Valeura Energy Inc. · TSX:VLE
Valeura Energy — Investor Presentation (November 2015)
68 slides from Valeura Energy's investor presentation, November 2015
Slide 1: Shifting Focus to 100% Owned & Operated Banarli Licences
A GLOBAL ENERGY COMPANY FOCUSED ON EXCEPTIONAL VALUE CREATION SHIFTING FOCUS TO 100% OWNED & OPERATED BANARLI LICENCES CORPORATE PRESENTATION NOVEMBER 2015
Slide 2: Corporate Profile
Corporate Profile Valeura Energy Inc. (VLE – TSX) is a Canada-based oil and gas company with assets in Turkey Interests in 22 leases & licences in Turkey: 0.9 MM acres (gross); 0.38 MM acres (net) (1) Pursuing development of conventional gas & tight gas in the Thrace Basin Utilizing latest 3
Slide 3: Capital Structure November 1, 2015
Capital Structure November 1, 2015 Basic shares outstanding at November 1, 2015 57,906,135 Common shares purchasable pursuant to outstanding: Financial warrants ($5.50 exercise price per share) 13,269,217 Options ($0.72 weighted average exercise price per share) 5,177,000 Fully diluted shares 76,352
Slide 4: Q3 2015 Financial & Operating Highlights
Q3 2015 Financial & Operating Highlights (1) 3 MONTHS 3 MONTHS 3 MONTHS RESULTS ENDED ENDED ENDED SEPT 30, 2015 JUNE 30, 2015 SEPT 30, 2014 Production Crude oil & NGLs (bbl/d) 7 8 7 Natural gas (Mcf/d) 4,723 6,219 5,943 boe/d 794 1,045 997 Financial (Canadian $ M, except per boe amounts) P & NG reve
Slide 5: Why Turkey?
Why Turkey? Prospective TBNG-PTI Proven petroleum systems TBNG-PTI acquisition Acquisition (natural gas & light/medium oil) Under-explored & under-exploited conventional & opportunity unconventional plays Opportunity to deploy modern technology Thrace Basin main gas producing region Anatol
Slide 6: Turkey YE 2014 Reserves (Company Gross)
Turkey YE 2014 Reserves (Company Gross) MMboe 5% and 9% year-over-year increase in 1P 14 Possible and 2P reserves, respectively, in Turkey Probable 12 Proved Primarily natural gas reserves in Thrace 10.3 10.4 3P Basin on TBNG JV lands (Valeura 40% WI) 10 and Edirne Licence (Valeura 35% WI) 8 G
Slide 7: Thrace Basin Land Position
Thrace Basin Land Position (1) Bulgaria 2010 Otto asset purchase (Edirne) Black Sea E17-b4-1 (Valeura 35% WI) E17-c1-1 E17-c2-1 Turkey 2013 Banarli licence award (Valeura 100% WI) 5122 3659 2926 F19- F18- F19- d4-2 F17- c1,c2,c3,c4 d1,d4 Greece c2,c3 F18- d1,d2, 3861 d4 F18- F18- F19- c4-2 c3-1 d4-1
Slide 8: Land Position In Turkey At November 1, 2015
Land Position In Turkey At November 1, 2015 LEASES & GROSS AREA VALEURA NET AREA TRANSACTION LICENCES (1) (acres) (acres) (#) THRACE BASIN TBNG JV - Onshore (2) 15 425,155 170,062 TBNG JV - Offshore - 116,508 17,476 Banarli Licence 5104 Award (3) 2 133,840 133,840 Otto - Edirne 3 49,883 17,459 SUB T
Slide 9: TBNG JV (Valeura 40% WI - Non-Operated) – The Proving Ground
TBNG JV (Valeura 40% WI - Non-Operated) – “The Proving Ground” I-8 Rig Drilling at TDR-9 9
Slide 10: TBNG JV
TBNG JV Interests in 15 leases & licences in Thrace Basin (0.51 MM gross acres onshore) Well established shallow gas production and marketing business: - ~65 producing wells (gross) in 15 gas fields in onshore lands - Owned compression facilities & distribution lines - Direct sales to 55 commerc
Slide 11: TBNG JV Shallow Gas & Tight Gas Plays
TBNG JV Shallow Gas & Tight Gas Plays SHALLOW GAS Akcahalil-1 Inecik- Aydede-1 YAGCI-8 ND-1 TDR-2 TS-18 DTD-1 KAYI-7 BATI GAZI-1 BATI Danismen & Osmancik 2 KARAEVLI-1 SOUTHWEST NORTHEAST 5 re-entry fracs since DANISMEN mid-2011 (Osmancik) 62 workovers & 17 new 500 m OSMANCIK drills in 2012-201
Slide 12: Thrace Basin Tight Gas Learning Curve 2011 – 2015 YTD
Thrace Basin Tight Gas Learning Curve 2011 – 2015 YTD 3 OSMANLI THRACE BASIN Cumulative Exploration DISCOVERIES Program capex (1) ≈ $74MM (net) Horizontal Drills 6 Hz MEZ/TES/KESAN DRILL & FRACS & Fracs Vertical Drills & Develop 12 VERTICAL TESLIMKOY/KESAN DRILL & FRACS Fracs 232KM2 3D Studies 413KM
Slide 13: Tekirdag Area Frac Results & Potential Vertical Well Development
Tekirdag Area 2011-2015 YTD Mezardere/Teslimkoy/Kesan Frac Results & Potential Vertical Well Development (1) KAYI-14 Guney Kayi-1 Kayi Derin-1 KAYI-7 5.0 MMcf/d 1.8 MMcf/d 0.7 MMcf/d 3.4 MMcf/d KAYI-12 KAYI-14 1.6 MMcf/d 5.4 MMcf/d TDR-2 TDR-5H KAYI-6 KAYI-16 0.6 MMcf/d 2.0 MMcf/d 0.9 MMcf/d 0.9 MMc
Slide 14: Mezardere Slope Fan Play Fairway
Mezardere Slope Fan Play Fairway Mezardere Prospective Depth Structure Mezardere play fairway Banarli Tekirdag Tekirdag area Mezardere exploitation program 10 km Slope fan play in Mezardere Formation showing encouraging results Seismic imaging clearly shows channel trends with both structural &
Slide 15: Banarli (Valeura 100% WI - Operated)
Banarli (Valeura 100% WI - Operated) – “Opportunity to Leverage Four+ Years of Learnings” 3D Seismic Acquisition on Banarli – May 2015 15
Slide 16: Banarli Exploration Strategy
Banarli Exploration Strategy Banarli licence awarded to Valeura (100% WI) in April 2013 (480 km2; 185 square miles) Converted to two licences under New Petroleum Law, which extends initial 5-year term to June 27, 2020: – US$9.2 MM commitment: 2,000 m well year 1; 2,000 m well year 2; 3,800 m wel
Slide 17: TBNG JV Producing Fields & Banarli Exploration Prospects
TBNG JV Producing Fields & Banarli Exploration Prospects Banarli Banarli Banarli licences F18-C F19-d1,d4 Producing fields (1) Banarli prospects Merged Banarli, Tekirdag & Osmanli 3D seismic (~550 Muratli km2) similarity imaging 5 km Aydinkoy Yayli-1 Bati Gurgen-1 Planned Drilling Gurgen 2P: 5.3 Bcf
Slide 18: Osmancik Prospect Map (Play Types 1 and 2)
Osmancik Prospect Map (Play Types 1 and 2) Osmancik B PSTM Time Structure P10 Prospect Areas (1) MURATLI PROSPECT AYDINKOY PROSPECT YAYLI PROSPECTS BATI GURGEN YAYLI-1 PROSPECT PLANNED BATI GURGEN-1 MAIN DRILLING OSMANLI GAS FIELD GURGEN PRODUCING FIELD (1) Internal estimate. 18
Slide 19: Mezardere Prospect Map (Play Type 3)
Mezardere Prospect Map (Play Type 3) Tekirdag D PSTM Time Structure P10 Prospect Areas (1) MURATLI PROSPECT AYDINKOY PROSPECT YAYLI PROSPECTS BATI GURGEN YAYLI-1 PROSPECT PLANNED BATI GURGEN-1 DRILLING MAIN OSMANLI GAS FIELD GURGEN PRODUCING FIELD (1) Internal estimate. 19
Slide 20: Potential Basin-Centered Gas Play Fairway (Play Type 5)
Potential Basin-Centered Gas Play Fairway (Play Type 5) 10 km Mezardere Depth Structure Alacaoglu-1 CI 100m 0.73 psi/ft Potential Pressure Seal Area Hayrabolu-10 Ergene-1 1,500 km2 0.75 psi/ft 0.68 psi/ft Kazanci-5 0.77 psi/ft Kandamis-1 0.77 psi/ft Kayi Derin-1 0.43 psi/ft Pressure Normal Pressure
Slide 21: Robust Netbacks & Competitive Costs Drive Attractive Natural Gas Economics
Robust Netbacks & Competitive Costs Drive Attractive Natural Gas Economics in Turkey Cost Structure – US$MM (gross) FUTURE Operating Netbacks – $/boe (1) CURRENT POTENTIAL 80 CONVENTIONAL GAS VERTICAL WELL (2) Royalty Drill & Case 1.7 1.7 Opex 70 Tie-in (new facilities) 0.5 0.5 Netback 62.00 61.54 5
Slide 22: Turkey Natural Gas Indicative Well Economics
Turkey Natural Gas Indicative Well Economics (1) PHYSICAL PARAMETERS PER WELL ECONOMICS PER WELL – BEFORE TAX (5) PROGRAM RESERVES (2) IP30 (3) CAPEX (4) IRR PAYOUT NPV10 RECYCLE (Bcf) (MMcf/d) (US$MM) (%) (MONTHS) (US$MM) RATIO (6) Thrace Basin - Gas Shallow Gas Drilling (500 m) with Tie-in 0.3 0.8
Slide 23: Turkey Net Capital Budget Outlook 2015
Turkey Net Capital Budget Outlook 2015 (1) 2015 work program and budget targeting to: − Achieve 2015 net sales from the TBNG JV lands of 900 – 950 boe/d − Banarli: acquire 152 km2 of 3D seismic and spud two exploration wells in Q4 2015 (satisfies two of three commitment wells required in five-year
Slide 24: Summary
Summary Valeura provides exposure to a natural gas-focused, pure play in Turkey: $9-10/Mcf natural gas prices, 12.5% government royalty & >$40/boe operating netbacks Large land position of 0.9 MM acres (gross); 0.38 MM acres (net) Applying latest 3D seismic, horizontal drilling and multi-stage
Slide 25: Reader Advisories
Reader Advisories Forward-Looking Statements: This presentation contains certain forward-looking statements and forward-looking information (collectively, "forward-looking statements") as defined by applicable securities legislation including, but not limited to: Valeura’s 2015 work program and budg
Slide 26: Reader Advisories (Cont’d)
Reader Advisories (Cont’d) Other Advisories: INITIAL ON-STREAM PRODUCTION RATES: The initial on-stream production rates disclosed in this presentation are preliminary in nature and may not be indicative of stabilized on- stream production rates. Initial on-stream production rates are typically discl
Slide 27: Reader Advisories (Cont’d)
Reader Advisories (Cont’d) Glossary: Certain other terms used in this presentation but not defined herein or under "RESERVES DEFINITIONS" below are defined in NI 51-101 or Valeura’s most recent annual information form and, unless the context otherwise requires, shall have the same meanings herein as
Slide 28: Reader Advisories (Cont’d)
Reader Advisories (Cont’d) Abbreviations: Oil and Natural Gas Liquids Natural Gas bbl barrels Mcf thousand cubic feet bbl/d barrels per day Mcf/d thousand cubic feet per day NGLs natural gas liquids MMcf/d million cubic feet per day Bcf billion cubic feet Other boe barrels of oil equivalent m metres
Slide 29: Supplementary Information
A GLOBAL ENERGY COMPANY FOCUSED ON EXCEPTIONAL VALUE CREATION SUPPLEMENTARY INFORMATION
Slide 30: Our Heritage
Our Heritage Senior Management Board of Directors 30
Slide 31: Past Successes of Management & Board
Past Successes of Management & Board Sold 2009 $360 mm Market Cap 3x ROI (’04-’09) ~$529 mm CAGR 22% Market Cap at Trust Conversion Sold in 2007 $916 mm $898 mm 35x ROI (‘94-’03) 6x ROI (’05-’07) CAGR 51% CAGR 118% Sold in 2006 Market Cap $306 mm ~$4,412 mm 1.4x ROI (’03-’06) CAGR 10% Sold in 2004 $
Slide 32: Organization Structure
Organization Structure BOARD OF DIRECTORS Abby Badwi Tim Marchant Bill Fanagan Jim McFarland Claudio Ghersinich Ron Royal Stephanie Stimpson, Corporate Secretary PRESIDENT & CEO ASSISTANT Jim McFarland Shari Lemon VP VP VP VP CFO BUSINESS ENGINEERING OPERATIONS EXPLORATION DEVELOPMENT Steve Bjornson
Slide 33: Officers
Officers President & CEO: Jim McFarland, P. Eng. 43 years oil & gas experience Former President & CEO, director and co-founder, Verenex Energy (Libya light oil) Former Managing Director, Southern Pacific Petroleum (Australian shale oil) Former President & COO, Husky Oil (heavy oil, upgrading)
Slide 34: Officers (Cont’d)
Officers (Cont’d) VP Engineering: Don Shepherd, P. Eng. 41 years oil & gas experience Former General Manager, Verenex Energy Area 47 Libya based in Tripoli 13 years with Saudi Aramco as Asset Management Team Leader and Senior Engineering Specialist (Saudi Arabia) 12 years in executive manageme
Slide 35: Other Vice Presidents
Other Vice Presidents VP Business Development: Barry Wihak, P. Geol. 32 years oil & gas experience Former President & CEO, director and co-founder, Cangea Energy (private, Colombia focus) 5 years with Vermilion Energy Trust as Business Development Advisor on acquisitions in France, Netherlands a
Slide 36: Manager
Manager Country Representative (Ankara, Turkey): Mehmet Ekinalan 8 years oil & gas experience Former Resident Representative of Thrace Basin Natural Gas Turkiye Corporation 21 years telecommunications experience (Turkey and USA) Former CEO and Board member of Turkish Telecom Former CEO of AYCE
Slide 37: Board of Directors
Board of Directors Abby Badwi, P. Geol. Vice-Chairman, Bankers Petroleum Ltd. Executive Chairman, Americas Petrogas Inc. Former President & CEO, Bankers Petroleum Ltd. Geological background Bill Fanagan, CA (Chair) Former Chairman, Verenex Energy Inc. Former President & CEO, Gulf Indonesia Resources
Slide 38: Turkey YE 2014 Reserves (Company Gross)
Turkey YE 2014 Reserves (Company Gross) TOTAL OIL LIGHT & MEDIUM NATURAL GAS NPV10 BEFORE TAX NPV10 AFTER TAX CATEGORY EQUIVALENT OIL (Mbbl) (Bcf) (US$MM) (US$MM) (Mboe) PROVED DEVELOPED 7 3.8 639 19.1 19.1 PRODUCING PROVED DEVELOPED NON- 36 2.5 448 8.5 7.4 PRODUCING PROVED 36 3.7 651 6.4 4.9 UNDEVE
Slide 39: TBNG JV Shallow Gas Business
TBNG JV Shallow Gas Business 2013 shallow gas program: − Spudded 1 new drill (evaluating) − Completed 14 workovers (11.0 MMcf/d aggregate initial 7-day rate); 3 well re-entry fracs − Acquired 232 km2 of new 3D seismic in Osmanli area 2014 shallow gas program: − Spudded 1 sidetrack & 5 new drills
Slide 40: Osmanli Area Conventional Gas Drilling
Osmanli Area Conventional Gas Drilling Banarli Merged Osmanli & Tekirdag 3D seismic Gurgen-1 area Osmanli Gurgen-2 Gurgen-3 Dogu Guney Osmanli-1 Osmanli-3 Tavanli-1 Karaevli Kayi Gazi Recent drills Biyikali-2 ST Tekirdag Osmancik D Depth Structure Yagci 5 km Seven (gross) conventional gas wells dr
Slide 41: TBNG JV Tight Gas Proof-Of-Concept Program Phases
TBNG JV Tight Gas Proof-Of-Concept Program Phases 1. Recompletion fracs (750-2,000 m depth) − Identify gas bearing zones in Mezardere, Teslimkoy & Kesan formations that require fracs to achieve commercial rates focusing initially on areas within structural closure − Initiated new Mezardere laminated
Slide 42: Teslimkoy/Kesan Multi Frac Type Curves (Vertical Wells)
Teslimkoy/Kesan Multi Frac Type Curves (Vertical Wells) (1)(2) Type Curve - Vertical Wells 1200 120 D&M Vertical Well, 2P - 0.8 Bcf, Rate vs. Time 1100 1000 D&M Vertical Well, 2P - 0.8 Bcf, Cum. Recovery vs. Time 100 900 CUMMULATIVE RECOVERY - % OF EUR 800 80 PRODUCTION RATE - Mcf/d 700 600 60 500 4
Slide 43: Mezardere Multi Frac Type Curve (Horizontal Wells)
Mezardere Multi Frac Type Curve (Horizontal Wells) (1)(2) Type Curve Comparisons - Horizontal Wells 3000 120 2500 100 CUMMULATIVE RECOVERY - % OF EUR 2000 80 PRODUCTION RATE - Mcf/d VLE HZ Type #2, Reserves - 1.0 Bcf, Rate vs. Time 1500 60 D&M Teslimkoy Hz, 2P - 1.35 Bcf, Rate vs. Time VLE HZ Type #
Slide 44: Tekirdag Area Horizontal Drilling
Tekirdag Area Horizontal Drilling 2nd HZ well BTD-4H 1st HZ well DTD-19H Teslimkoy U. Kesan 655 m lateral 425 m lateral 10-stage frac 7-stage frac IP30 rate 3.0 MMcf/d IP30 rate 0.4 MMcf/d 5th HZ well TDR-11H Mezardere TDR-14 678 m lateral DTD-6 10-stage frac Baglik-1 BTD-5 IP30 rate 1.3 MMcf/d DTD-
Slide 45: TBNG JV 2011 Frac Results
TBNG JV 2011 Frac Results PEAK 24-HOUR INITIAL 7-DAY CUMULATIVE FRAC DATE NET PAY (1) POROSITY (1) ON-STREAM AVERAGE IP30 RATE PRODUCTION TO WELL (d/m/y) (m) (%) RATE ON-STREAM RATE (MMcf/d) OCT 31, 2015 (MMcf/d) (MMcf/d) (MMcf) Yazir-2; 1st stage 18/07/2011 2 10 0.1 0.1 - 3 (2) Yazir-2; 2nd stage 1
Slide 46: TBNG JV 2012 Frac Results
TBNG JV 2012 Frac Results INITIAL 7-DAY CUMULATIVE PEAK 24-HOUR FRAC DATE NET PAY (1) POROSITY (1) AVERAGE IP30 RATE PRODUCTION TO WELL ON-STREAM RATE (d/m/y) (m) (%) ON-STREAM RATE (MMcf/d) OCT 31, 2015 (MMcf/d) (MMcf/d) (MMcf) DTD-11 7/01/2012 3 13 1.1 0.8 0.6 117 Karya Derin-1 (2) 4/02/2012 11 14
Slide 47: TBNG JV 2012 Frac Results (Cont’d)
TBNG JV 2012 Frac Results (Cont’d) INITIAL 7-DAY CUMULATIVE PEAK 24-HOUR FRAC DATE NET PAY (1) POROSITY (1) AVERAGE IP30 RATE PRODUCTION TO WELL ON-STREAM RATE (d/m/y) (m) (%) ON-STREAM RATE (MMcf/d) OCT 31, 2015 (MMcf/d) (MMcf/d) (MMcf) Sulemaniye-2 (2) 9/05/2012 1 10 0.3 NA NA NA Dogu Karya-1 (3)
Slide 48: TBNG JV 2013 Frac Results
TBNG JV 2013 Frac Results INITIAL 7-DAY CUMULATIVE PEAK 24-HOUR FRAC DATE NET PAY (1) POROSITY (1) AVERAGE IP30 RATE PRODUCTION TO WELL ON-STREAM RATE (d/m/y) (m) (%) ON-STREAM RATE (MMcf/d) OCT 31, 2015 (MMcf/d) (MMcf/d) (MMcf) Baglik-1 (L. Kesan) (2) 8/01/2013 NA NA NA NA NA NA Kazanci-5 (1st stag
Slide 49: TBNG JV 2013 Frac Results (Cont’d)
TBNG JV 2013 Frac Results (Cont’d) INITIAL 7-DAY CUMULATIVE PEAK 24-HOUR FRAC DATE NET PAY (1) POROSITY (1) AVERAGE IP30 RATE PRODUCTION TO WELL ON-STREAM RATE (d/m/y) (m) (%) ON-STREAM RATE (MMcf/d) OCT 31, 2015 (MMcf/d) (MMcf/d) (MMcf) Karanfiltepe-6 (2) (L. Osmancik) 12/07/2013 NA NA NA NA NA NA
Slide 50: TBNG JV 2013 Frac Results (Cont’d)
TBNG JV 2013 Frac Results (Cont’d) INITIAL 7-DAY CUMULATIVE PEAK 24-HOUR FRAC DATE NET PAY (1) POROSITY (1) AVERAGE IP30 RATE PRODUCTION TO WELL ON-STREAM RATE (d/m/y) (m) (%) ON-STREAM RATE (MMcf/d) OCT 31, 2015 (MMcf/d) (MMcf/d) (MMcf) Yagci-6 (Mezardere) 07/10/2013 9 11 0.5 0.2 0.2 8 Kayi-14 (Mez
Slide 51: TBNG JV 2014 Frac Results
TBNG JV 2014 Frac Results INITIAL 7-DAY CUMULATIVE PEAK 24-HOUR FRAC DATE NET PAY (1) POROSITY (1) AVERAGE IP30 RATE PRODUCTION TO WELL ON-STREAM RATE (d/m/y) (m) (%) ON-STREAM RATE (MMcf/d) OCT 31, 2015 (MMcf/d) (MMcf/d) (MMcf) Kayi-16 (2-stage) (Mezardere/Teslimkoy) 22/01/2014 20 17 0.2 0.2 0.1 8
Slide 52: TBNG JV New Drill Spuds In 2012 - 2015 YTD
TBNG JV New Drill Spuds In 2012 - 2015 YTD Hayrabolu Hayrabolu-10 Kazanci-5 Deep Exploration Kuzey Atakoy-1 Area Guney Atakoy-2 Guney Karababa-1 Karanfiltepe-5, 6 Atakoy-8 Biyikali-2ST Tavanli-1 Gurgen-1,2,3 TSK-1, 2 Guney Kayi-1 Guney Osmanli-3 Kayi Derin-1 Dogu Osmanli-1 Osmanli DTD-19, 19H New Di
Slide 53: TBNG JV New Drill Spuds In 2012
TBNG JV New Drill Spuds In 2012 SPUD RIG RELEASE TD STATUS WELL LICENCE WELL TYPE (d/m/y) (d/m/y) (m) NOVEMBER 1, 2015 Baglik-1 3931 10/03/2012 06/05/2012 Unconventional 3,594 Producing Dogu Karya-1 3934 04/04/2012 23/04/2012 Unconventional 2,022 Evaluating TSK-1 3931 05/04/2012 10/04/2012 Conventio
Slide 54: TBNG JV New Drill Spuds 2013 - 2015 YTD
TBNG JV New Drill Spuds 2013 - 2015 YTD SPUD RIG RELEASE TD STATUS WELL LICENCE WELL TYPE (d/m/y) (d/m/y) (m) NOVEMBER 1, 2015 TDR-14 3931 29/01/2013 22/02/2013 Unconventional 1,749 Producing Hayrabolu-10 2926 08/02/2013 10/04/2013 Unconventional 4,054 Evaluating Unconventional - 1,626 MD DTD-19H 39
Slide 55: DTD-19H Horizontal – Upper Kesan Reservoir
DTD-19H Horizontal – Upper Kesan Reservoir Upper Kesan reservoir horizon (Baglik-1 producing zone) TD @ 1626 m MD Spud June 3, 2013 (34 drill @1096 m TVD @ -976 m SSTVD days) 1,096 m TVD; 1,626 m MD GR Mud gas 425 m horizontal leg show Total 209 m of sand LP @ 1201.15 m MD 7-stage frac P
Slide 56: BTD-4H Horizontal - Teslimkoy Reservoir
BTD-4H Horizontal - Teslimkoy Reservoir Teslimkoy BTD-2 producing zone Spud July 27, 2013 (36 drill days) 1,004 m TVD; 1,774 m MD 655 m horizontal leg Total 308 m of sand 10-stage frac Packers Plus assembly 5,815 bbls X-linked gel; 4% Landing point: 1,119 m KCL water energized with 40-
Slide 57: BTD-5H Horizontal - Teslimkoy Reservoir
BTD-5H Horizontal - Teslimkoy Reservoir Teslimkoy BTD-2 producing zone Spud Nov 19, 2013 (15 drill days) 974 m TVD; 1,519 m MD 403 m horizontal leg Total 89 m of sand 4-stage frac Packers Plus assembly (3 fracs completed) 583 bbls X-linked gel; 2% KCL water energized with 42-59% N2 Lat
Slide 58: BTD-2H Horizontal - Mezardere Reservoir
BTD-2H Horizontal - Mezardere Reservoir Mezardere DTD-6 producing zone Spud February 3, 2014 (13 drill BTD-2 DTD-6 days) 635 m TVD; 1,246 m MD Lateral section: 476 m Total sand encountered: 242 m 8-stage frac Packers Plus assembly Lateral section: 476m 3,420 bbls X-linked gel; 2% KCL w
Slide 59: TDR-11H Horizontal - Mezardere Reservoir
TDR-11H Horizontal - Mezardere Reservoir Mezardere TS-18 producing zone Spud February 20, 2014 (11 drill days) 518 m TVD; 1,291 m MD Lateral section: 678 m Total sand encountered: 394 m 10-stage frac Packers Plus assembly 4,754 bbls X-linked gel; 2% KCL Lateral section: 678 m water ene
Slide 60: TDR-5H1 Horizontal - Teslimkoy Reservoir
TDR-5H1 Horizontal - Teslimkoy Reservoir Teslimkoy C producing zone Spud July 28, 2014 (12 drill TDR-5 TDR-5H days) 991 m TVD; 1,698 m MD Lateral section: 569 m Total sand encountered: 35 m Total silt encountered: 103 m 8-stage frac Packers Plus assembly Landing Point: 1,129m Lateral s
Slide 61: Mezardere Slope Fan Model
Mezardere Slope Fan Model Mezardere consists of a north-easterly pro- grading slope fan complex, deposited within delta front and pro-delta setting Potential reservoirs include: − Porous channel and basin floor sands − Interlaminated sands and shales from channel abandonment, overbank, distal ap
Slide 62: Recent Osmancik & Mezardere Results & Potential Extension into Banarli
Recent Osmancik & Mezardere Results & Potential Extension of Play Types into Banarli Potential Pressure Seal Hayrabolu-10 Banarli 2015 3D: 152 km2 Gurgen-1 IP30: 3.3 MMcf/d (Osm) Gurgen-2 Yayli-1 Bati Gurgen-1 IP30: 3.3 MMcf/d (Osm) planned drilling Gurgen-3 IP(30): 1.1 MMcf/d (Osm) Dogu Osmanli-1 C
Slide 63: Thrace Basin Seismic
Thrace Basin Seismic 10 km 2015 Banarli 3D (152 km2) Drilling on 2D seismic only prior to 2012 2013 Osmanli 3D (232 km2) 2011 & 2013 3D seismic (645 km2) guiding TBNG 2011 Tekirdag/Hayrabolu 3D (413 km2) JV drilling since early 2012 2013 Banarli 2D (92.5 km) Valeura funded 2013 2D seismic on B
Slide 64: Gaziantep Licences– Alibey-1 Horizontal
Gaziantep Licences– Alibey-1 Horizontal 152,111 gross acres (Valeura 26% WI) in Anatolian Basin N39-a1 Operated by TransAtlantic New Licence Areas Alibey-1 Hz drilled in July 2012 as 414 m horizontal side-track in original Alibey-1 vertical well, N39-a4 which flowed heavy oil from the Old Lice
Slide 65: Turkey Natural Gas Infrastructure
Turkey Natural Gas Infrastructure 65
Slide 66: Turkey Oil Infrastructure
Turkey Oil Infrastructure 66
Slide 67: Thrace Basin Turkey – Stratigraphic Column
Thrace Basin Turkey – Stratigraphic Column Tertiary basin 9,000 m of tertiary age sediments Depositional environment − Deltaic sands − Turbidite sands − Reef development on Paleozoic highs Key reservoirs − Danismen - gas − Osmancik – gas − Mezardere - gas − Ceylan – gas − Sogucak – oil − Ham
Slide 68: SE Turkey – Stratigraphic Column
SE Turkey – Stratigraphic Column Reservoirs Sinan/Garzan reefs (Tertiary/Upper Cretaceous) Karabogaz & Mardin (Mid Cretaceous) Bedinan (Ordovician) Source Rocks Karabogaz (Cretaceous) Dadas (Silurian) Seals Germav (Upper Cretaceous) Dadas (Silurian) Play Types Structural - Reverse an
Valeura Energy — Investor Presentation (November 2015) on 6ix