Aurum Resources Limited · ASX:AUE
Aurum Resources — Merger or Acquisition (November 2023)
28 slides from Aurum Resources's merger presentation, Nov 21, 2023
Slide 1: A new beginning
A new beginning Aurum Resources with More Gold PlusOr Global Pty Ltd ASX: AUE 21 November 2023
Slide 2: Disclaimer
Disclaimer This presentation prepared by PlusOr Global Pty Ltd (“Company”) does not purport to contain all the information COMPETENT PERSONS STATEMENT that a prospective investor may require in connection with any potential investment in the Company. You should The information in this presentation t
Slide 3: Investment highlights
Investment highlights Aurum Resources PlusOr Global Pty Ltd • Australian gold exploration company with projects in • Western Australia • Côte D’Ivoire, West Africa • Board and Management with proven track record of value creation • Changed the rules of exploration with self-owned diamond drill rigs
Slide 4: Investment highlights (continued)
Investment highlights (continued) Aurum Resources PlusOr Global Pty Ltd • AUE Shares on issue post transaction 61.9 million comprised of • AUE: 36.5 million (existing prior to Plusor transaction) • Plusor: Receives 25.4 million AUE consideration shares as payment • Cash $2.55 million (as of 30th Sep
Slide 5: Investment highlights (continued)
Investment highlights (continued) Aurum Resources PlusOr Global Pty Ltd Board of Directors Aurum Resources Plusor Global Troy Flannery – Non-Executive Chairman Caigen Wang – Founder and Managing Director • Mining Engineer with a Masters in Finance, has over 25 years’ • Mining Engineer with >25 years
Slide 6: West Africa - Destination of Choice
West Africa - Destination of Choice Exploration • largest number of discoveries over last 10 years globally – Production still significantly underexplored • West Africa is the largest gold producing region Permitting globally • Efficient process reduces time from discovery to • Over 80% gold product
Slide 7: West Africa - Destination of Choice (continued)
West Africa - Destination of Choice (continued) Construction Low capital intensity with industry-wide track record of delivering projects on time and on- budget: • High quality projects • Significant resource potential • Favourable topography and weather • Good power and transport infrastructure • L
Slide 8: Côte D'Ivoire – Growing Gold Producer
Côte D'Ivoire – Growing Gold Producer • Stable - Political governance and strong economic performance • Extensive Birimian - Gold bearing rocks with approximately 34% of West Africa’s greenstone host over 60 +1Moz deposits • Underexplored - World-class discovery potential • Proven jurisdiction - for
Slide 9: Our Projects – Targeting Birimian greenstones
Our Projects – Targeting Birimian greenstones Boundialy 0 20km Gold Project • Prospective land package • Host prospective Birimian greenstones • Proximal to major mines or discoveries (e.g. Resolute’s Syama gold mine and Perseus’ Sissingue gold mine on the north and Montage Gold’s 4Moz Koné project
Slide 10: Boundiali - BM gold project JV
Boundiali - BM gold project JV - Prospectivity and business model • Large scale gold system • Extensive artisanal workings • Proximal to major mines or discoveries • Geochem database – strong gold anomalism: • Seven (7) targets with >2km strike length BM gold project JV +100ppb gold anomaly in NW of
Slide 11: Boundiali - BM gold project JV
Boundiali - BM gold project JV – Extensive artisanal working and nearby infrastructure
Slide 12: Boundiali - BM gold project JV
Boundiali - BM gold project JV - Extensive database • Four RC holes drilled intersecting gold mineralisation: ➢ 22m @ 1.06 g/t Au from 87m and 9m @ 1.79 g/t Au • 93 AC drill holes • Extensive gold in soil anomalism: ➢ 13,368 samples. ➢ Infill has been undertaken in areas, bringing sample density dow
Slide 13: Boundiali - BM gold project JV – 4,160m DD drilling underway
Boundiali - BM gold project JV – 4,160m DD drilling underway TARGET 1 TARGET 2 7Km strike length 7Km strike length • 27 DD holes for 3,560m designed 6 DD holes for 600m are designed • 1,959m drilled as of 19 Nov. 2023 6Km strike length 6Km strike length • 7 targets defined • 4,160m diamond being dri
Slide 14: BM Gold Project Section S1094179N
BM Gold Project Section S1094179N Shear zone alteration from 84.77m to 160.98m Open
Slide 15: Boundiali – PR-808 13km gold corridor
Boundiali – PR-808 13km gold corridor • 80% project interest acquired • Nyangboue gold structure ➢ Multiple corridors of +20ppb gold anomalism ➢ Higher gold values include 1,185, 806 and 626 ppb Au • Shallow drilling <60m depth ➢ Only ten holes extend beyond 100m downhole ➢ 91 RC holes drilled for 6
Slide 16: Boundiali – PR-808 – Wide gold mineralisation
Boundiali – PR-808 – Wide gold mineralisation 1 Refer Predictive Discovery Ltd (ASX:PDI) ASX announcements dated 23 June 2016, 25 July 2016, 8 August 2016, 17 May 2017, 29 May 2017 2 Refer ASX announcement dated 17 June 2022
Slide 17: Boundiali – PR-808 – Upcoming drilling campaign
Boundiali – PR-808 – Upcoming drilling campaign • 4,000m designed • Scheduled to commence mid December 2023
Slide 18: We care about our shareholders and look after all stakeholders
We care about our shareholders and look after all stakeholders
Slide 19: Drilling our dollars further
Drilling our dollars further NOCK • We own our diamond drill rigs • Proven game changing strategy for junior explorers • Reduce drilling costs by up +65% • Fastrack resource growth • Reduce cash burn - delays capital raises needed to keep rigs spinning • Small footprint and man portable • Owners hav
Slide 20: Why invest in Aurum + PlusOr
Why invest in Aurum + PlusOr Aurum Resources PlusOr Global Pty Ltd • Experience • management has track record of creating value for shareholders from exploration and project development • Knowledge • over 10 years experience in Country and jurisdiction • Trust • by Government, investors and project
Slide 21: A new beginning for more gold
A new beginning for more gold Aurum Resources PlusOr Global Pty Ltd “We are hunters, We give up bird because we love gold Our feet are naked, our thought is rich Le meilleur – The best”
Slide 22: Appendix One - Table of Drill Hole Details
Appendix One - Table of Drill Hole Details BM Project historical drilling UTM East UTM North Hole_ID Depth DIP AZM TYPE From To Interval Au g/t Z29 Z29 TIOAC010 796097 1092540 54 -50 290 AC 8.00 19.00 11.00 1.98 TIOAC020 796132 1093028 50 -50 290 AC 25.00 30.00 5.00 2.09 TIORC001 796,495 1,093,630 1
Slide 23: Appendix Two - Section 1 of the JORC Code, 2012 Edition – Table 1
Appendix Two - Section 1 of the JORC Code, 2012 Edition – Table 1 Sampling Techniques and Data – BM Project Area
Slide 24: JORC Code Table 1 - logging and sub-sampling
JORC Code exp! logged to a level of detail to support appropriate Mineral Resource estimation, mining studies and metallurgical studies. Whether logging is qualitative or quantitative in nature. Core {or costean, channel, etc} photography. © The total length and percentage of the relevant intersecti
Slide 25: JORC Code Table 1 - quality control and verification
parameters used in determining the analysis including instrument make ‘and model, reading times, calibrations factors applied and their derivation, ete, Nature of quality control procedures adopted {eg standards, blanks, duplicates, external laboratory checks) and whether acceptable levels of accura
Slide 26: JORC Code Table 1 - Section 2 tenement status
Criteria JORC Code explanation ‘Commentary ‘out given the reconnaissance nature of exploration drilling and trenching, Criteria ‘Mineral tenement and land tenure status Section 2 of the JORC Code, 2012 Edition - Table 1 JORC Code explanation © Type, reference name/number, location and ownership incl
Slide 27: JORC Code Table 1 - data aggregation methods
tion JORC Code exp! © Ifthe exclusion of this information is justified on the basis that the information is not Material and this exclusion does not detract from the understanding of the report, the Competent Person should clearly explain why this is the case. entary Data aggregation methods ‘* In r
Slide 28: JORC Code Table 1 - other exploration data and further work
Other substantive exploration data Further work JORC Cod planation * Other exploration data, if meaningful and material, should be reported including (but not limited to): geological observations; geophysical survey results; geochemical survey results; bulk samples - size and method of treatment; me
Aurum Resources — Merger or Acquisition (November 2023) on 6ix