Equus Mining — Shareholder Meeting (November 2012)
18 slides from Equus Mining's shareholder meeting presentation, Nov 26, 2012
Slide 1: Presentation to Annual General Meeting cover letter to ASX
To be renamed “Equus Mining Limited” For personal use only 26 November 2012 The Manager Companies ASX Limited 20 Bridge Street Sydney NSW 2000 (18 pages by email) Dear Madam, PRESENTATION TO ANNUAL GENERAL MEETING I attach a PowerPoint presentation which is to be delivered to the shareholders presen
Slide 2: Annual General Meeting Presentation
For personal use only To be renamed Equus Mining Limited (EQE) CHILE Annual General Meeting Presentation 26 November 2012
Slide 3: Capital Structure
Capital Structure For personal use only Ordinary Shares: 246.7M Options: 4.46M • 0.46M @ 30 cents, expiring 31 Oct 2013 • 4.0M @ 7.5 to 25 cents, expiring 13 Nov 2015 Share Price: 6 cents Market Capitalisation: $14.8M Cash and Liquid Assets*: $7.3M Top 20 Shareholders: 63% ASX Code: CIG (EQE) * Cash
Slide 4: Caspian (Equus) Board
Caspian (Equus) Board For personal use only Norm Seckold Ted Leschke Colin Carson Non-Executive Chairman Managing Director Non-Executive Director Juerg Walker Mike Sandy Marcelo Mora Non-Executive Director Non-Executive Director Company Secretary 3
Slide 5: Our People in Chile
Our People in Chile For personal use only Damien Koerber Lorenzo Araya (Site Foreman) Exploration Manager – South America and his Naltagua Field Crew Robert Perring Cristian Quintana Consultant Geologist Logistics Manager - Chile 4
Slide 6: Naltagua Copper - Overview
Naltagua Copper - Overview For personal use only Targeting*: 60Mt to 80Mt at 0.8% to 1.3% Cu • Located in one of the main copper producing belts • Close to infrastructure (75km from port of San Antonio) • Mining Leases (18.05km2) • Option to Purchase (exercisable Sept 2014 - $4.3M) • Historical Mini
Slide 7: Location
Location For personal use only South America Map Area Chile El Soldado Mine Anglo American 200Mt at 1.35% Cu Naltagua Copper District El Teniente Mine CODELCO Equus Mining Limited World’s Largest Cu-Mo Deposit Targeting* 60Mt to 80Mt at 0.8% to 1.3% Cu * The target size is conceptual in nature and s
Slide 8: Manto Model (Naltagua)
Manto Model (Naltagua) Araya-Trend For personal use only Chalcopyrite Zone El Gato-Trend Yerba-Trend Bornite Zone Fault Hydrothermal Breccia Black Shale Andesite Volcanics
Slide 9: El Soldado Mine
El Soldado Mine For personal use only • 135km north of Naltagua • 200Mt at 1.35% Cu • Coastal Metallogenic Belt (like Naltagua) • La Prado Formation (like Naltagua) • Andesite host rock (like Naltagua) • Strong structural control (like Naltagua) • Open-pit and Underground Mining (open-stope)
Slide 10: Naltagua Copper System
Naltagua Copper System For personal use only Yerba Project Yerba Mine Araya Project Naltagua Copper System Equus Option Area Copper Occurrence 2km
Slide 11: Yerba Project Area, Naltagua
Yerba Project Area, Naltagua For personal use only Phase 1 Drilling Area Channel sections limited by outcrop 33m @ 0.88% Cu 48m @ 1.35% Cu Yerba Workings 55m @ 0.27% Cu 10m @ 1.73% Cu 20m @ 0.52% Cu High Resistivity (Geophysical Anomaly) Surface Rock Channel Geochemistry (2m & 5m composites) 500m Ou
Slide 12: Yerba Mine (Metallurgy)
Yerba Mine (Metallurgy) For personal use only Copper Sulphide (Bornite) Adit Metallurgical Sample Site Yerba Structural Trend • 30kg ALS Ammtec, Sydney • Premium sulphide concentrate (41% Cu, 463g/t Ag) • +75% recovery in partially oxidised ‘ore’ ( considerable upside) • Silver (Ag) reporting with c
Slide 13: Yerba Mine - Longsection
Yerba Mine – Longsection For personal use only 600m RL adit Pit Wall: 48m @ 1.3% Cu 34m @ 0.6% Cu Yerba Open Pit 550m RL adit 56m @ 1.1% Cu adit 60m @ 1.7% Cu adit 55m @ 0.1% Cu 40m @ 0.6% Cu adit 500m RL 40m @ 1.1% Cu 40m @ 0.4% Cu adit 50m @ 0.2% Cu 50m
Slide 14: Yerba Mine
Yerba Mine For personal use only 48m @ 1.35% Cu Yerba Pit (Historical Working – Early 1900’s) Drill Pad Drill Pad 48m @ 1.35% Cu Planned Initial Drill Holes IP Chargeability 200 metres
Slide 15: Naltagua Copper System
Naltagua Copper System For personal use only Yerba Project Yerba Mine Araya Project Naltagua Copper System Equus Option Area Copper Occurrence 2km
Slide 16: Araya Project
Araya Project For personal use only Araya Project Area 16m @ 1.9% Cu Underground (adit) 20m @ 0.65% Cu Surface Outcrop Hydrothermal Breccia Copper Working (Adit) Copper Occurrence (No Working) Rock Channel Geochemistry (2m & 5m composites) 500m
Slide 17: Disclaimer & Compliance
Disclaimer & Compliance This presentation has been prepared by Equus Resources Limited (“Equus”). The information contained in this presentation is a professional For personal use only opinion only and is given in good faith. Certain information in this document has been derived from third parties,
Slide 18: For personal use only
For personal use only CHILE www.equusmining.com 17