Magnetite Mines Ltd. · ASX:MGT

Magnetite Mines — Shareholder Meeting (November 2020)

28 slides from Magnetite Mines's shareholder meeting presentation, Nov 27, 2020

  1. Slide 1: Magnetite Mines Limited 2020 Annual General Meeting

    For personal use only MAGNETITE MINES LIMITED High Grade Iron Ore Concentrate 2020 ANNUAL GENERAL MEETING

  2. Slide 2: Disclaimer

    DISCLAIMER For personal use only Important Notice The purpose of this presentation is to provide general information about Magnetite Mines Limited ("MGT"). It is not recommended that any person makes any investment decision in relation to MGT based on this presentation. This presentation contains ce

  3. Slide 3: Corporate Overview

    CORPORATE OVERVIEW For personal use only SHARE PRICE (1 Year) CAPITAL STRUCTURE Shares M 2,856 Options M 79 Quoted Options M 470 Share price (25 Nov 2020) A$ $0.01 Market Capitalisation (25 Nov 2020) A$ $29m Cash (25 Nov 2020) A$ $5.355m SHAREHOLDER SNAPSHOT BOARD OF DIRECTORS Mr Peter Schubert Exec

  4. Slide 4: 2020 – Delivering the Plan for a Staged, Scaleable Development

    2020 – DELIVERING THE PLAN FOR A STAGED, SCALEABLE DEVELOPMENT For personal use only • Successful, shareholder centred capital raises – PFS fully funded1 • Assembling a team of experienced experts to deliver optimum results8 • PFS underway and already delivering technical and economic breakthroughs8

  5. Slide 5: Taking Advantage of Favourable Geography

    TAKING ADVANTAGE OF FAVOURABLE GEOGRAPHY For personal use only Location advantages: • 240km NE of Adelaide within the Braemar Iron Formation • Close to grid power, rail, port and groundwater 7 5

  6. Slide 6: Large Resource

    LARGE RESOURCE For personal use only 900 Razorback Iron Project Contained Fe 800 700 600 Mine by Mine reserves 500 400 300 200 100 - Note: shows Razorback resource (reserves not declared) and mine by mine reserves as reported (BHP WAIO does not report mine 6 by mine; Rio and FMG resources are not se

  7. Slide 7: Plan to Leverage Scale, Location and Opportunity to Deliver Value

    PLAN TO LEVERAGE SCALE, LOCATION AND OPPORTUNITY TO DELIVER VALUE For personal use only • Large resource in favourable geography • JORC resource 3.9 billion tonnes global resource (Inferred and Indicated) 5 • Amenable to simple processing to high grade product – targeting 68.5% Fe, 6.5% Fe higher th

  8. Slide 8: High Grade Fines – Material Premium and Stable Pricing

    HIGH GRADE FINES – MATERIAL PREMIUM AND STABLE PRICING For personal use only • A year ago, we highlighted that Chinese steel production at record levels with iron imports lagging • 62% pricing has increased by around 40% since then • Grade premiums in $/% Fe are at ~US$4 per % (have been as high as

  9. Slide 9: Global Steel Production Increasing Over Years

    GLOBAL STEEL PRODUCTION INCREASING OVER 20 YEARS For personal use only • Global steel production has been growing Global Steel Production rapidly 2,000,000 COVID-19 • China has added 400Mtpa in 10 years, but 1,800,000 is not alone – India, Iran and Vietnam have 1,600,000 added 60Mtpa 1,400,000 GFC •

  10. Slide 10: China's Steel Production and Iron Ore Imports Are Strong

    CHINA’S STEEL PRODUCTION AND IRON ORE IMPORTS ARE STRONG For personal use only • China’s annual crude steel production for China quarterly iron ore imports and crude steel production 2019 was a record, just short of 1 Bt (annualised) • Chinese steel production has continued to 1,400 increase despite

  11. Slide 11: But Iron Ore Supply Is Not Keeping Up With Demand

    BUT IRON ORE SUPPLY IS NOT KEEPING UP WITH DEMAND For personal use only • Despite substantial increases in steel Crude Steel And Contained Iron In Exports production and iron ore demand, the 1200 traditional sources of supply have been slow to expand 1000 • Africa is the major potential new source –

  12. Slide 12: No Major Expansions in Iron Ore Mine Construction in Australia

    NO MAJOR EXPANSIONS IN IRON ORE MINE CONSTRUCTION IN AUSTRALIA For personal use only Project Company State Capacity (e) Resource Capex $m (mid)Start (e) Capital/t Comment Buckland Project BCI Minerals Limited WA 8,000 Hematite 744 2021 $ 93 Sold • Australian Government Corunna downs Atlas Iron WA 4,

  13. Slide 13: Focussed on High-Grade Low Alumina Products

    FOCUSSED ON HIGH-GRADE LOW ALUMINA PRODUCTS For personal use only Indicative Razorback Iron Project – Fe Concentrate Specs6 Typical Brand Quality Comparison 55.0% 60.0% 65.0% 70.0% Fe % 68.5 RAZORBACK Carajas Fines (Vale) Silica % 3.3 Newman Fines (BHP) Vale SSF Alumina % 0.4 Vale BBF PB Fines (RioT

  14. Slide 14: Attractive, Staged Development Pathway Focussed on Capital Efficiency

    ATTRACTIVE, STAGED DEVELOPMENT PATHWAY FOCUSSED ON CAPITAL EFFICIENCY For personal use only • Strong iron ore demand, premiums for high grade products and limited new supply provide a favourable environment for Razorback • We believe that a relatively low capital, long life development of the large

  15. Slide 15: Pre-Feasibility Study Underway

    PRE-FEASIBILITY STUDY UNDERWAY For personal use only • The PFS fully funded and work is well underway1,8 • It builds on and improves prior work completed for the 2019 Scoping Study7 • In house team supported by external technical experts – low overhead approach8 • Focus is on maximising shareholder

  16. Slide 16: Assembling an Experienced Study Team and Developing Delivery Relationships

    ASSEMBLING AN EXPERIENCED STUDY TEAM AND DEVELOPING DELIVERY RELATIONSHIPS For personal use only Mark Eames – Technical Director Stephen Weir B.Eng Hons (Mech), Grad Dip. Appl. Fin. SIA – Chief Development Officer Mr Eames has a successful track record in the global minerals industry in exploration,

  17. Slide 17: NextOre – Year Exclusivity Australia Wide

    NEXTORE – 4 YEAR EXCLUSIVITY AUSTRALIA WIDE For personal use only • Agreement with NextOre for supply of a full-scale mobile ore sorting plant for the Razorback Project for sorting magnetite ore using MR technology, with equipment despatch from the CSIRO Lucas Heights facility in 2021 9 • Exclusive

  18. Slide 18: New Geological Interpretation

    NEW GEOLOGICAL INTERPRETATION For personal use only • Extensive drilling has resulted in a comprehensive database, core library and geophysical logs3 • We have used this extensive information to build a new orebody model that allows a new interpretation of the grade distribution and enables detailed

  19. Slide 19: Selective Mining

    SELECTIVE MINING For personal use only • Selective mining identified as potential optimisation during 2019 Scoping Study7 • Razorback iron deposit well suited to selective mining given layered stratigraphy and mineralisation • MBGS completed qualitative study, followed by geological modelling of the

  20. Slide 20: Metallurgical Investigations

    METALLURGICAL INVESTIGATIONS For personal use only • High resolution testwork has confirmed the stratabound nature of mineralisation i.e. mineralisation is contained within discrete, traceable layers – not disseminated mineralisation3 • Hatch is currently undertaking a metallurgical review of the Ra

  21. Slide 21: Water Studies

    WATER STUDIES For personal use only • ELA investigating potential prospective groundwater supply areas in close proximity to the mine site, with the aim to source a water supply that is feasible4 • Five preliminary target areas have been selected as potential prospective groundwater supply areas bas

  22. Slide 22: Advancing Infrastructure Access

    ADVANCING INFRASTRUCTURE ACCESS For personal use only • Logistics and power options developed under the 2019 Scoping Study to be refined utilising existing infrastructure providers7 • Location of Razorback deposit well placed with respect to existing infrastructure • Commercial engagement with power

  23. Slide 23: Environment and Permitting

    ENVIRONMENT AND PERMITTING For personal use only • Ecological Australia have been engaged to initiate baseline environmental studies and have provided an approval pathway4 Key activities • Baseline studies (incl, heritage, flora, fauna, water etc.) • Environmental impact assessment study (incl. wate

  24. Slide 24: Indicative Development Schedule

    INDICATIVE DEVELOPMENT SCHEDULE For personal use only 2020 2021 2022 2023 2024 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 PFS (excl drilling/met testing) Bulk Ore Sorting Trial DFS Funding DFS Study Decision to Mine Project Funding Permitting, Enviro. and Native Title Design Procure

  25. Slide 25: 2021 – Shaping Up for Production

    2021 – SHAPING UP FOR PRODUCTION For personal use only • Refine geological model including weathering profile and potential drill targets, firm up JORC selective mining resource • Complete selective mining design/optimisation and prepare for ore sorting trial • Undertake metallurgical investigations

  26. Slide 26: The MGT Value Proposition

    THE MGT VALUE PROPOSITION For personal use only Five Key Advantages of the Razorback Iron Project 1. Globally significant iron ore resource in low sovereign-risk jurisdiction 2. Open-access to existing port, road, rail and power infrastructure7 3. Conventional processing/beneficiation flowsheet with

  27. Slide 27: References – ASX Releases

    References – ASX Releases For personal use only 1. 2/10/2020 – Results Of Renounceable Rights Issue 2. 7/10/2020 – Ore Sorting Technology Agreement Update 3. 19/08/2020 – Selective Mining 4. 14/09/2020 – Permitting And Environmental Studies Initiated 5. 12/11/2020 – Razorback Iron Project – JORC 201

  28. Slide 28: Questions?

    For personal use only Questions? Mr Mark Eames Technical Director Magnetite Mines Limited www.magnetitemines.com