Black Iron Inc. · TSX:BKI

Black Iron — Investor Presentation (May 2015)

28 slides from Black Iron's investor presentation, May 2015

  1. Slide 1: A Compelling Iron Ore Investment Opportunity

    A Compelling Iron Ore Investment Opportunity Corporate Presentation May 2015 TSX: BKI

  2. Slide 2: Disclaimer: Forward Looking Statement

    Disclaimer Forward Looking Statement TSX: BKI This Presentation contains ‘‘forward-looking information’’ within the meaning of applicable Canadian securities legislation. Forward-looking information is based on what management believes to be reasonable assumptions, opinions and estimates of the date

  3. Slide 3: What Sets Black Iron Apart?

    What Sets Black Iron Apart? Access to Skilled Labour & Existing Infrastructure – Two of the Most Challenging Iron Ore Project Development Risks TSX: BKI Key Development Risks Taxes/Royalties Human Resources Canada Ukraine Access to Infrastructure Community Opposition Licensing/Permitting Access to W

  4. Slide 4: Black Iron has ALL the Key Fundamentals for a Successful Low Cost Project

    Black Iron has ALL the Key Fundamentals for a Successful Low Cost Project in Place TSX: BKI Exceptional Sizeable Infrastructure Resource • Significant infrastructure • Large NI 43-101 Compliant advantages (power, rail Resource* at Flagship and port) with confirmed Shymanivske access and capacity - 6

  5. Slide 5: A Track Record of Iron Ore Success

    A Track Record of Iron Ore Success with Rio Tinto’s Iron Ore Company of Canada, and Ferrexpo TSX: BKI Key Management Board of Directors Matt Simpson – President & CEO Bruce Humphrey – Chairman • Former General Manager, Mining for Rio Tinto’s Iron • Former Chief Operating Officer of Goldcorp Ore Comp

  6. Slide 6: Major Local Development Partner: Metinvest

    Major Local Development Partner: Metinvest Ukraine’s Largest Company and a Global Iron Ore & Steel Producer TSX: BKI • Over 100,000 employees; Generated US$12.8 billion of revenues and a 18% EBITDA margin in 2013 • Metinvest is owned by System Capital Management (SCM) and Smart Holding • SCM has ove

  7. Slide 7: Sound Capital Structure

    Sound Capital Structure Attractive Valuation with Substantial Upside & Funding Support TSX: BKI Capital Structure (TSX: BKI) Corporate Structure Shares Outstanding 161.1 million Stock Options(1) 9.9 million Black Iron Inc. Metinvest B.V. Warrants (2) 20.6 million (TSX: BKI) (Ukraine private) Fully D

  8. Slide 8: Deposits In Mining Friendly Region

    Deposits In Mining Friendly Region Adjacent to existing Iron Ore Producers TSX: BKI ArcelorMittal’s Kryvyi Rih Iron Ore Complex • Two mining and exploration permits Black Iron’s covering 5.92 km2 Shymanivske − Mining permit at Shymanivske, which Project* M&I: 646Mt @ 31.6% has been extensively explo

  9. Slide 9: Large Ore Deposit with Growth Potential

    Large Ore Deposit with Growth Potential TSX: BKI • Banded iron formation consisting primarily of Tonnage Fe Tot Fe Mag Shymanivske magnetite with some hematite (Mt) (%) (%) − Iron band thickness ranges from 40-80 m Proven 312.9 31.1 19.5 − Only 9.7-21.2 m of overburden with a strip ratio of 1.63:1,

  10. Slide 10: Potential Resource Extension at Shymanivske

    Potential Resource Extension at Shymanivske Ground Gravity Shows Iron Ore Mineralization at North End TSX: BKI Potential resource • Ground gravity and magnetic surveys upside to be drilled show potential extension of iron ore mineralization at North end of property as circled in red Property • This

  11. Slide 11: Extensive Pit Shell Design and 3D Model Completed

    Extensive Pit Shell Design and 3D Model Completed (Property Overview) TSX: BKI 11 * Bankable Feasibility Study complete by Lycopodium Minerals Canada Ltd.

  12. Slide 12: Concentrator Footprint Compressed by Staggering HPGRs and Stacking LIMS

    Concentrator Footprint Compressed by Staggering HPGRs and Stacking LIMS TSX: BKI 12 * Bankable Feasibility Study complete by Lycopodium Minerals Canada Ltd.

  13. Slide 13: Producing High Quality Iron Ore Products

    Conventional Flowsheet Producing High Quality Iron Ore Products TSX: BKI B.F. Concentrate B.F. Pellets D.R. Concentrate D.R. Pellets Fe 68.0% Fe 65.5% Fe 69.5% Fe 67.4% Core Product Alternative Value-Add Products SiO2 4.5% SiO2 4.5% SiO2 1.3% SiO2 2.0% P 0.02% S <0.01% P 0.02% S <0.01% S 0.05% CaO/

  14. Slide 14: Secured Infrastructure Access (Rail, Port, Power)

    Secured Infrastructure Access (Rail, Port Power) Key to a Successful Iron Ore Project TSX: BKI • Letters of Intent in place for Electricity (140MW) and Natural Gas (900m3/hr @85kPa) • Paved roads to site, located 35km away from the major city of Kryvyi Rih which has a highly skilled work force • Let

  15. Slide 15: Strategic Global Location

    Strategic Global Location Close Proximity to Target Markets with Abundant Port and Rail Access TSX: BKI • Project is surrounded by steel mills in Europe, Turkey and the Middle East • River barge & rail access to Western Europe. • Five dry bulk tonnage ports accessible using railway running beside pr

  16. Slide 16: Ukraine: A Mining Friendly Country in Transition

    Ukraine: A Mining Friendly Country in Transition TSX: BKI • Member of World Trade Organization (WTO) • Large, highly skilled labour force (pop. 45.4 million) • S&P Sovereign Risk rating of B − GDP per capita only $7600/yr − Commodity driven economy (agriculture, metals − Literacy rate >99% and energ

  17. Slide 17: Globally Significant Iron Ore District

    Globally Significant Iron Ore District 4th largest iron ore producer & 2nd largest reserve base TSX: BKI • Black Iron’s projects are located in the heart of Global Distribution of Fe Reserves & Ukraine’s iron ore belt Fe Production – 35km from Kryvyi Rih, city of 750,000 people 60% • Iron ore distri

  18. Slide 18: Permit Process for Shymanivske Deposit

    Permit Process for Shymanivske Deposit Black Iron Remains on Track TSX: BKI Exploration Extraction Mining Land Construction Operations Permit Permit Allotment Allotment Approval Approval Explore Deem deposit Pit shell reserves Obtain surface Start mine Operate mine & resource economical & environmen

  19. Slide 19: BFS Highlights – High Grade Concentrate

    BFS Highlights – High Grade Concentrate High Value, Low Net Cost Iron Ore Development Project TSX: BKI Annual Production: 9.9 Mt Iron Content: 68.0% Estimated Capital Investment: US$1,097 million (capital intensity, includes 15% contingency) US$111/t Estimated Operating Expenses: (average FOB) US$44

  20. Slide 20: Black Iron's Operating Cost Competitiveness

    Black Iron’s Operating Cost Competitiveness Shymanivske: First Quartile to Local Markets; Second Quartile to China TSX: BKI 2013 Iron Ore Cost Curve Total Cash Cost (US$/t CFR China) BKI delivered to Europe/Middle East BKI delivered Markets to China Spot: $70/t World Cumulative Production (%) Source

  21. Slide 21: Black Iron's Capital Cost Advantage

    0% Vale (Shimandou 1) African Minerals (phase2) Xstrata (Askaf) ** See Disclaimer on page 2 ** African Minerals (DSO) 84 87 90 92 ArcelorMittal (Western… Fortescue (Expansion) Black Iron 109 109 111 Rio Tinto (IOC) 25% Sundance 122 134 Source: Company data; Renaissance Capital estimates Kumba Ferrex

  22. Slide 22: Black Iron's Target Capital Funding Strategy

    Black Iron’s Target Capital Funding Strategy 49% of Equity Capital Solidified with Metinvest Transaction; 100% of Off-Take Still Available TSX: BKI Estimated Capital Investment US$1.1 billion 40% 60% Equity Investment Debt Investment 51% 49% Black Iron Inc. Metinvest Export Credit Agencies (TSX: BKI

  23. Slide 23: Shymanivske Project Development Timeline

    Shymanivske Project Development Timeline* TSX: BKI 2011-2013 2014 2015 Future Drill metallurgical holes  Scoping Study/PEA  Definition Drilling  Bankable Feasibility Study   Pilot Plant Test Work  Land Acquisition Off-take & Project Finance Permitting  Detailed Engineering Construction Produc

  24. Slide 24: Black Iron Value Proposition

    Black Iron Value Proposition TSX: BKI Skilled Experienced management team and Board with history of creating value Leadership for shareholders of RioTinto and Ferrexpo Strategic Metinvest: Largest company in Ukraine; committed to half of project equity Partners financing Exceptional Excellent access

  25. Slide 25: Shymanivske Project Site

    Shymanivske Project Site TSX: BKI High voltage State-owned power lines rail line Paved Road 25

  26. Slide 26: Appendix

    Appendix

  27. Slide 27: Mineral Reserves & Resources Estimate

    Mineral Reserves & Resources Estimate TSX: BKI Tonnage Fe Tot Fe Mag 1) Mineral Reserve Estimate for the Shymanivske iron Shymanivske ore open pit as of January 8, 2014 prepared by P&E (Mt) (%) (%) Mining Consultants Inc. under the direction of Eugene Puritch, P.Eng. Proven 312.9 31.1 19.5 2) The Mi

  28. Slide 28: Contact us

    Contact us: 805-65 Queen Street West Toronto, ON, Canada, M5H 2M5 Mike McAllister, Manager IR Toronto: +1(416) 309 2134 Ukraine: +380 (56) 409 2536 info@blackiron.com Follow us: www.blackiron.com TSX: BKI

Black Iron — Investor Presentation (May 2015) on 6ix