PT BUMA Internasional Grup Tbk · IDX:DOID

PT BUMA Internasional Grup Tbk — PT Delta Dunia Makmur — 9M 2015 Earnings Presentation

32 slides from PT BUMA Internasional Grup Tbk's earnings presentation, November 2015

  1. Slide 1: PT Delta Dunia Makmur Tbk. 9M 2015 Results

    PT Delta Dunia Makmur Tbk. 9M 2015 Results November 2015

  2. Slide 2: Coal Industry

    Coal Industry High-Low Coal Price (USD) Indonesia Coal Production and Sales Year High Low (mn tons coal) 2007 90.90 51.60 500 474 2008 192.50 75.25 450 435 425 400 2009 86.25 60.20 386 381 350 353 359 333 2010 126.10 88.00 300 304 275 2011 138.50 108.95 273 250 256 240 2012 118.95 78.05 217 191 208

  3. Slide 3: Delta Dunia & The Company

    Delta Dunia 3 4 & The Company

  4. Slide 4: Overview

    Overview PT Delta Dunia Makmur Tbk. -- Delta Dunia Listed on IDX as DOID Holdco of BUMA, second largest coal mining services contractor in Indonesia Acquired entire shares of BUMA less one share in 2009 DOID then divested its real estate business and focused on coal mining services PT Bukit Makmur M

  5. Slide 5: Shareholder and Management Structure

    Shareholder and Management Structure Delta Organization Structure Public President NTP Ltd(1) Shareholders Director H. Kumala 39.4% 60.6% Finance Director Director Director R. Sofjan E. E. Porwanto Pardede 100% (2) (1) Northstar Tambang Persada Ltd., a company owned by a consortium of investors cons

  6. Slide 6: Mining Services Sector Key Players

    Mining Services Sector Key Players1) - BUMA is Second Largest Mining Contractor In Indonesia 2012 2013 2014 Darma Darma Darma Petrosea Henwa Petrosea Henwa Petrosea Henwa 7% 4% 3% Overburden Production 7% 8% 4% CK CK CK 6% 5% 6% Leighton Leighton Leighton 9% PAMA 6% 4% 39% PAMA Thiess PAMA Thiess 45

  7. Slide 7: Existing Contracts

    Existing Contracts No Customers Period Kalimantan 1 Adaro (Paringin) 2009-2019 2 Kideco 2004-2019 Berau - Lati 3 Berau Coal (Lati) 2012-2017 Berau - 4 Berau Coal – Hauling (Suaran) 2003-2018 Binungan 5 Berau Coal (Binungan) 2003-2019 Berau - 7 KPC (Bengalon) 2011-2016 Suaran 8 Darma Henwa (KPC) 2014

  8. Slide 8: Main Equipment

    Main Equipment Fleet Type Description Total OB Loader 120 T - UP Excavator 116 OB hauler 50T Up off Highway Dumptruck 707 Coal Loader 50T-120T Excavator, 40T Excavator and Wheel Loader 85 Coal Hauler Hauling Dump Truck, Prime Mover 344 Drill All Off Drilling Unit 30 Mine up All of Mine Pump 106 Supp

  9. Slide 9: Latest Performance Highlights

    Latest Performance Highlights

  10. Slide 10: 9M 2015 Key Consolidated Results

    9M 2015 Key Consolidated Results HIGHLIGHTS OF CONSOLIDATED RESULTS HIGHLIGHTS OF QUARTERLY RESULTS (in US$M unless otherwise stated) (in US$M unless otherwise stated) Profitability 9M15 9M14 YoY Volume 1Q15 2Q15 3Q15 EBITDA 139 140 0% OB Removal (mbcm) 59.0 70.1 72.3 EBITDA Margin 33.9% 31.9% n.m C

  11. Slide 11: Quarterly Trends

    Quarterly Trends OVERBURDEN REMOVAL QUARTERLY PROFITABILITY TREND (MBCM) (US$M) 68.7 71.7 71.9 70.1 72.3 63.4 38.4% 59.0 32.8% 32.7% 34.4% 30.2% 31.5% 27.5% 156 156 152 147 148 145 122 1Q14 2Q14 3Q14 4Q14 1Q15 2Q15 3Q15 COAL PRODUCTION 58 (MT) 46 45 49 45 49 33 8.9 7.8 8.0 7.7 8.1 7.9 7.5 1Q14 2Q14

  12. Slide 12: 9M 2015 Performance Highlights

    9M 2015 Performance Highlights In Q3 2015, volume of overburden (OB) removal combined with coal increased by 4.2% QoQ (+1.6% YoY). Third Quarter Highlights Despite challenging macro situation, Company continued to show encouraging progress on its performance throughout 2015. Q3 2015 saw the highest

  13. Slide 13: 2015 Other Significant Measures

    2015 Other Significant Measures In June 2015, BUMA signed a life of mine contract with PT Sungai Danau Jaya (“SDJ”), a subsidiary of Geo Energy Resources Ltd., a publicly-listed entity in Singapore. CONTRACTS In August 2015, BUMA signed a 3-year mining services contract with PT Tadjahan Antang Miner

  14. Slide 14: BUMA – The Strategy

    Delta Dunia 3 4 & BUMA -— The Strategy

  15. Slide 15: The Game Plan

    The Game Plan FOCUS ON OPERATIONS FOCUS ON FCF AND CAPITAL STRUCTURE 1 People & Free Cash Flow Generation Communication Working EBITDA Capex 4 2 Capital Cash Flow & Customer Relationship Capex Management 5 Capital Structure Improvement 3 Operational Improvements & Cost Efficiency Debt Repayments Imp

  16. Slide 16: Customers: Sticking with the High Quality Ones

    Customers: Sticking with the High Quality Ones CUSTOMERS’ COAL PRODUCTION REVENUES BY CUSTOMERS 1) (MT) (%) FY13 FY14 +8% -2% 39% 56.2 53.552.7 52% 52.3 +8% Top 5 Customers 40.3 37.3 +3% 21% 23.524.2 -30% 2) 20% 13.7 9.6 14% 11% 16% Bayan Group 0% Bayan Group 14% 13% Others 1% 0% Total Production by

  17. Slide 17: Customers: Volume Growth Trend

    Customers: Volume Growth Trend TOTAL VOLUME PRODUCTION OB REMOVAL PRODUCTION (M BCM + M TONS) (M BCM) +26% -7% +13% 382.5 329.6 306.7 Others -6% +8% Existing customers 104.7 97.3 109.5 105.6 83.7 101.5 64.7 20.8 235.6 226.3 FY12 FY13 FY14 9M14 9M15 +4% -19% +2% 18.1 -12% 54.7 44.2 44.9 33.9 29.6 281

  18. Slide 18: Operations: Cost Efficiencies

    Operations: Cost Efficiencies CASH COSTS excl. FUEL(I) EBITDA & MARGINS (US$/UNIT) (US$ M, %) -5% EBITDA Margin 3) +2% -6% 32.1% 29.4% 31.8% 31.9% 33.9% 1.20 1.22 1.16 1.14 1.08 FY12 FY13 FY14 9M14 9M15 RIGHT-SIZING PROGRAM (2) 238 (Headcount) 186 185 140 139 10,978 8,792 8,580 8,341 FY12 FY13 FY14

  19. Slide 19: Operations: Operational Improvements

    Operations: Operational Improvements AVAILABILITY AND UTILIZATION 86% 87% 85% 86% 86% (%) 83% 85% 82% FY12 FY 13 FY 14 9M15 63% 63% 59% 61% 57% 56% 58% 54% PA Loader % PA Hauler % UA Loader % UA Hauler % PRODUCTIVITY (BCM/HOUR) FY12 FY 13 FY 14 9M15 777 696 750 640 126 131 131 135 Loader Hauler Oper

  20. Slide 20: Cash Flow and Capex: Focus on Generating FCF

    Cash Flow and Capex: Focus on Generating FCF BUMA CAPEX SPENDING BUMA PAST DUE RECEIVABLES (US$M) (US$M) 110.8 Post management changes Post management changes 90 89.8 57 50 48 51 51 38.6 32.7 40 16.9 13.0 9.0 3.8 10.9 2.3 2.2 3.2 2.1 4.5 1.4 1Q12 2Q12 3Q12 4Q12 1Q13 2Q13 3Q13 4Q13 1Q14 2Q14 3Q14 4Q1

  21. Slide 21: Capital Structure: FCF for Debt Reduction

    Capital Structure: FCF for Debt Reduction Debt Position Consolidated Cash Position *) 942 919 942 916 889 (US$M) (US$M) 215 812 200 885 770 851 740 734 723 185 702 688 758 157 155 716 144 674 668 137 131 614 633 585 586 603 557 101 99 68 Dec-12 Mar-13 Jun-13 Sep-13 Dec-13 Mar-14 Jun-14 Sep-14 Dec-14

  22. Slide 22: Capital Structure: Debt Restructuring Completion

    Capital Structure: Debt Restructuring Completion DEBT SERVICE PROFILE DEBT COVENANTS (US$M) (Debt / EBITDA) 6.0x Original Restructured ORIGINAL VS RESTRUCTURED 5.0x $500 4.0x $450 3.0x $400 2.0x $350 Jun-14 Jun-15 Jun-16 Jun-17 Jun-18 Jun-19 $300 Original Restructured $250 NET DEBT (US$M) $200 -53%

  23. Slide 23: Capital Structure: Debt Restructuring Completion

    Capital Structure: Debt Restructuring Completion Terms Comparison 2014 Amended Facility 2011 Original Facility Amended Facility Amount/ Original Facility US$602.69mn US$ 800.00mn Final Maturity 31 Dec 2019 31 March 2018 Remaining Average Life c.4.75 years c.2.05 years Interest Margin 3M Libor + 400b

  24. Slide 24: Key Takeaways

    Key Takeaways Challenging Coal may stay below US$ 60/ton for some time Environment Lower cost producers are the first to reap benefits from coal price recovery Improved relationship with existing major customers Progress Post Maintained EBITDA margin Management Free cash flow generation Changes Sign

  25. Slide 25: End of Presentation - Thank You

    End of Presentation - Thank You

  26. Slide 26: Appendix

    Delta Dunia 3 4 & Appendix

  27. Slide 27: BUMA's Financial Highlights

    BUMA’s Financial Highlights NET REVENUE EXCL. FUEL EBITDA (US$M) (US$M) 740 240 241 684 227 635 199 202 0% 580 582 -6% 188 188 487 504 438 411 141 141 2008 2009 2010 2011 2012 2013 2014 9M'14 9M'15 2008 2009 2010 2011 2012 2013 2014 9M'14 9M'15 EBITDA MARGIN* CAPITAL EXPENDITURES (%) (US$M ) 40.9 40

  28. Slide 28: High Quality and Diversified Customers

    High Quality and Diversified Customers BUMA Revenues by Customer Coal 9M 2015 (9M2014) (1) Production BUMA’s Relationship in 2014 Share Since Others** KPC* (MT) 0% (0%) 16% (14%) Arutmin Bayan 0% (1%) Group 24.2 57% 1994 0% (11%) * 52.7 8% 2008 Kideco 19% (21%) 56.2 11% 2002 Adaro Berau 13% (14%) 52

  29. Slide 29: BUMA's Cost Structure

    BUMA’s Cost Structure BUMA’s Cost Structure for 9M 2015 (9M 2014) Others Overhead 6% (7%) Fuel 6% (6%) 3% (6%) D&A 22% (21%) Spare parts & FMC 32% (32%) Salary 16% (15%) Other consumables 15% (15%) Note: - Other consumables: tires, blasting, drilling and oil - Others: mobilization, rental, subcontra

  30. Slide 30: Delta Consolidated – Key Financial Highlights

    Delta Consolidated – Key Financial Highlights Consolidated Statements of Financial Position Consolidated Statements of Comprehensive Income In US$ mn (unless otherwise stated) Sep-15 Dec-14 YTD In US$ mn (unless otherwise stated) 9M15 9M14 YoY Cash and cash equivalents 118 75 57% Net revenues 419 45

  31. Slide 31: BUMA – Key Financial Highlights

    BUMA – Key Financial Highlights BUMA’s Statements of Financial Position BUMA’s Statements of Comprehensive Income In US$ mn (unless otherwise In US$ mn (unless otherwise stated) 9M15 9M14 YoY stated) Sep-15 Dec-14 YTD Net revenue 419 459 -9% Cash 97 52 86% Revenue excl. fuel 411 438 -6% Trade receiv

  32. Slide 32: Disclaimer

    Disclaimer These presentation materials have been prepared by PT Delta Dunia Makmur Tbk (“Delta”) (the “Company”), solely for the use at this presentation and have not been independently verified. Information relating to PT Bukit Makmur Mandiri Utama (“BUMA”) has been included with its content, and

PT Delta Dunia Makmur — 9M 2015 Earnings Presentation on 6ix