  1. Slide 1: The Pebble Project: A Pathway to Permitting

    THE PEBBLE PROJECT The Future of U.S. Mining & Metals A Pathway to Permitting September 2017 The Future of U.S. Mining & Metals 1

  2. Slide 2: Cautionary & Forward Looking Information

    Cautionary & Forward Looking Information This presentation includes certain statements that may be deemed "forward-looking statements". All statements in this presentation, other than statements of historical facts, that address exploration drilling, exploitation activities and events or development

  3. Slide 3: Investment Highlights: Advancing a Strategically Significant Project

    Investment Highlights: Advancing a Strategically Significant Project World Class Social & A Generational Permitting Resource Environmental Opportunity • Tier 1 by every • Recent legal • Committed to • Re-partnering measure settlement with EPA responsible of PLP • Proven mining • Normal course resour

  4. Slide 4: World Class Resource

    WORLD CLASS RESOURCE World’s Largest Undeveloped Cu–Au–Mo–Ag Resource The Future of U.S. Mining & Metals 4

  5. Slide 5: A World Class Mineral Resource

    A World Class Mineral Resource Resources Measured & Indicated Inferred • 6.44 B tonnes of Measured & Indicated Copper 57 B lb 25 B lb Gold 70 M oz 37 M oz • 4.46 B tonnes of Inferred Molybdenum 3.4 B lb 2.2 B lb Silver 344 M oz 170 M oz * Refer to table of Measured, Indicated and Inferred Resources

  6. Slide 6: Global Ranking of Porphyry Deposits

    Global Ranking of Porphyry Deposits1 Contained Copper and Contained Gold Pebble is the World’s Largest Undeveloped Copper and Gold Resource Escondida Pebble 1st Olympic Dam Andina Divison Grasberg El Teniente KGHM Polska Miedz Olympic Dam Reko Diq Collahuasi Cu Only Oyu Tolgi Cu + Ag Chuquicamata Cu

  7. Slide 7: Pebble Property Captures the World's Most Extensive Mineral System

    Pebble Property Captures the World’s Most Extensive Mineral System1 – Exploration Potential is High Induced Polarization has been the principal historical discovery method 1. USGS source. The Future of U.S. Mining & Metals 7

  8. Slide 8: Very High Grades Extend into the East Graben

    Very High Grades Extend into the East Graben What Happens East of the ZG1 Fault? Pebble Deposit 289.1 m Grading • Highest grades at Pebble truncated by the East Graben 1.98% CuEQ • Faulting was a post-mineralization event • DDH-6348 intersected 289.1 m grading 1.98% CuEQ below cover rocks in the gra

  9. Slide 9: Pebble May Host Other Major Deposits

    Pebble May Host Other Major Deposits • The extent of Pebble Alaska mineralization at Pebble is comparable to: ‒ Oyu Tolgoi ‒ Chuquicamata ‒ Los Bronces/ Andina • Exploration potential at deposit and within region is noteworthy Each area is shown at the same scale The Future of U.S. Mining & Metals 9

  10. Slide 10: Permitting: A Permit-Ready Project

    PERMITTING A Permit-Ready Project The Future of U.S. Mining & Metals 10

  11. Slide 11: Pathway to Permitting – A Fresh Start

    Pathway to Permitting – A Fresh Start • Legal Settlement with EPA ‒ Guarantees access to normal course permitting • Permitting must be initiated within 30 months • Our goal: re-partner this year and initiate permitting by year end • Advancing a project into permitting that is smaller and more respon

  12. Slide 12: Project Status and Goals

    Project Status and Goals The Future of U.S. Mining & Metals 12

  13. Slide 13: Pebble is a Permit Process Ready Project

    Permitting - Pebble is a Permit Process Ready Project • Comprehensive engineering and environmental work support a substantially smaller and more responsive project design to address stakeholder concerns • Goal is to initiate permitting by year-end • Goal is to advance expeditiously through the EIS

  14. Slide 14: Social & Environmental

    SOCIAL & ENVIRONMENTAL Our Vision: To design, permit, build and operate a modern mine at Pebble that fully co-exists with fisheries and traditional ways of life, and enhances the economic and social well-being of Alaskans The Future of U.S. Mining & Metals 14

  15. Slide 15: Social & Environmental - Mission, Vision, Values

    Social & Environmental - Mission, Vision, Values Mission • To develop the Pebble Project: A strategic Cu-Au-Mo-Ag resource Vision • To design, permit, build and operate a modern mine at Pebble that fully co-exists with healthy fish and wildlife populations and traditional ways of life in southwest A

  16. Slide 16: Re-Positioning

    Re-Positioning A comprehensive strategic initiative to change the face of the Pebble Project through key partnerships with local communities, Alaska Natives and commercial fishing interests: Completed In Progress • A project design more responsive to • Local/regional financial interest stakeholder c

  17. Slide 17: Pebble Project – National Economic Impact Study

    Pebble Project – National Economic Impact Study1 Pebble can help address Alaska’s fiscal crisis Nationally • 15,000 jobs • $2.5 billion to US GDP annually • Increase US copper production by 20% over decades of production In Alaska • Some 3,000 high-wage jobs • $109,500 average annual salary for mine

  18. Slide 18: Environmental Baseline Studies

    Environmental Baseline Studies • $150M invested over 7 years • One of the most extensive environmental databases ever assembled for a resource development project in America • Climate, water quality, wetlands, fish and aquatic habitat, wildlife, land and water use, socioeconomics and subsistence • S

  19. Slide 19: Bristol Bay Watershed Context – Hydrology/Fisheries

    Bristol Bay Watershed Context – Hydrology/Fisheries The Real story – The Fishery is Not Threatened The Future of U.S. Mining & Metals 19

  20. Slide 20: Natural Fish Habitat Constraints Create Mitigation/Enhancement Opportunities

    Natural Fish Habitat Constraints Create Mitigation/Enhancement Opportunities Numerous Pebble/Bristol Bay streams not producing fish at full potential due to natural constraints: • beaver dams & other barriers • dewatered & relic channels • low habitat complexity • limiting water quality • poor seedi

  21. Slide 21: A Generational Opportunity

    A GENERATIONAL OPPORTUNITY Making a Difference The Future of U.S. Mining & Metals 21

  22. Slide 22: Northern Dynasty – Hunter Dickinson

    Northern Dynasty – Hunter Dickinson • Northern Dynasty – affiliated with Hunter Dickinson • Hunter Dickinson (HDI) - A track record of success ‒ HDI, in business since 1985, has been involved in the discovery and advancement of several successful/prospective copper porphyries including Kemess, Mt. M

  23. Slide 23: Copper – A Significant Structural Deficit is Forecast

    Copper – A Significant Structural Deficit is Forecast Copper demand: Significant copper Intensity expected to increase • Non-OECD demand growth forecast at supply deficit expected in China2 +3.6% per annum to to emerge later this decade1 2030 • Includes Chinese demand growth +2.6% p.a. to 2030 and •

  24. Slide 24: C1 Cash Costs Net of By-Product Credits

    Global C1 Copper Cash Costs1 Pebble’s C1 copper cash costs are anticipated to be in the first decile of global primary copper mines C1 Cash Costs Net of By-Product Credits – US$/lb Cu 1 Source: Wood Mackenzie and BMO Capital Markets Note: Based on 2017E cash cost data. The Future of U.S. Mining & Me

  25. Slide 25: Valuation Potential

    Valuation Potential Resource provides potential for significant in-situ valuation upside relative to copper and gold peers as the Pebble Project advances As at August 29, 2017 Source: BMO Capital Markets, Bloomberg, Public Disclosure 1 Measured and Indicated Resources only, excludes Inferred Resourc

  26. Slide 26: Precedent Transactions

    Precedent Transactions There is Extraordinary Value Potential in Pebble/Northern Dynasty Northern Dynasty In-Situ Values1: 57/100th’s 1 cent per lb Cu US$8.00 per oz Au Exceptional In-Situ Value EV/Resource EV/Resource Date Acquiror Target Stage Date Acquiror Target Stage (US₵/lb) (US$/oz) Copper De

  27. Slide 27: Future Potential Value-Creating Catalysts

    Future Potential Value-Creating Catalysts • Re-partnering: ‒ The mining cycle has turned ‒ Mining sector has not invested in future resources to extent necessary ‒ Buy into partnership vs. explore and maybe discover? ‒ Pebble is strategic – a uniquely sized Cu-Au-Mo-Ag resource ‒ Positive fundamenta

  28. Slide 28: Share Capitalization: Very Supportive Shareholder Base

    Share Capitalization: Very Supportive Shareholder Base Issued & Options & Fully % Ownership2 Outstanding Warrants1 Diluted 304.0 M 63.4 M 367.4 M Balance Sheet & Major Trading Liquidity Shareholders C$48.7 M Cash/Equivalent • Stirling Global Value Fund (June 30, 2017) • Ostvast Capital • Kopernik Gl

  29. Slide 29: Investment Conclusions: Advancing a Strategically Significant Project

    Investment Conclusions: Advancing a Strategically Significant Project World Class Social & A Generational Permitting Resource Environmental Opportunity • Tier 1 by every • Recent legal • Committed to • Re-partnering measure settlement with EPA responsible of PLP • Proven mining • Normal course resou

  30. Slide 30: Appendices

    APPENDICES The Future of U.S. Mining & Metals 30

  31. Slide 31: Pebble is Among the World's Greatest Stores of Mineral Wealth

    Pebble is Among the World’s Greatest Stores of Mineral Wealth The Future of U.S. Mining & Metals 31

  32. Slide 32: Pebble Project Area – Strategically Situated in Alaska, USA

    Pebble Project Area – Strategically Situated in Alaska, USA Six Major Producing Mines - Alaska a Resource Development State Alaska State Constitution (1949) “It is the Policy of the State of Alaska to encourage…the development of its resources by making them available for maximum use consistent with

  33. Slide 33: Southwest Alaska & Bristol Bay

    Southwest Alaska & Bristol Bay The Future of U.S. Mining & Metals 33

  34. Slide 34: Pebble – Exploration History

    Pebble – Exploration History The Future of U.S. Mining & Metals 34

  35. Slide 35: 6.44 Billion Tonnes Measured & Indicated, 4.46 Billion Tonnes Inferred

    6.44 Billion Tonnes Measured & Indicated 4.46 Billion Tonnes Inferred Notes: David Gaunt, P.Geo., a qualified person who is not independent of Northern Dynasty is responsible for the estimate. These resource estimates have been prepared in accordance with NI 43-101 and the CIM Definition Standards.

  36. Slide 36: Anticipated Relative Values by Metal

    Anticipated Relative Values by Metal Note: Based on Measured and Indicated Resources only. Prices assumed are current long term consensus forecasts of $USD 2.96 lb Cu; $1,250 oz Au; $8.00 lb Mo and $17.75 oz Ag. Source: Company data and BMO Capital Markets. The Future of U.S. Mining & Metals 36

  37. Slide 37: Plan View

    Plan View Note: Metal prices used for copper equivalent (CuEQ) are same as for resource (see page 52). The Future of U.S. Mining & Metals 37

  38. Slide 38: Cross-Section

    Cross-Section Note: Metal prices used for copper equivalent (CuEQ) are same as for resource (see page 52). The Future of U.S. Mining & Metals 38

  39. Slide 39: Mines & Healthy Fisheries Do Co-Exist

    Mines & Healthy Fisheries Do Co-Exist Gibraltar Mine, British Columbia Gibraltar Mine Cyclone Sand Embankment Trophy Rainbow Trout Designed Seepage Collection Pond Fraser River Healthy fish with metal levels equal to or less than that found in control lakes outside the mine area. Conclusion We have

  40. Slide 40: Northern Dynasty Board of Directors

    Northern Dynasty Board of Directors Robert Dickinson Chairman Gordon Keep Director Mr. Dickinson, an economic geologist with more than 40 years of mineral Gordon Keep is a Professional Geologist with extensive business experience exploration experience who is an inductee of the Canadian Mining Hall

  41. Slide 41: Northern Dynasty Management

    Northern Dynasty Management Ronald Thiessen CEO and Director Sean Magee Vice President, Public Affairs Mr. Thiessen, a Chartered Professional Accountant (FPCA, FCA) with more than 25 Mr. Magee is a former journalist and speech writer who brings more than years of corporate development experience, le

  42. Slide 42: Pebble Limited Partnership Management

    Pebble Limited Partnership Management Tom Collier CEO John Shively Chairman Mr. Collier is a regulatory lawyer and former Chief of Staff in the U.S. Department Mr. Shively came to Alaska in 1965 as a VISTA volunteer. What began as a one- of Interior with extensive experience in federal permitting --

  43. Slide 43: Analyst Coverage

    Analyst Coverage • Craig Hutchison TD Securities • Mike Kozak Cantor Fitzgerald “Pebble is simply too large, too high quality, and too important globally for it to not wind up in the project pipelines belonging to the majors.” June 2017 • Chris Mancini Gabelli & Co. • Andrew Mikitchook BMO Capital M

  44. Slide 44: Contact Information

    Websites Contact Information www.northerndynasty.com General Office www.pebblepartnership.com 15th Floor www.pebbleresearch.com 1040 W. Georgia Street Vancouver, BC Canada V6E 4H1 Investor Relations info@northerndynasty.com Tel: 604.684.6365 TF: 800.667.2114 3201 C Street, Suite 404 Anchorage, AK 99