  1. Slide 1: Boral Berrima Cement Community Meeting

    Build something great™ ® Boral Berrima Cement Community Meeting 5 March 2015

  2. Slide 2: Welcome and introductions

    ® Build something great™ Welcome and introductions Community meeting – Boral Berrima Cement 5 March 2015  Boral team present at today’s meeting:  Stuart Hutchings Operations Manager (NSW), Boral Cement  Rod Wallace Planning & Development Manager (NSW/ACT) Boral Property Group  Alex Wnorowski Env

  3. Slide 3: Agenda

    Build something great™ ® Agenda Community meeting – Boral Berrima Cement 5 March 2015  Previous meeting and apologies  Cement business and Cement Works general update  Fuelling the future – energy sources other than coal  Environment update  News from the Boral Berrima (Medway) Colliery  Gener

  4. Slide 4: Previous meeting & matters arising

    ® Build something great™ Previous meeting & matters arising Community meeting – Boral Berrima Cement 5 March 2015  Previous meeting  19 November 2014  NOTE: Presentations from previous meetings are available from the Cement Works’ website – www.boral.com.au/berrimacement  Any matters arising  A

  5. Slide 5: Operations Update

    Build something great™ ® Boral Berrima Cement Operations Update Stuart Hutchings – Operations Manager (NSW), Boral Cement

  6. Slide 6: Cement Works general update

    ® Build something great™ Cement Works general update Community meeting – Boral Berrima Cement 5 March 2015  Market and sales - Cement demand remains high at present, largely due to increased underlying construction activity and major projects. - The Barangaroo precinct on Sydney Harbour and Pacific

  7. Slide 7: Fuelling the Future - update

    ® Build something great™ Fuelling the Future - update Community meeting – Boral Berrima Cement 5 March 2015  Our proposal and the journey so far… - We are planning to integrate ‘waste-derived fuels’ with coal to provide our energy requirements for production at Berrima. - Waste-derived fuels will a

  8. Slide 8: Fuelling the Future – Modification

    ® Build something great™ Fuelling the Future – Modification 9 Community meeting – Boral Berrima Cement 5 March 2015  What is proposed? - use of Solid Waste Derived Fuel (SWDF) as an energy source (100 000 tpa); - Wood waste - Refuse Derived Fuel - Tyre chips (already approved) - changes to the air

  9. Slide 9: Storage and feeding system – plan view

    ® Build something great™ Fuelling the Future – Modification 9 Community meeting – Boral Berrima Cement 5 March 2015  Storage and feeding system – plan view 9

  10. Slide 10: Storage and feeding system – southern elevation

    ® Build something great™ Fuelling the Future – Modification 9 Community meeting – Boral Berrima Cement 5 March 2015  Storage and feeding system – southern elevation 10

  11. Slide 11: Storage and feeding system – western elevation

    ® Build something great™ Fuelling the Future – Modification 9 Community meeting – Boral Berrima Cement 5 March 2015  Storage and feeding system – western elevation 11

  12. Slide 12: Fuelling the Future – Air quality

    ® Build something great™ Fuelling the Future – Modification 9 Community meeting – Boral Berrima Cement 5 March 2015  Air quality - Air quality modelling confirms compliance with proposed stack limits Emission type Limit using Current limit Proposed limit coal ‘standard’ using ‘non using ‘non standa

  13. Slide 13: Fuelling the Future – Noise

    ® Build something great™ Fuelling the Future – Modification 9 Community meeting – Boral Berrima Cement 5 March 2015  Noise - Construction - Proposed hours: 7am and 6pm Monday to Friday and 8am to 1pm on Saturday - Not expected to exceed the daytime (standard construction hours) Laeq (15minute) nois

  14. Slide 14: Fuelling the Future – Traffic and transport

    ® Build something great™ Fuelling the Future – Modification 9 Community meeting – Boral Berrima Cement 5 March 2015  Traffic and transport - Minor increase in traffic due to lower calorific value and bulk density of solid waste fuels - The assessment indicates that the impacts to Taylor Avenue traf

  15. Slide 15: Fuelling the Future – Visual

    ® Build something great™ Fuelling the Future – Modification 9 Community meeting – Boral Berrima Cement 5 March 2015  Visual - Won’t be viewed from northern aspects - Minor visual impacts from the east and south - Plant colouring will be sympathetic to existing plant - Lighting will be designed to m

  16. Slide 16: Visual – view west from Berrima Road

    ® Build something great™ Fuelling the Future – Modification 9 Community meeting – Boral Berrima Cement 5 March 2015  Visual - View west from Berrima Road 16

  17. Slide 17: Visual – view north-east from Oldbury Road

    ® Build something great™ Fuelling the Future – Modification 9 Community meeting – Boral Berrima Cement 5 March 2015  Visual - View north-east from Oldbury Road 17

  18. Slide 18: Environmental Management & Performance

    Build something great™ ® Boral Berrima Cement Environmental Management & Performance Alex Wnorowski, Boral Cement Environment Manager

  19. Slide 19: Environmental Management – complaints received

    ® Build something great™ Environmental Management Community meeting – Boral Berrima Cement 5 March 2015 Complaints received at the Cement Works since last meeting Dust Noise Other Total Nov ’14 0 0 0 0 Dec ’14 0 0 0 0 Jan ’15 0 1 0 1 Feb ‘15 0 0 0 0 19

  20. Slide 20: Seasonal trendlines - dust

    ® Build something great™ Environmental Management Community meeting – Boral Berrima Cement 5 March 2015 Seasonal trendlines - dust 20

  21. Slide 21: Seasonal trendlines - noise

    ® Build something great™ Environmental Management Community meeting – Boral Berrima Cement 5 March 2015 Seasonal trendlines - noise 21

  22. Slide 22: Environmental Management

    ® Build something great™ Environmental Management Community meeting – Boral Berrima Cement 5 March 2015 22

  23. Slide 23: Fugitive Dust Monitoring

    ® Build something great™ Environmental Management Community meeting – Boral Berrima Cement 5 March 2015 Fugitive Dust Monitoring Locations of dust gauges and HVAS station 23

  24. Slide 24: Environmental Management

    ® Build something great™ Environmental Management Community meeting – Boral Berrima Cement 5 March 2015 24

  25. Slide 25: High Volume Air Sampler (HVAS)

    ® Build something great™ Environmental Management Community meeting – Boral Berrima Cement 5 March 2015  High Volume Air Sampler (HVAS) - Located in Berrima Rd – north east of plant - Measures Suspended Particulate (TSP) and small particles (PM10) - Samples are taken and analysed every six days by

  26. Slide 26: Environmental Management

    ® Build something great™ Environmental Management Community meeting – Boral Berrima Cement 5 March 2015 26

  27. Slide 27: Environmental Management

    ® Build something great™ Environmental Management Community meeting – Boral Berrima Cement 5 March 2015 27

  28. Slide 28: Environmental Management – EPA Quality Goals scale

    ® Build something great™ Environmental Management Community meeting – Boral Berrima Cement 5 March 2015 Same graph using a scale reflecting the lower-end EPA Quality Goals 28

  29. Slide 29: News from the Berrima (Medway) Colliery

    Build something great™ ® Boral Berrima Cement News from the Berrima (Medway) Colliery Rob Byrnes – Boral Berrima (Medway) Colliery

  30. Slide 30: News from the Berrima (Medway) Colliery

    ® Build something great™ News from the Berrima (Medway) Colliery Community meeting – Boral Berrima Cement 5 March 2015  Boral has now formally sought approval from the NSW Government to permanently close Berrima Colliery  The scope of the Final Closure Plan currently being finalised includes:  Pe

  31. Slide 31: General business

    Build something great™ ® Boral Berrima Cement General business Paul Jackson, Stakeholder Relations Manager (Southern Region), Boral Property Group Stuart Hutchings, Operations Manager (NSW), Boral Cement

  32. Slide 32: General business

    ® Build something great™ General business Community meeting – Boral Berrima Cement 5 March 2015  Items of general business  Next meeting  July-August 2015  Boral Berrima Cement Works contacts  Reception 4860 2222 or madeline.westnidge@boral.com.au  Paul Jackson – Stakeholder Relations Manager

  33. Slide 33: Thank you for your attendance

    ® THANK YOU FOR YOUR ATTENDANCE Build something great™ Boral Berrima Cement Works community meeting 5 March 2015 ®