Champion Iron Ltd. · ASX:CIA

Champion Iron — Investor Presentation (September 2021)

51 slides from Champion Iron's investor presentation, Sep 27, 2021

  1. Slide 1: Investor Presentation September 2021

    INVESTOR PRESENTATION SEPTEMBER 2021 PREMIUM PRODUCT, TIER 1 JURISDICTION, HIGH QUALITY INFRASTRUCTURE CHAMPION IRON AX

  2. Slide 2: Disclaimer

    DISCLAIMER CHAMPION IRON 2 TSX: CIA | ASX: CIA | OTCQX: CIAFF ‘This presentation (the "Presentation”) contains information about Champion Iron Limited (the “Company*), current as at the date hereof or as at such earlier date as may be specified herein. This Presentation does not constitute or form p

  3. Slide 3: Corporate Overview

    CORPORATE OVERVIEW CHAMPION IRON 2a LARGEST PUBLICLY LISTED PURE-PLAY HIGH-GRADE IRON ORE PRODUCER GLOBALLY STRATEGIC LOCATION > Top Tier Jurisdiction > Established production in region since the 50‘s > 24 largest hub of high-grade exports globally > Access to infrastructure, including renewable hyd

  4. Slide 4: Health & Safety, COVID-19 Measures

    HEALTH & SAFETY, COVID-19 MEASURES CHAMPION IRON 23 TSX: CIA | ASX: CIA | OTCQX: CIAFF CONTINUOUS MONITORING AND IMPROVEMENT OF HEALTH AND SAFETY PROTOCOLS > Overall improvement of health and safety QUEBEC IRON ORE + CONTRACTORS statistics year over year FISCAL PERIODS 2019 2020 2021 Total Recordabl

  5. Slide 5: Focus on Sustainability

    CHAMPION IRON 24 TSX: CIA | ASX: CIA | OTCQX: CIAFF FOCUS ON SUSTAINABILITY NO OCCURRENCE OF MAJOR ENVIRONMENTAL ISSUES SINCE RECOMMISSIONING THE BLOOM LAKE MINE IN FEBRUARY 2018 Recognizing the importance of establishing strong governance for the { { y \ Environmental Social and Governance (“ESG")

  6. Slide 6: A Global Solution for the Transitioning Steel Industry

    A GLOBAL SOLUTION FOR THE CHAMPION IRON 24 TRANSITIONING STEEL INDUSTRY TSX: CIA | ASX: CIA | OTCOX : CIAFF

  7. Slide 7: Need for a Solution

    CHAMPION IRON 24 TSX: CIA | ASX: CIA | OTCQX: CIAFF NEED FOR A SOLUTION THE STEEL INDUSTRY IS ONE OF THE LARGEST SOURCES OF CO2 EMISSIONS GLOBALLY > While the iron ore industry represents 0.2% of global emissions, the steel industry has increased its share of global emissions fram 5% to 8% in the la

  8. Slide 8: Major Steel Producers Decarbonization Targets

    ⎪ ⎪ ° ▪ ▪ ▪ MAJOR STEEL PRODUCERS DECARBONIZATION TARGETS 30% Net-Zero 30% Net-Zero 20% Net-Zero 30-40% Net-Zero 35% Working Towards Net-Zero 30% Net-Zero 20% 50% Net-Zero 30% 35% Net-Zero 30-40% Net-Zero 30% Net-Zero

  9. Slide 9: Contributing to Reduce Emissions

    CONTRIBUTING TO REDUCE EMISSIONS CHAMPION IRON 2a BLOOM LAKE PRODUCES ONE OF THE HIGHEST QUALITY IRON ORE PRODUCTS GLOBALLY WHICH CONTRIBUTES TO REDUCING EMISSIONS IN THE STEEL MAKING PROCESS > The Company commercially produces a 66.2% Fe iron ore concentrate and a >67.5% Fe Direct Reduction (DR) qu

  10. Slide 10: Emission Reductions

    CHAMPION IRON 2 TSX: CIA | ASX: CIA | OTCQX: CIAFF EMISSION REDUCTIONS IN ADDITION TO ITS LEADING POSITION AS A LOW EMISSION PRODUCER, CHAMPION’S PRODUCTS SIGNIFICANTLY REDUCE GLOBAL EMISSIONS BF/BOF EAF a > Atthe Phase Il expected nameplate capacity of > At the Phase Il expected nameplate capacity

  11. Slide 11: Low Emission Footprint

    LOW EMISSION FOOTPRINT CHAMPION IRON 2a THE LABRADOR TROUGH, INCLUDING CHAMPION’S BLOOM LAKE MINE, HOLDS A LEADING POSITION ON EMISSION INTENSITY COMPARED TO OTHER HIGH-GRADE IRON ORE PRODUCING HUBS > Champion’‘s leading position advantaged by its high-grade product, access to renewable hydropower a

  12. Slide 12: Active Project Pipeline

    ⎪ ⎪ Active Project 10 Pipeline Project 1 2 4 Both Active/ Pipeline 5 Est. Spare Port # Project / Renewable Distance to Capacity Marketable Portfolio Energy Port (Km) (Mtpa)6 Reserves NA1 (Bn MT) 3 MetalloInvest 1 (Russia) 800+ Rest of 1 2 Canada4 429 Est. 3 S11D 975 Reserves + Resources Champion (Bn

  13. Slide 13: Bloom Lake History and Recent Results

    BLOOM LAKE HISTORY CHAMPION IRON 2 AND RECENT RESULTS TSX: CIA | ASX: CIA | OTCOX : CIAFF

  14. Slide 14: Timeline & Cumulative Total Investment

    ⎪ ⎪ TIMELINE & CUMULATIVE TOTAL INVESTMENT ◼ ◼ ◼ ◼ ◼ ◼ ◼ ◼ ◼ ◼ ◼ ◼ ◼ ◼ ◼ — ◼ — — ◼ — — ◼ — — ◼ —

  15. Slide 15: Bloom Lake Today

    BLOOM LAKE TODAY CHAMPION IRON 2s STABLE OPERATIONAL RESULTS FOLLOWING SIGNIFICANT INVESTMENTS MADE SINCE THE RESTART OF BLOOM LAKE IN 2018 > Achieved highest annual production on record > Structural changes implemented resulting on significant cost reduction BLOOM LAKE PRODUCTION HISTORY TOTAL CASH

  16. Slide 16: Operational Highlights

    OPERATIONAL HIGHLIGHTS CHAMPION IRON 2a TSX: CIA | ASX: CIA | OTCQX: CIAFF ORE RECOVERY (%) & TONNES > Consistent operational results since 2018 commissioning MILLED (M WMT) (excluding COVID-19 temporary ramp-down) > Set annual Bloom Lake production record of 8.0M wmt in FY2021 8 20 E and reported r

  17. Slide 17: Financial Results

    FINANCIAL RESULTS CHAMPION IRON 24 TSX: CIA | ASX: CIA | OTCQX: CIAFF $819.5M EBITDA FY2021 $470.7M Adjusted net income HIGHLIGHTS $623.5M Net cash flow from operations > Reported several financial quarterly record results in Q1/FY2022 > Bloom Lake not encumbered by streams or royalties FINANCIAL RE

  18. Slide 18: Premium Pricing

    PREMIUM PRICING CHAMPION IRON 24 TSX: CIA | ASX: CIA | OTCQX: CIAFF PREMIUM REALIZED PRICE (FY2021) > FY2021 gross realized price, including provisional price adjustments, of US$147.8/t, which is above the P65 high grade index average of US$143.7/t > Q1/FY2022 gross average realized sale price of US

  19. Slide 19: Strong Financial Position

    STRONG FINANCIAL POSITION CHAMPION IRON 24 TSX: CIA | ASX: CIA | OTCQX: CIAFF Liquidity Summary AS AT JUNE 30, 2021 Cash & S-T Investments $423.3M { Restricted cash* $43.4M Working capital $126.8M a Long-Term Debt* $253.1M III { Available & undrawn loans* $410.6M penne ays 1 Netcash* s. H improvemen

  20. Slide 20: Capital Market Highlights

    CAPITAL MARKET HIGHLIGHTS CHAMPION IRON 2s MARKET CAPITALIZATION: $2.3B* : , Family office Management & Directors*, 10.6% VOLUME TRADED BY MARKET & retail, (MILLION SHARES) 50.4% 200 ° Wynnchurch 150 Capital, 8.3% 100 44% 93% . Investissement 80 58% 47% Québec, 8.6% Qe/FY21 Q3/FY21 Q4/FY21 Q1/FY22 w

  21. Slide 21: Product Development and Growth Initiatives

    PRODUCT DEVELOPMENT CHAMPION IRON 24 AND GROWTH INITIATIVES TSX: CIA | ASX; CIA | OTCQX : CIAFF

  22. Slide 22: Growth Opportunities

    GROWTH OPPORTUNITIES CHAMPION IRON 2s PROJECT PIPELINE ts rF Ss gm OPERATING UNDER CONSTRUCTION STUDY STAGE DEVELOPMENT CONSOLIDATED FIRE LAKE BLOOM LAKE BLOOM LAKE KAMI PROJECT MOIRE LAKE PHASE | PHASE II 7.8 MTPA* QUINTO LAC LAMELEE 7.4 MTPA 15 MTPA* FIRE LAKE NORTH HARVEY TUTTLE 9.3 MTPA* O'KEEFE

  23. Slide 23: Labrador Trough - A World-Class Opportunity

    LABRADOR TROUGH - A WORLD-CLASS OPPORTUNITY CHAMPION IRON 2s Value Proposition Summary sa.teoenit > Access to railway Haney tutes > Newly built deep-water port Facsleen 3s > Access to skilled labour ve i > Low-cost electricity @ $0.045/KWh Jeanine Cake > Bloom Lake: = Expected Phase Il nameplate cap

  24. Slide 24: Bloom Lake Phase II Projects

    BLOOM LAKE PHASE II PROJECTS CHAMPION IRON 2a TSX: CIA | ASX: CIA | OTCQX: CIAFF PROJECT ADVANCING AS PLANNED WITH STRONG ECONOMICS ON CONSERVATIVE ASSUMPTIONS > Expected to double capacity from 7.4 Mtpa to 15 Mtpa CAPEX PRE-PRODUCTION > 20-year mine life {C$M) {US$M) |General 28.2 21.4 > Takes adva

  25. Slide 25: Phase II - Advanced Project

    PHASE II - ADVANCED PROJECT CHAMPION IRON 2 TSX: CIA | ASX: CIA | OTCQX: CIAFF APPROVED AND FULLY FINANCED PROJECT SCHEDULED FOR COMPLETION BY MID-2022* > Cumulative work programs of $263.6M as of June 30, 2021* INDUSTRY CAPITAL INTENSITY (US$/T OF CAPACITY) $250 $200 $150 $100 * [| $e | Greenfield

  26. Slide 26: Bloom Lake Area Opportunities

    BLOOM LAKE AREA OPPORTUNITIES CHAMPION IRON 2s ADDITIONAL OPPORTUNITIES IN IMMEDIATE VICINITY OF THE BLOOM LAKE MINE Montagne du Chef Pit > Significant historical drilling highlights iron ore outside of current reserves at Bloom Lake* Bloom Weseel > Several magnetic anomalies outside of Bloom Lake c

  27. Slide 27: Kami Project

    KAMI PROJECT CHAMPION IRON 29 TSX: CIA | ASX: CIA | OTCQX: CIAFF ON APRIL 1, 2021, CHAMPION COMPLETED THE ACQUISITION OF THE KAM! PROJECT, A HIGH- GRADE IRON ORE PROJECT NEAR AVAILABLE INFRASTRUCTURE, STRATEGICALLY LOCATED ONLY A FEW KILOMETRES SOUTH EAST OF BLOOM LAKE > Work has been initiated to r

  28. Slide 28: Positioning for the Future

    POSITIONING FOR THE FUTURE CHAMPION IRON 2s GLOBAL SCALE OPPORTUNITY FOR HIGH-GRADE IRON ORE DEVELOPMENT > Directly south and within 60 kilometres of the Bloom Lake mine, Champion controls a hub of 5 iron rich properties, including Consolidated Fire Lake North, Lac Lamélée, Quinto claims, Harvey Tut

  29. Slide 29: Steel Industry Going Green

    STEEL INDUSTRY GOING GREEN CHAMPION IRON 24 TSX: CIA | ASX: CIA | OTCQX: CIAFF DR PELLET FEED IS IN RISING DEMAND TO DECARBONIZE STEEL PRODUCTION Current Offering: High Grade Concentrate Moving Towards: Direct Reduction ("DR") Grade Concentrate > A 66.2% Fe concentrate that trades at a premium relat

  30. Slide 30: Continuous Product Improvement

    CONTINUOUS PRODUCT IMPROVEMENT CHAMPION IRON 2s INITIATED A RESEARCH & DEVELOPMENT PROGRAM TO SUPPORT THE STEELMAKING TRANSITION FROM BF TO DR-EAF TRADITIONAL PELLETS 4 > Ongoing laboratory testing and development of Cold Pelletizing Technologies, following a financing contribution with a European b

  31. Slide 31: Advanced Technologies

    ADVANCED TECHNOLOGIES CHAMPION IRON 2s IMPLEMENTING ADVANCED SOLUTIONS TO MAXIMIZE EFFICIENCIES > Announced a collaborative relationship with Caterpillar and Toromont Cat to develop, test and implement a suite of advanced technologies on Cat equipment at Bloom Lake using proprietary artificial intel

  32. Slide 32: Sales, Market and Product Positioning

    SALES, MARKET AND CHAMPION IRON 23 PRODUCT POSITIONING TSX: CIA | ASX: CIA | OTCQX : CIAFF

  33. Slide 33: Premium Industry Position

    PREMIUM INDUSTRY POSITION CHAMPION IRON 24 TSX: CIA | ASX: CIA | OTCQX: CIAFF PROVEN COST STRUCTURE... > Benefiting from premium pricing, Champion currently ranks as a cost leader within the industry (62% Fe equivalent) > Product quality premium offsets freight differential when compared to Australi

  34. Slide 34: Diversified Customer Base

    DIVERSIFIED CUSTOMER BASE CHAMPION IRON 29 TSX: CIA | ASX: CIA | OTCQX: CIAFF > Procured 3 new customers in 2021 fiscal year and engaged 26 different customers since commissioning of Bloom Lake in February 2018 > Diversified global sales mix unaffected despite the impact of the COVID-19 pandemic on

  35. Slide 35: Growing Industry Lack of Investments

    GROWING INDUSTRY LACK OF INVESTMENTS CHAMPION IRON 2a STEEL OUTPUT IS RISING FASTER THAN IRON ORE SUPPLY IN MAJOR HUBS > Lack of development capital over the last 5-years, resulting in limited iron ore export growth from major hubs GLOBAL IRON ORE INDUSTRY AUSTRALIA + BRAZIL DEVELOPMENT CAPITAL (US$

  36. Slide 36: Industry Decline in Quality

    CHAMPION IRON 24 TSX: CIA | ASX: CIA | OTCQX: CIAFF INDUSTRY DECLINE IN QUALITY > Industry average grade has gradually declined over the last three decades SINTER FEED AVERAGE SINTER FEED AVERAGE 9 while contaminants have increased 63.9% FE % GANGUE % > Rising contaminant issues in major 62.9% iron

  37. Slide 37: Additional Material

    ADDITIONAL MATERIAL CHAMPION IRON 24 TSX: CIA | ASX: CIA | OTCQX : CIAFF

  38. Slide 38: Environmentally Focused

    ENVIRONMENTALLY FOCUSED CHAMPION IRON 2s > No occurrence of a major environmental issue to date > Implemented new initiatives that resulted in over 12 million litres (ML/yr) of fuel reduction, representing 33,000 t/yr of greenhouse gas reduction > 95% of all water consumption sourced from reused and

  39. Slide 39: Experienced Team

    EXPERIENCED TEAM CHAMPION IRON 24 TSX: CIA | ASX: CIA | OTCQX: CIAFF MANAGEMENT TEAM Michael O'Keeffe Executive Chairman David Cataford CEO and Director Natacha Garoute CFO Alexandre Belleau coo Steve Boucratie Senior Vice-President, General Counsel and Corporate Secretary Michael Marcotte, Senior V

  40. Slide 40: Board Members

    CHAMPION IRON 24 B OAR D M E M B E R S TSX: CIA | ASX: CIA | OTCQX: CIAFF NON EXECUTIVE DIRECTORS Andrew J. Love, B.Comm, MAICD Lead Director Michelle Cormier Director Jyothish George Director Louise Grondin Director Gary Lawler, BA, LLB, LLM Director Wayne Wouters (The Honourable), PC Director Mr.

  41. Slide 41: Asset Snapshot

    ⎪ ⎪ 1 Mining 2 Crushing 3 Concentrating 4 Rail 5 Port Co Asset Snapshot Typical blast and shovel Crushed in near-pit Upgrading the ~30% Fe Transported by rail from Agreement with mining operations crusher and conveyed to 66% Fe loading station at Bloom Government of Quebec Trucked to near-pit crushe

  42. Slide 42: Tailings Management

    TAILINGS MANAGEMENT CHAMPION IRON 24 TSX: CIA | ASX: CIA | OTCQX: CIAFF CHAMPION’S TAILINGS MANAGEMENT IS ADOPTING A CONSERVATIVE APPROACH > > > Fine and coarse tailings separation representing 12% & 88%, respectively 10:1 slope for upstream dam construction vs. industry standard of 6:1 Fines manage

  43. Slide 43: Phase II - Feasibility Study

    CHAMPION IRON 29 TSX: CIA | ASX: CIA | OTCQX: CIAFF PHASE II - FEASIBILITY STUDY COMBINED PHASE | & II (JUNE 2019) SUMMARY OF ECONOMIC PARAMETERS AND FEASIBILITY RESULTS — PHASE | & II (COMBINED) Reserve (Mt) 807.0 Processed Tonnage (Mtpa) 41.6 Average Stripping Ratio (waste:ore) 0.88 . Average Fe F

  44. Slide 44: Bloom Lake Reserves & Resources

    BLOOM LAKE RESERVES & RESOURCES CHAMPION IRON 2 TSX: CIA | ASX: CIA | OTCQX: CIAFF PHASE II —- FEASIBILITY STUDY Mineral Resource Estimate for Bloom Lake Tonnage (dry) (M Category dmt) Fe (%) CaO (%) Sat (%) MgO (%) Al,0(%) Measured 379.1 30.2 14 4.4 14 0.3 Indicated $14.4 28.7 2.5 77 2.3 0.4 Total

  45. Slide 45: Company Projects Mineral Resources & Reserves

    COMPANY PROJECTS MINERAL RESOURCES & RESERVES CHAMPION IRON 2 TSX: CIA | ASX: CIA | OTCQX: CIAFF PROPERTY CHAMPION IRON LIMITED - MINERAL RES GROUP MEASURED Mt Fe% ON DRY METR INDICATED Mt Fe% MEAS + IND Mt Fe% INFERRED Mt Fe% SOURCE Bioam Lake Phase ll proven and probable reserves are based on the

  46. Slide 46: Bloom Lake Phase II

    BLOOM LAKE PHASE II CHAMPION IRON 24 TSX: CIA | ASX: CIA | OTCQX: CIAFF POSITIONING AS A GLOBAL LEADER BY PRODUCTION AND RESERVES > Focus on creating value per share > With most high-grade iron ore production coming from Brazil and globally integrated steel makers, Champion is one of the only indepe

  47. Slide 47: Bloom Lake Mine Site

    CHAMPION IRON 24 TSX: CIA | ASX: CIA | OTCQX: CIAFF BLOOM LAKE MINE SITE THE MINE SITE CONSISTS OF THREE PITS, A TAILINGS COMPLEX AND PROCESSING FACILITY, A VIRTUAL SITE VISIT IS AVAILABLE AT WWW.CHAMPIONIRON.COM

  48. Slide 48: World Class Port Infrastructure with Access to Deep Water Berth

    CHAMPION IRON 24 TSX: CIA | ASX: CIA | OTCQX: CIAFF WORLD CLASS PORT INFRASTRUCTURE WITH ACCESS TO DEEP WATER BERTH MULTI-USER PORT 48

  49. Slide 49: Champion Iron Structural Improvements

    CHAMPION IRON 2 TSX: CIA | ASX: CIA | OTCQX: CIAFF STRUCTURAL IMPROVEMENTS INVESTMENTS CONTRIBUTING TO COST REDUCTIONS SINCE THE RECOMISSIONING IN 2018 New multi-user berth New 3.5km overland conveyor Ep FE laity New tailings pumping system 49

  50. Slide 50: Appendix: Notes on Historical Estimates

    APPENDIX CHAMPION IRON 2s NOTES ON HISTORICAL ESTIMATES USED IN THE PRESENTATION 1. The historical Kami Project resource estimates are based on the National Instrument 43-101 technical report entitled "Feasibility Study of the Rose Deposit and Resource Estimate for the Mills Lake Deposit of the Kami

  51. Slide 51: Thank You

    THANK YOU! SAN Senior Vice- President: Poeste Development and Capital Markets mmarcotte(@championiron. com head tuatl inal il 514-32624858

Champion Iron — Investor Presentation (September 2021) on 6ix