Sundance Resources Limited

Sundance Resources — Beadell Resources — Diggers & Dealers Mining Forum 2016

16 slides from Sundance Resources's conference presentation, August 2016

  1. Slide 1: Improving Gold Producer with Big Exploration Potential

    Improving Gold Producer with Big Exploration Potential Diggers & Dealers Mining Forum August 1 to 3, 2016 Picture taken from Monkey Hill looking north

  2. Slide 2: Disclaimer

    Disclaimer  Forward Looking Statements These materials include forward looking statements. Forward looking statements inherently involve subjective judgement and analysis and are subject to significant uncertainties, risks and contingencies, many of which are outside the control of, and may be unkn

  3. Slide 3: Investment Highlights

    Investment Highlights  100% owner of Tucano, Brazil’s third largest gold mine  Tucano operation improving – good physicals in the first half of 2016 – grade to double in the second half of 2016  Multi-million ounce gold resource1 with district scale exploration potential • Mineral resources 67.2

  4. Slide 4: Corporate Snapshot

    Corporate Snapshot CORPORATE INFORMATION: ASX BDR DAILY SHARE PRICE (A$) AND VOLUME (M) $0.55 40 Shares on Issue 1,055.1 Daily Volume Millions $0.50 Share Price (A$) Share Price (29 July 2016) $0.51 35 $0.45 Market Capitalisation A$M $538.1 30 $0.40 Cash & Bullion on Hand (30 Jun 2016) A$M1 $30.9 $0

  5. Slide 5: Strong Board of Directors and Management Team

    Strong Board of Directors and Management Team BOARD OF DIRECTORS  Craig Readhead – Non-executive Chairman (Ex Partner of Allion Legal)  Simon Jackson – CEO and Managing Director (Ex VP Corporate Development of Red Back Mining)  Glen Masterman – Non-Executive Director (VP Discovery and Chief Geolo

  6. Slide 6: June Quarter and First Half 2016 Operational Data

    June Quarter and First Half 2016 Operational Data Jun 2016 Jun 2015 Production Summary Unit % 1H16 1H15 % Quarter Quarter Total Waste Moved tonnes 4,336,492 3,166,897 37% 9,372,382 6,951,563 35% Ore Mined tonnes 601,428 394,951 52% 1,201,040 999,246 20% Total Material Moved tonnes 4,952,485 3,600,41

  7. Slide 7: Brazil – Underexplored Greenstone Belt

    Brazil – Underexplored Greenstone Belt  Favourable geological setting in Guiana Shield, Northeast Brazil  Mineral endowment exceeds 60 million ounces gold across multiple under-explored greenstone belts  Favourable fiscal terms • 15.25% Corporate Tax Rate • 2% Government royalties 7

  8. Slide 8: Tucano Mine Corridor: Under Explored

    Tucano Mine Corridor: Under Explored  Current resource 3.5 million ounces  Under-drilled 14 km mine corridor  Significant potential to increase resources  Property-wide drilling depth averages only 100 m  Five drill rigs on site  $7 million exploration plan for 2016 Mining Concession Plan 8

  9. Slide 9: Tap AB1, AB2 and D Sul

    Tap AB1, AB2 and D Sul  Major new source of high grade oxide only 2 km from the plant  Oxide mineralisation reaching depths in excess of 200 m  Tap AB1 & AB2 Trough Lodes remain open at depth – what happens in fresh?  Mining of a portion of the Tap AB2 Trough Lode around the end of 2016  Tap D

  10. Slide 10: Tap AB1 & AB2 Trough Lode

    Tap AB1 & AB2 Trough Lode Tap AB1 & 2 Trough Lode composite longsection showing location of drill results 10

  11. Slide 11: Neo Lode

    Neo Lode  The discovery of gold developed in a shear zone hosted by clastic schist  Newly identified mineralized structure  Opens up a new target trend that has almost no previous drilling  Drilling at Neo Lode has confirmed the presence of a steeply east dipping mineralised structure 80 metres

  12. Slide 12: Duckhead Underground Potential

    Duckhead Underground Potential  19,000 tonnes @ 34.0 g/t to be mined in the second half of 2016  High grade now intercepted in fresh rock  New results:  FVM560: 48 m @ 11.62 g/t from 66 m including 3 m @ 87.79 g/t from 97 m and 4 m @ 49.1 g/t from 124 m  FVM561: 10 m @ 13.81 g/t from 81 m Duckh

  13. Slide 13: Mutum

    Mutum  Reconnaissance drilling at the early-stage at the 100% owned Mutum target, 20 km east of Tucano, verifies the origin of the 4 km gold-in-soil anomaly  New results include: 2 m @ 4.71 g/t from 8 m to bottom of hole; 7 m @ 5.13 g/t from 6 m including 3 m @ 9.95 g/t from 6 m; and 2 m @ 1.13 g/

  14. Slide 14: Tropicana East – Western Australia

    Tropicana East – Western Australia  60 km northeast of Tropicana Gold Mine  9,000 m drill program will commence in the September quarter  Multiple drill targets Tropicana East location of drill targets 14

  15. Slide 15: Summary

    Summary  Successful first eight months of turnaround  Exploration showing very positive signs – both short and long term  Physical operations vastly improved from 2015  Head grade to double in the second half of 2016  Potential for district scale play 15

  16. Slide 16: Simon Jackson

    Simon Jackson CEO & Managing Director Telephone: +61 8 9429 0800 info@beadellresources.com.au / www.beadellresources.com.au

Beadell Resources — Diggers & Dealers Mining Forum 2016 on 6ix