Yancoal Australia Ltd. · ASX:YAL

Yancoal Australia — Corporate Update (July 2015)

37 slides from Yancoal Australia's corporate update, Jul 28, 2015

  1. Slide 1: Community Consultative Committee Presentation – 28 July 2015

    Ashton Coal Operations Pty Ltd Community Consultative Committee Presentation – 28 July 2015

  2. Slide 2: Action List

    Action List ITEM RESPONSIBILITY PROGRESS UPDATE Newsletter to be drafted, published and distributed to DS Community newsletter postponed. community – including donations summary, SEOC appeal, UG infrastructure projects and rehabilitation photos Focus on Community Support Program. Tree Screen at New

  3. Slide 3: Ashton Statistics

    Ashton Statistics Ashton Coal Statistics 2015 Budget (YTD) 2015 Actual ROM (t) 1,411,041 1,383,534 Product Coal (t) 665,741 624,192 Total Coal Sales (t) 636,000 654,899 Lost Time Injury (LTI) 7.95 7.57 Total Recordable Injuries (TRI’s) 33.31 27.76 Total Employees (FTE) 222 199 3 20 December 2024 3

  4. Slide 4: Community Support Program

    Community Support Program ▪ Community Support Program • Established to provide assistance to local initiatives within the Upper Hunter region of Singleton and Camberwell. • Wide range of community needs such as education, environment, health, infrastructure projects, arts, leisure and research. ▪ Ho

  5. Slide 5: Community Support Program

    Community Support Program Organisation Purpose Amount ($) Singleton Mayoral Scholarship Academic Scholarship 2015 $5,500 Naidoc celebration week NAIDOC celebrations coordinated by the Singleton council $2,000 The Pancar Foundation and the High tea - Fundraiser for pancreatic cancer $300 Calcary Mate

  6. Slide 6: Current Operations

    Current Operations • ACOL has recently commenced LW104 in the Upper Liddell Seam. • South East Open Cut – no further movement • Upper Lower Liddell Drifts (ULLD) have been completed and pit bottom drivage is continuing in readiness for mining in the ULLD seam. 6 20 December 2024 6

  7. Slide 7: Exploration Activities

    Exploration Activities No exploration was conducted in EL5860 or EL4918. 7 20 December 2024 7

  8. Slide 8: Approvals Update

    Approvals Update As mining at ACOL progresses additional approvals are required to continue operations. Recent Approval determinations include: • Subsidence Monitoring Program for LW104 • Consolidated Water Monitoring and Hardrock Groundwater Licences Future approvals to be lodged include: • Extract

  9. Slide 9: Environment Monitoring Data

    Environment Monitoring Data ▪ The following slides present environmental monitoring data for the reporting period ▪ Meteorological • Rainfall ▪ Air Quality • Depositional Dust Gauges – Total suspended dust • PM10 – Tapered Element Oscillating Microbalance (TEOM) ▪ Surface Water – Glennies Ck, Bowman

  10. Slide 10: Rainfall

    Rainfall 10 20 December 2024 10

  11. Slide 11: Air Quality & Noise Monitoring Locations

    Air Quality & Noise Monitoring Locations 11 20 December 2024 11

  12. Slide 12: Depositional Dust

    Depositional Dust On-site Dust Gauges 12 20 December 2024 12

  13. Slide 13: Total Suspended Dust

    Total Suspended Dust 13 20 December 2024 13

  14. Slide 14: Total Suspended Dust

    Total Suspended Dust 14 20 December 2024 14

  15. Slide 15: PM10 Dust – Site 1

    PM10 Dust – Site 1 15 20 December 2024 15

  16. Slide 16: PM10 Dust – Site 2

    PM10 Dust – Site 2 16 20 December 2024 16

  17. Slide 17: PM10 Dust – Site 3

    PM10 Dust – Site 3 17 20 December 2024 17

  18. Slide 18: PM10 Dust – Site 8

    PM10 Dust – Site 8 18 20 December 2024 18

  19. Slide 19: Surface Water Sampling Locations

    Surface Water Sampling Locations 19 20 December 2024 19

  20. Slide 20: Surface Water Quality – pH

    Surface Water Quality – pH 20 20 December 2024 20

  21. Slide 21: Surface Water Quality – EC

    Surface Water Quality – EC 21 20 December 2024 21

  22. Slide 22: Surface Water Quality – pH

    Surface Water Quality – pH 22 20 December 2024 22

  23. Slide 23: Surface Water Quality – EC

    Surface Water Quality – EC 23 20 December 2024 23

  24. Slide 24: Surface Water Quality – pH

    Surface Water Quality – pH 24 20 December 2024 24

  25. Slide 25: Surface Water Quality – EC

    Surface Water Quality – EC 25 20 December 2024 25

  26. Slide 26: Groundwater Sampling Locations

    Groundwater Sampling Locations 26 20 December 2024 26

  27. Slide 27: Groundwater – Standing Depth

    Groundwater – Standing Depth 27 20 December 2024 27

  28. Slide 28: Groundwater – EC

    Groundwater – EC 28 20 December 2024 28

  29. Slide 29: Noise Monitoring

    Noise Monitoring Attended noise monitoring is conducted Monthly. There were no exceedences for the reporting period however a period of elevated noise was noted during the May attended monitoring which has been investigated and controls put in place to prevent a recurrence or potential exceedence of

  30. Slide 30: What else is going on?

    What else is going on? ▪ Weed Management • Weeds along Bowmans Creek including Boxthorn and Castor Oil Plant. ▪ Feral animal control • Dog baiting and licences shooters ▪ Interseam staple shaft construction ▪ Wonnarua Mine Rehabilitation Services – 1 Alpha Street ▪ Gas wells and pipework constructio

  31. Slide 31: Boxthorn Mulching

    Boxthorn Mulching • During May ACOL undertook a Before significant program of weed mulching to remove woody weeds such as boxthorn and castor oil plant • Previous attempts to spray out boxthorn have had limited success especially on larger plants • The forestry mulcher shredded the plants allowing a

  32. Slide 32: Boxthorn Mulching

    Boxthorn Mulching Before 32 20 December 2024 After 32

  33. Slide 33: Boxthorn Mulching

    Boxthorn Mulching Before 33 20 December 2024 After 33

  34. Slide 34: Interseam Staple Shafts

    Interseam Staple Shafts • Interseam staple shaft construction has been completed via raised bore drilling methods between the ULD and the ULLD seam. • The shafts are approximately 30m long and 4-4.5m in diameter. • They do not reach the surface but rather connect the two seams to facilitate ventilat

  35. Slide 35: Wonnarua Mine Rehabilitation (WMR)

    Wonnarua Mine Rehabilitation (WMR) ▪ In 2003, Ashton Coal signed an agreement with the Wonnarua Nation Aboriginal Corporation. ▪ Ashton Coal agreed to promote and implement business opportunities for the Wonnarua People. ▪ WMR is a land management and nursery services company whose primary aim is to

  36. Slide 36: Glennies Creek Road – Adopt-a-spot

    Glennies Creek Road – Adopt-a-spot ▪ Ashton Coal joined forces with the Singleton Junior Rugby Club to clean up Glennies Creek road. ▪ On Sunday 19 July, a team of volunteers from the Singleton Junior Rugby Club collected 600 kg of rubbish from a 3.3 km stretch of Glennies Creek Road. 36 20 December

  37. Slide 37: Any Questions?

    Any Questions? 37 20 December 2024 37

Yancoal Australia — Corporate Update (July 2015) on 6ix