BP plc · LSE:BP.

BP — Investor Presentation (May 2002)

25 slides from BP's investor presentation, May 30, 2002

  1. Slide 1: BP in Angola

    BP in Angola Greg Coleman Vice-President, Investor Relations Paris, 30 May 2002

  2. Slide 2: Forward-looking statements disclaimer

    This presentation and the associated slides and discussion contain statements, particularly those regarding capital employed, capital expenditure, cashflows, costs, savings, debt, demand, disposals, dividends, earnings, efficiency, gearing, growth, investment, margins, performance, prices, productio

  3. Slide 3: Outline

    outline • Upstream growth strategy • Angola context • BP in Angola • Technology implementation • Conclusion

  4. Slide 4: Strategic delivery since 1999

    strategic delivery since 1999 costs down 20% returns ~ _ 15% disposals $10 bn + Alaska+ Arco + Veba accretive sustainable $7.7 to 8.5 bn at profitability mid-cycle in 2001

  5. Slide 5: Delivering group strategy

    delivering group strategy  organic investment  high grade portfolio  capital efficiency  operating efficiency  increase mid-cycle returns  grow capital employed  grow dividend …within a disciplined financial framework

  6. Slide 6: Future outlook

    future outlook Production (mboed) Production cost ($/boe) 5000 4 5.5% 4000 3 Base 3000 2 Total 2000 1 Growth 0 0 '96 '97 '98 '99 '00 '01 '02 '03 '04 '05 '98 '99 '00 '01 '02 '03 '04 '05 Base New Projects Like for Like adjustment Source: BP Data Source: BP Data As of February 2001

  7. Slide 7: New projects

     No exploration required new projects  No technology step-out  All teams in place Northstar Shearwater Alligin Tambar Rhum Mad Dog Skarv Horn Mtn. Holstein Clair Princess Na Kika Devenick King’s Peak Atlantis ACG King Thunder Horse Shah Deniz Europa Trin. Marlin Atlas Methanol Karous/Temsah Diana

  8. Slide 8: New project production

    new project production mboed resources 1750 1500 18% 21% 1250 12% 1000 49% 750 500 250 0 1999 2000 2001 2002 2003 2004 2005 2006 producing under construction 02 sanctions pre-sanction engineering source: BP dataBP forecast 2002 - 06

  9. Slide 9: The deepwater prize

    the deepwater prize NW Europe Mediterranean Gulf of Mexico Asia Pacific W. Africa Gas Gas Oil Oil S.America Source: WoodMacKenzie Global Deepwater Markets June Global distribution of volumes discovered in deepwater (500m+) drilling to

  10. Slide 10: New project production (as of Feb '01)

    new project production (as of Feb ’01) Production (mboed) 1400 1200 1000 800 600 400 200 0 '99 '00 '01 '02 '03 '04 '05 RoW North Sea / Alaska Trinidad Deepwater Source: BP Data BP forecast 2002-2005

  11. Slide 11: Oil cost of supply

    oil cost of supply Cumulative production increase 2000-2010 mil bbl/d 14 Canada Heavy 12 Venezuela Heavy OPEC Mexico 10 Cost of Supply $/bbl* Other Kazakhstan FSU Venezuela Azerbaijan Nigeria UAE 8 Brazil Angola Libya 6 S.Arabia Iran New Saudi Kuwait Iraq 4 Arabia Shut-In 2 0 *includes F,D & L, 0 2

  12. Slide 12: Angola: an exciting deepwater future

    Angola: an exciting deepwater future Deepwater oil resources • Under development: 1.3 bn • Discovered: 7 – 8 bn Production potential • Yet to find: 7 – 12 bn? Total: 15 – 20 bn

  13. Slide 13: NPV10 ($ per bbl)

    NPV10 ($ per bbl) * $11 bbl $16 bbl 2.5 5 4.5 2 4 3.5 1.5 3 2.5 1 2 0.5 1.5 1 0 0.5 NOR BRA NIG ANG AZ GOM UK 0 -0.5 NOR BRA NIG ANG AZ GOM UK $30 bbl 14 Contractor group 12 10 take 8 Government take 6 4 Full Cycle, Model: Woodmac GEM 2 As of 2001 0 NOR BRA NIG ANG AZ GOM UK * Net Present Value disc

  14. Slide 14: BP in Angola: deepwater blocks

    BP in Angola: deepwater blocks Block 15 Block 31 2000m • 26.67% interest  26.67% interest • Exxon/Mobil operator 1000m and operator • Area 4,200 km2  Area 5,349 km2 14 • 12 discoveries  Water depth 15 • Kizomba development in 1500-2800m 15 1  PSA signed May 1999 31 2 execution 16  First well in

  15. Slide 15: Block 18 overview

    Block 18 overview • Water depths between Platina Galio ca 1,200 & 1,500 metres Plutonio • 6 discoveries • Distances determine the development economics 1250 100 15 750 175 00 • Significant range of 0 0 m m m m m concepts evaluated across ‘single’ and ‘multiple’ fields • ‘Greater Plutonio’ is first d

  16. Slide 16: Block 18 – Greater Plutonio

    Block 18 – Greater Plutonio • Selected development Platina Galio concept comprises: Plutonio  single, large FPSO  subsea wells across ‘multiple’ fields  extensive seabed flowline system 125 100 150 75 175 0 0 0m 0 0m m m m • Front End Engineering (FEED) in 1Q02 • Development offers infrastructure

  17. Slide 17: GoM learnings applied to Angola

    GoM learnings applied to Angola  Drilling completion design for depths exceeding 1,500 metres; sand control in poorly consolidated reservoirs  State-of-the-art processing of 3-D data  'Intelligent well systems' which transmit data and enable us to make better reservoir management decisions  Rise

  18. Slide 18: Greater Plutonio implementation

    Greater Plutonio implementation • Long distance tiebacks (lay costs, insulation systems) • Flow assurance (slug management, hydrates, operability) • Well and subsea reliability (well sand control, subsea equipment) • Riser systems (maturity, operability, cost) • Environmental focus; targets for CO2

  19. Slide 19: Technology: seismic interpretation

    technology: seismic interpretation Angola - Spectral decomposition Conventional Spectral decomposition image image

  20. Slide 20: Balancing costs and margins

    balancing costs and margins $11 bbl $16 bbl 12 18 16 10 14 8 12 10 6 8 4 6 4 2 2 0 0 NOR BRA NIG ANG AZ GOM UK NOR BRA NIG ANG AZ GOM UK $30 bbl 35 30 Contractor take 25 20 Government take 15 10 Opex 5 Capex 0 NOR BRA NIG ANG AZ GOM UK Full Cycle, Model: Woodmac GEM As of 2001

  21. Slide 21: Conclusions

    conclusions • Angola fits within BP’s upstream growth strategy • Deepwater Angola - A world class producer, sustainable and long-term future for BP - Portfolio uniquely positioned; interest in all the key offshore blocks • Implementation with best practice • Application of technology from GoM Deepwa

  22. Slide 22: Qs and As

    Qs and As

  23. Slide 23: Slide 23

  24. Slide 24: BACK UP

    BACK UP

  25. Slide 25: Building an Angolan organisation

    building an Angolan organisation • Build Angolan business, run by Angolans • Initiatives to recruit, train and develop local staff • Economic participation • Foster capacity building, civil society and industrial development • Sustainable social projects led by Angolans

BP — Investor Presentation (May 2002) on 6ix