    RIO TINTO External Affairs Yelephone: +61 3 9283 3360 Facsimile: +61 3 9283 3216 10 September 2003 Company Announcements Office Australian Stock Exchange Limited SYDNEY NSW 2000 Dear Sir, The attached was presented by Rio Tinto Iron Ore to the financial community on adviser ~ Media & Publications At

  2. Slide 2: Rio Tinto Iron Ore Financial Community Visit

    RIO TINTO IRON ORE Financial Community Visit September 2003 Part 1 of 2

  3. Slide 3: Ian Bauert introduction and venue safety

    Rio Tinto Iron Ore RLO TINTEO lan Bauert Managing Director — New Business Rio Tinto lron Ore Financial Community Visit Wednesday 10: September: 2003 Venue safety 1. Fire alarms 2. Exits 3. Assembly point Financial Community Visit, September 2003

  4. Slide 4: Iron Ore - Strong contribution to Rio Tinto performance

    Rio Tinto Iron Ore Rio Tinto fron Ore - Strong contribution to Rio Tinto performance ‘Gross Tumover. Net earnings 4H 2003 = US$5.561m 4H 2008: = US$041m Mined: (Mt): Reserves {Mt} Resources (Mt): 2001: 2002 2004 2002 2004 2002 899° °904 2.617. 2)528 95957. 43;785: Rio Tinto fron Ore — Global positio

  5. Slide 5: Range of products and markets

    Rio Tinto Iron Ore Rio Tinto Iron Ore — Range of products and markets Rio Tinto iron Ore1H 2003 Sales = 63:4Mt Ma China 28% s % I, Other: Pellets’ G9), a S Korea ae 44% Rio Tinto Iron Ore — RIO Diverse assets delivering value TINTO Strength Marketieaderin China: High margin, Hanersley lon high volum

  6. Slide 6: Development projects

    Rio Tinto Iron Ore Rio Tinto Iron Ore — Development projects « Corumba, Brazil * Creeping capacity to 2Mtpa + by end 2004 * Sales to Europe have begun; after successful trials * Investigating expansion options to. 10Mtpa + « Simandou, Guinea »-Mining Convention signed giving 50 year tenure * Resourc

  7. Slide 7: Global context and first half 2003 highlights

    Rio Tinto Iron Ore Global context - 1H 2003 business conditions * Prices up - fines by.9% Million g and lump by 8.9% from April 03 aoe rE ae |. 7 tron ore exports up yoy mainly == driven by China ig. of Soaborces 480 if 150 » Australia 1p 16% » Brazilup 10% als, © China now world’s largest iron : or

  8. Slide 8: Iron Ore - 1H 2003 Meeting unprecedented demand

    Rio Tinto Iron Ore Rio Tinto lron Ore — 1H 2003 RIG Meeting unprecedented demand TINTO Performance Quarter Measure 2. O41 ee oF _ ooo 2008 2008 “Production | 27545 30733 43282| 56.402 640151 8% 21% Shipments | 28.267 29977 38,359] 53336) 11% 18% 22% Strong acceptance of West Angelas Marra Mamba ore:

  9. Slide 9: Market strength - Driven by China

    Rio Tinto Iron Ore Market strength — : RIC 1 Driven by China IINTO Seaborne traded iron ore by market 500: A5O AQ0: 250 China 309 @ Other Asia = 250 ( : wt Other 200 a 2 : : & Japan 450 : W Europe 400. 50 0 1985°:1987-4989"-4904:4993":4906: 1997: 4999-°2004 Seaborne Traded Ore 2002 = 474 Mt ni 4g So

  10. Slide 10: Strong outlook for Chinese demand

    Rio Tinto Iron Ore RLO Strong outlook for Chinese demand TINTO Chinese steel demand in the range of Domestic demand 275-300Mt by end of decade Key risks: / Domestic \ * Banking system steel demand * SOE reforms » Consumer confidence Steel intensity: Domestic production * Government spending The tisk

  11. Slide 11: China steel industry development

    Rio Tinto Iron Ore China steel industry development T a O Chinese stee! capacity forecast orld Steel Dynamics China iron ore imports @ Other Supply REO: Supply. 2002 By end of decade: (estimate) Chinese:domestic iron ore production constrained Assuming similar market share to 2062, expected growth i

  12. Slide 12: Expansion plans and purchasing practices changing

    Rio Tinto Iron Ore Brockman (+3Mipa -> 8Mipa) Eastern Range (+10Mipa > 10Mipa). Yandi= Stage:1-(+4Mipa->-24Mipa) Yandi-= Stage 2. (+10Mina:-> 34Mtpa): West Angglas (+5Mtna:—> 25Mipa) Rail Ports Dampier (+40Mipa -> 114Mipa). Cape - Stage: t:(:-> 55Mtpa): Cape - Stage 2 (+14Mipa -> 69Miipa) : : : RIO

  13. Slide 13: Improving efficiencies in the value chain

    Rio Tinto Iron Ore RIO Improving efficiencies in the value chain TINTO infand Chinese mill example FOB prite® Steaming Port: Port to plant: Plant, Screening! : Totat value unloading anloading =. handing chain Rio Tinto Iron Ore — Integration synergies Achieved + Formation of Pilbara Rail Company. =

  14. Slide 14: Operational safety and summary

    Rio Tinto Iron Ore Rio Tinto Iron Ore — RIO Operational safety TINTO RIO safety performance mate (CC s=— RTO combined Hi Robe SL semenes Higmelt 4999 = 2000) 2004 2002. 2003 Lost Time: trjury Frequency. Rate (UTIER) represents the number of lost-time Rio Tinto Iron Ore — Summary Expectations of sust

  15. Slide 15: Hamersley Iron - 100%

    Rio Tinto Iron Ore Hamersley Iron — 100% Dave Smith Managing Director Hamersley lron HI overview Resource/product capacity Expansion concept Operational review = Cost = Industial relations. on Safety. = Productivity Demurrage Financial Community Visit, September 2003 13

  16. Slide 16: Steady growth in Hamersley sales

    Rio Tinto Iron Ore Steady growth in Hamersley sales t oni Lominissexie Market strength - Growing sales to China 444-2003 sales:=-35:7Mt $: Korea 15%: Mi Europe: Taiwan 1% 6% includes 100% of all sales through joint ventures Financial Community Visit, September 2003 * Hamersley Iron has the capacity

  17. Slide 17: Sales volumes underpinned by joint ventures

    Rio Tinto Iron Ore Market Strength — Sales volumes underpinned by joint ventures Existing JVs provide Hi with a HI sales volume under long strategic advantage by. term contract (Mt) + Strenathening relationships with key customers: * Securing future market presence + Providing more efficient and clo

  18. Slide 18: Expansion program - Dampier Port operations

    Rio Tinto Iron Ore Expansion program — Dampier Port operations * Capacity. approx 74Mipa « Hamersley lron study into increasing capacity to 114Mipa in line with demand * Significant work at Dampier Port — second circuit at Parker Point * Concept for 74 to: 414Mipa well progressed; involving a duplic

  19. Slide 19: Rail expansion program

    Rio Tinto Iron Ore Rail expansion program Rail + Selective dual tracking of 125km required Dusl wecking tecured —« Tunkawanna to Cockatoo memmem Duplication nol required tunkawanna Expansion program - Yandicoogina (Yandi) Yandi start-up in 1999 at 15Mipa capacity e Expanded to 20Mipa in 2000 Increas

  20. Slide 20: Expansion program - Eastern Range under construction

    Rio Tinto Iron Ore Expansion program — Eastern Range under construction 54/46 JV with Baosteel agreed in 2002 Mine will average 10Mipa for 20 years JV. will take full range of Hamersley lron’s product Construction more than 50% complete Commissioning Q2 2004 Expansion program — Brockman * Brockman c

  21. Slide 21: Costs and productivity

    Rio Tinto Iron Ore Costs and productivity. Cost reduction program ees 49714=100 5 Target A$100m : Achieved A$80m in 3 years Tonnes produced per ~300.initatives across the : employee business + PRC + Procurement * Paraburdoo + Maintenance i Exceeded inflation JQ 72 74 76 78 80 82 84 Bb BB OO 92 94 96

  22. Slide 22: Significant improvement in safety performance

    Rio Tinto Iron Ore Significant improvement in safety performance 2000 2001 2002 2003 YTD. Hamersiey iron LTIFR Lost Time: trip cy-Rate (ETIER) represents the number of lost time: Environment and community AML- Environmental performance scores 4 Enviconresnital responsibility: ef 2000. 2: Conpnaunily

  23. Slide 23: Industrial relations

    Rio Tinto Iron Ore industrial relations No lost production due to industrial stoppages since 1993 Continue to employ on individual contracts: 90% on Australian Workplace Agreements 10% an Common Law contracts Recently negotiated a consensus federal award with Austratian Workers’ Union Award is a mod

  24. Slide 24: Hismelt - 100%

    Rio Tinto Iron Ore Hismelt — 100% Duncan Price Managing Director Hismelt Hismelt scale up strategy Full unit cost of iron Time u86-of considerable change in the risic profile representad'by.6 metre diameter plant, Jando be a isk free investment: Financial Community Visit, September 2003 22

  25. Slide 25: Why Hismelt?

    Rio Tinto Iron Ore Why Hismelt? Potential for reduction of costs through using Hismelt Eurond Brownfield) : USABrowotield) No cake or'sinfer plants of dioxias, furans: tars, phend SOx 90% lowest, NOx 20% lower CO; 20 to:80% fower Consums CAPEX {US $itpa} Is 120: OPEX (USSithin) Net value to the Hism

  26. Slide 26: Kwinana plant

    Rio Tinto Iron Ore Kwinana plant Project snapshot as at end July 2003 Safety LTis ie) Hrs worked » 500,000 Workforce. KCJV. 84 Hismelt ) Contractors 422 Progress Deconstruction 400% complete ‘Temp const facilities 160% complete Engineering 71% complete Total project $9% complete (planned 40%) Schedu

  27. Slide 27: The steel industry opportunity

    Rio Tinto Iron Ore The steel industry opportunity: Production costs * South Ames a i india tow-cost cLiGers due to access to raw nateriais: and: low: cost:labout: *Westere world ‘characterised by high operating o high V matetials and tabour USA & EU Sth Africa} Sth Am, fOr Fatios id: North Arn ping

  28. Slide 28: The steel industry opportunity: three distinct markets

    Rio Tinto Iron Ore The steel industry opportunity: Three distinct markets + China + Economic growth through infrastructure development + Steel sector growing based:on pig iron: and: BOF. «oHismelttor expansion and modern + Developed world + -Rationalisation due to lagging cost: competitiveness * “Re

  29. Slide 29: Key messages

    Rio Tinto Iron Ore Key messages . Kwinana Is on track ~ so far, so good. . Further development at Kwinana is only for product development and local optimisation. it will be performed in a modular, minimum risk manner. . The main game has begun. Each 6M Hismelt plant consumes 1.3Mt of iron ore fines

  30. Slide 30: Schedule of events

    Rio Tinto Iron Ore Rio Tinto fron Ore — Schedule of events DAY: 2. THURSDAY 11 SEPTEMBER 7:00am 8:00 am 9:15am 41:00am 12:00 pm 42:30: pm 2:45 pm 3:00:pm 416 pm Leave for Cape Lambert Cape Lambert presentation ‘Tour of Cape Lambert operation Leave tor Dampier Lunch Brief and tour of Dampier Port ope

  31. Slide 31: Paraburdoo Operations

    Rio Tinto lron Ore Paraburdoo Operations Hamersley Iron Pty Ltd A Meniber-of the Ric Tinto Group. Evacuation procedure Please observe the following rules during your visit + Always follow the advice of your tour guide. + Wear safety glasses and hard helmets when advised by your guide. ¢ Safety belts

  32. Slide 32: Hamersley Iron Rail System and Paraburdoo history

    Rio Tinto lron Ore Hamerstey Iron Rail System Dampier Rosati Siding 2 Marandoo : ona igjim | Yandi (HY) Brockman No.2 Cnttnevene dent toan a ane HY) P Htount Tom Prien f° Sesiun to Dampier Po, cs] Paraburdoo 1966 - Tom Price production begins August 1966 - first ship loaded at Dampier, Tachikawa Mar

  33. Slide 33: Greater Paraburdoo

    Rio Tinto Iron Ore Greater Paraburdoo >» Paraburdoo, Channar, Eastern Range (2004) « Total material mined 42Mt « High grade production 18Mt « Mobile fleet » 6 Loader Units and 12 Trucks * 350 employees on site « Paraburdoo is a residential site, supported by the township of Paraburdoo Financial Comm

  34. Slide 34: Commissioned in 1994

    Rio Tinto Iron Ore Commissioned in 1994 + Hydrocyclone improves quality by removing ultrafines and reducing impurities + up to 85% mass recovery +« Dewatering to reduce moisture acne Seaeoe nett ‘poses Financial Community Visit, September 2003

  35. Slide 35: Unincorporated joint venture with Baosteel

    Rio Tinto Iron Ore + Unincorporated joint venture with Baosteel to supply 200 Mt of Hamersley product over 20 years, averaging ~10Mtpa, using existing infrastructure * Hamersley lron will be responsible for the construction and operation of the joint venture * The initial capital investment was A$12

  36. Slide 36: Eastern Range construction scope

    Rio Tinto Iron Ore + At Eastern Range: Construction of primary and secondary crushing facility, together with dust suppression and dust collection * Ore Transfer: Construction of overland conveying facilities to enable transfer of ore from Eastern Range to Paraburdoo via the existing Channar conveyo

  37. Slide 37: lron Ore

    Rio Tinto lron Ore . st _ a oe en ee ’ canine! Seresaens 85 ipoies este 3 Financial Community Visit, September 2003

  38. Slide 38: Iron Ore

    Rio Tinto lron Ore Financial Community Visit, September 2003

  39. Slide 39: Robe River - 53% ownership structure

    Rio Tinto lron Ore Robe River — 53% Clive Latcham Managing Director Robe River Ownership structure — JV between diverse partners . Mitsul iron Ore Nippon Steel Development PA. Austratia PA. * Unincorporated joint venture = Global mining house = Global tradirig house — Customers Financial Community V

  40. Slide 40: Current operations

    Rio Tinto lron Ore Current operations assareone dy Morbie Bar © iia Bogie ‘West Angelas Mine Paraburdes.e Growth in tonnage and product range Robe River sales Financial Community Visit, September 2003

  41. Slide 41: Total sales of iron ore and safety

    Rio Tinto lron Ore Total sales of tron ore 1H 2003 Sales = 21. 1Mt China _& Korea 8% : 8% WiEurope: | 23% Safety — adopting best practice Robe River'safety performance: Behavioural based safety systems Safety reports through to the line Employees and contractors improved supervision and mgt ‘MarO4:

  42. Slide 42: Productivity enhancement

    Rio Tinto lron Ore Productivity enhancement No-of Employees Productivity: produced per: amploy 80,000: = AG.000. 30,000 OX OY: 10%. JOY: 1O¥: IY: 10%: Ox: $993.52 2003 $9885 49932003. (QBS A9B3: 2003 1O¥clran Ore-Year- which is: 1 Aprile 34 March Leverage operational strengths Low cost producer Repu

  43. Slide 43: Cost programs

    Rio Tinto lron Ore Cost programs Ongoing process for cost reduction ~ Internal targets, tight control of cosis ~ Costs at West Angelas higher than for Mesa J Focus on business planning and control = Reducing costs through improved planning ~ Prevention of failure and breakdown + Increased ability to

  44. Slide 44: West Angelas

    Rio Tinto lron Ore West Angelas * Open-pit mine, a crushing and screening plant, stockpiling, reclaiming and train load-out facilities + Enriched Marra Mamba iron formation — Reserves estimated at 455Mt in 2002 i ( Dp Meet demand growth — West Angelas Accelerated production ramp-up to meet full mark

  45. Slide 45: Mesa J operations

    Rio Tinto lron Ore Mesa J operations Mesa J located near the town of Pannawonica, 200km south-west of Cape Lambert port Mining commenced 1992 Mining below water table — Large percentage of reserves under water table - Blending to manage moisture variability Processing of ore through two process plan

  46. Slide 46: Cape Lambert and expansion program

    Rio Tinto lron Ore Cape Lambert Deepwater port facility Nominal capacity of 52Mipa Work commencing to “de-bottleneck’ the port, and thereby achieve nominal Cea rey Crushing and screening plant for Mesa J production Stockyard capacity of 8Mt Power station: Laboratory Port sharing a priority Expansion

  47. Slide 47: Cost performance

    Rio Tinto lron Ore Cost performance Unit cost performance Sustaining capital 2001 2002 2003. 2001 2002 2003 June: dune YTD. YTD. lndex:2001: #106: index 2001 =.40. ie Summary slide of key message Low cost operation Strong demand for Pisolite and Marra Mamba products Expansion phase — acceleration of

  48. Slide 48: West Angelas Operations location

    Rio Tinto Iron Ore Clive Latcham West Angelas Operations Managing Director : 2 Rohe River Sepiember 2003 Location « West Angelas located inland Pilbara « Open-pit mine, a crushing and screening plant, stockpiles, reclaiming and train joad-out facilities «Enriched Marra Mamba iron formation roducing

  49. Slide 49: Project performance

    Rio Tinto Iron Ore Project performance Robe JV participants agreed to develop West Angelas ore deposits in 1998 Agreement in 2001 to share rail infrastructure with Rio Tinto Mine completed in mid-2002 on budget and ahead of schedule + Estimated cost US$450m + Consistent mining from March 2002 Trial

  50. Slide 50: Current resource - major chemistry

    Rio Tinto Iron Ore Current resource — major chemistry West Angelas | West Angelas lron fron Ore Fines Ore Lump Element Compound Expect % Expect % fron (Fe) 61.88 62.74 Fe (caicined) 65.83 66.89 Silica (SiO2) 3.05 2.36 Alumina (Al203) 1.96 4.20 Phosphorous (P} 0.065 0.054 Sulphur (8) 0.022 0.015 Loss

  51. Slide 51: Site layout - Deposit A

    Rio Tinto Iron Ore Site layout — Deposit A an Mine blending Ore & Waste options in each pit + 2 Excavators in primary sources 2 Front-end loader for flexibility Single, or dual sourcing to crusher Financial Community Visit, September 2003

  52. Slide 52: produc

    Rio Tinto Iron Ore produc i As at 1/06/2002 4x 75,000t fines + 4 x 75,000t jump Stockpile grades modelled by SMS Sequential stacking & reclairning artes Financial Community Visit, September 2003

  53. Slide 53: Future development

    Rio Tinto fron Ore Future development * Demand for Marra Mamba is excellent = Ramp-up progressing well = Now considering future development options (where to after Deposit A) # Considering whether market demand justifies further expansion # Working with Pilbara Rail on rail capacity and future expan

  54. Slide 54: Next step - expansion to 25mtpa

    Rio Tinto fron Ore Next step - expansion to 25mtpa ® Approval from Rio Investment Committee # Extension to the stockyard # Further minor plant modifications # Further expansion to village and ancillary infrastructure # Currently assessing the rail implications of expanded West Angelas # Target rate

  55. Slide 55: Rio Tinto Iron Ore background and production history

    RIO TINTO IRON ORE Background Rio Tinto is a world leader in finding, developing, extracting and processing mineral resources. The Rio Tinto Iron Ore (RTIO) group includes Hamersley Iron which is whoily owned, a 53% interest in Robe River iron Associates and a 59% interest in lron Ore Company of Can

  56. Slide 56: Hamersley Iron

    HAMERSLEY IRON Location Hamersley Iron has six mines all located in the Hamersley Ranges of Western Australia. Five mines have train-loading facilities, and the Channar mine has an overland conveyor to the Paraburdoo operation. Ownership Mt Tom Price, Paraburdoo, Marandoo, Brockman (including Nammul

  57. Slide 57: Robe River Iron Associates

    ROBE RIVER IRON ASSOCIATES Location Robe River has two mines in the Pilbara region of WA. The Mesa J operations are located near Pannawonica, and West Angelas, which was commissioned in 2002, is 110 km west of Newman. Ownership Robe River is an unincorporated joint venture in which Rio Tinto has a 5

  58. Slide 58: Pilbara Rail Company

    PILBARA RAIL COMPANY Location The Pilbara Rail Company (PRC) currently rails iron ore from seven mines in the Pilbara region of Western Australia to four dumpers (two at the Dampier port and two at Cape Lambert port). Ownership PRC is a 50/50 joint venture between Rio Tinto Iron Ore and Robe River e

  59. Slide 59: Track

    Track e Total track length including yards is 868km (HI) and 316km (Robe) « Gauge: 1435mm (standard gauge) Haulage lengths - Yandicoogina to Dampier 447km - West Angelas to Lambert 420km - Paraburdoo to Dampier 386km - Marandoo to Dampier 306km - Tom Price to Dampier 291km - Brockman to Dampier 291k

  60. Slide 60: Hismelt Project, Kwinana

    HISMELT PROJECT, KWINANA Location Kwinana, south of Perth Western Australia. Ownership Wholly owned by Rio Tinto. Technology method The Hismelt process is a direct iron smelting technology that converts fine ores into high quality pig iron (96% iron ore content) without the use of coke ovens and sin

  61. Slide 61: Iron Ore Company of Canada

    IRON ORE COMPANY OF CANADA Location Labrador City, Newfoundland (mine, concentrator and pellet plant) Sept-lles, Quebec (currently idle pellet plant) Ownership Rio Tinto owns 58.7% of IOC. Other shareholders are Mitsubishi (26.2%) and Labrador Iron Ore Royalty Income Fund (15.1%). Reserves Tonnage G

  62. Slide 62: Rio Tinto Iron Ore financials

    RIO TINTS IRON ORE FINANCIALS - this information has been provided by Rio Tinto and is in the pubsic domain US dollars (million) Rio Tinto Gross tumover {a) EBITDA {b} Net Earnings fo) Capex (a) Depn & Amortn fe} Operating assets {fh Interest % _1HO3__4HO2_4HO3_1HOZ_1HO3_tHOZ 4HO3_tHOZ_ HOS HOZ HOS