0 50 100 150 200 250 300 A Wave Of Jack - up Retirements Could Be Coming 24 World jack - up rig population over 40 years old is growing… Includes data supplied by ODS - Petrodata, Inc; Copyright 2013 (as of 07/18/13) # of jack - ups 40+ years JACK - UPS OVER 40+ YEARS IN 10 YEARS 289 18 JACK - UPS O
Slide 25: Rowan Consensus EPS Growth Strongest vs. Peers
Rowan Consensus EPS Growth Strongest vs. Peers 25 98% 124% 53% 66% 37% 38% 47% 207% 171% 94% 103% 59% 56% 59% 0% 50% 100% 150% 200% 250% RDC NE ATW SDRL DO ESV RIG Estimated Earnings Growth 2012( a) - 2014(e) 2012( a) - 2015(e) FactSet e stimates as of 8/2/2013 Expect further EPS growth in 2016+ whe
Slide 26: Positive Trends - Downtime, Out of Service Time
2.71% 3.37% 3.31% 3.93% 1.89% 1.65% 3.27% 2.47% 1.37% 0.80% Q1-11 Q2-11 Q3-11 Q4-11 Q1-12 Q2-12 Q3-12 Q4-12 Q1-13 Q2-13 Positive Trends - Downtime, Out of Service Time 25% 20% 27% 17% 11% 11% 14% 10% 9% 8% 12% Q1-11 Q2-11 Q3-11 Q4-11 Q1-12 Q2-12 Q3-12 Q4-12 Q1-13 Q2-13 Q3-13 Est Out of Service Opera
Slide 27: Investment Grade Balance Sheet
(in millions) Actual 06/30/2013 Projected 12/31/2013 Cash and available credit $1,756 $1,135 Total Debt $2,010 $2,009 Total Debt - to - Cap 30% 29% Net Debt - to - Cap 18% 25% 27 Investment Grade Balance Sheet (Baa3/BBB - ) Rowan Newbuild Capex With Four Drillships $ 590 MM $ 450 MM 2013 2014 2015 $
Slide 28: Rowan Focused On Optimum Allocation Of Capital
Rowan Focused On Optimum Allocation Of Capital • Return on investment analysis drives all capital decisions » Sensitivity analysis – Capital cost, Operating Cost, Day Rate, Tax Rate • Regular consideration of all options for available capital » Newbuilding , purchasing, investments in existing fleet
Slide 29: Rowan Traits Support Our Shared Goal
29 Rowan Traits Support Our Shared Goal 29 Commitment to safety and integrity Focused on reliability Competency and can do attitude Determination to continuously improve Highest Customer Satisfaction
Slide 30: FS 25) comm cearevine
FS 25) comm cearevine t ma
Slide 31: Appendix
Appendix 31
Slide 32: Multiple Factors Will Impact Operating Costs
Multiple Factors Will Impact Operating Costs Estimated Amount (in Millions) Gilbert Rowe in Service $10 - 15 Higher Expense Operating Areas $40 - 45 Shipyard Stays – Increase in Capitalized Expense ($5 – 10) Wage Increases (6% ) $10 - 15 Deepwater Support $10 - 15 Shorebase Expense Increases / Other
Slide 33: 2013 Operating Cost Components
2013 Operating Cost Components 63% 17% 4% 3% 3% 10% Employee-related * R&M Insurance Rig moves Rebillables All other ** 33 * Employee - related costs include labor, fringes, training, catering and crew transportation ** Other includes rentals, medics, agent commissions, satellite communications and
Slide 34: Current Rowan Avg. Regional Offshore Rig Operating Costs
Current Rowan Avg. Regional Offshore Rig Operating Costs Region Jack - ups Gulf of Mexico Low 40s – Low $50s Egypt Mid - High $60s Middle East Low $50s – low $70s U.K. North Sea Low $80s Norway North Sea Mid - High$150s Southeast Asia Mid $50s – Mid $60s Trinidad Mid – High $60s 34 (000’s per day) A
Slide 35: Glossary of Terms
Glossary of Terms Blowout Preventer (BOP): An emergency shut - off device comprised of a series, or “stack”, of valves that shut the wellbore in the event that hydrocarbons enter the wellbore and pressure containment is compromised. The BOP is intended to serve as a pressure control system of last r
Slide 36: Investor Contact
Investor Contact: Suzanne M. Spera Director, Investor Relations sspera@rowancompanies.com Rowan Companies 2800 Post Oak Blvd. Suite 5450 Houston, TX 77056 713.621.7800 www.rowancompanies.com