Catalyst Metals Limited · ASX:CYL

Catalyst Metals — Investor Presentation (February 2012)

29 slides from Catalyst Metals's investor presentation, Feb 13, 2012

  1. Slide 1: Investor Presentation

    Investor For personal use only P Presentation i 13 February 2012 Bruce Kay Non-Executive Director

  2. Slide 2: Company Objectives

    For personal use only C Company Obj Objectives ti  To create shareholder value by pursuing advanced gold and metals projects  Develop a defined economic resource at Four Eagles Gold Project in Victoria  Exercise option p on Unityy Gold Plant at Bendigo g to process gold from Four Eagles Early cas

  3. Slide 3: Projects: Minnie Springs, Everton, Four Eagles

    For personal use only Mi i Springs Minnie S i Molybdenum Tungsten Project Everton Molybdenum Project Four Eagles Gold Project

  4. Slide 4: 2011 highlights and share price

    For personal use only  Major drilling campaigns in 2011 (13,187 metres)  Option Agreement signed to purchase Unity Gold Plant  Shallow high grade gold intersected  Gold footprint now 5 kms x 3 kms  Four possible ibl Goldld Lines i off Lode d defined d fi d Cents 50 C t l t Share Catalyst Sh Pri

  5. Slide 5: Tandarra project and gold belt map

    For personal use only 230,000mE Pyramid 250,000mE 270,000mE 290,000mE NORTH  Major gold belt 6,000,000mN EL5295 V I C T O R I A NSW Echuca emerging north of Four Eagles F E l Bendigo Prospective Mitiamo Target EL4525 Lockington  Totally concealed by Tandarr Whitela 5,980,000mN Murrayy Basin a Roch

  6. Slide 6: Bendigo-Ballarat gold zone

    For personal use only Go 143º ve rn 145º Bendigo - Ballarat DPI or F au N S. N. S W W. Gold Zone predicts lt S ys 32 Mozs tem Whitela  60 million ounces produced 38º Four Eagles g Gold Project j w Fault  2 Deposits p > 10 million ounces  5 deposits > 1 million ounces VICTORIA Fault Bendigo 60 Moz

  7. Slide 7: Bendigo goldfield production by year

    For personal use only ‘000 oz Au PRODUCTION BY YEAR BENDIGO GOLDFIELD FIRST 11 YEARS 1,000 Alluvial oz Au Lode oz Au TOTAL oz Au 300,000 300 000 800 Alluvial ounces 4.0 Moz 700,000 Reef ounces 18.0 Moz 980,000 600 Total 22.0 Moz 620,000 650,000 880,000 400 750,000 730,000 200 690,000 570,000 410,000

  8. Slide 8: Bendigo goldfield lines of lode

    For personal use only New Chum Line Bendigo Goldfield 7.9mt @15.1g/t Au Nell Gwynne Li Line (3,850,000oz) Line of Lodes Garden Gully Line 10.8mt @15.0g/t Au  18 million ounces e (5,203,000oz) ction Zon BENDIGO Hustlers Line reef gold 1.6mt @17.6g/t Au o du (918,000oz) 4 million ounces Historrical P

  9. Slide 9: Garden Gully Line of Lode (South)

    For personal use only SOUTH Garden Gully Line of Lode (South) 500RL 249,000 oz (18.0g/t Au) 825,000 oz (19.2g/t Au) 1.372 Moz (13.3g/t Au) 0RL -500RL LEGEND 1,000 metre depth 0 1000 -1000RL Historic Stoping Metres 124 000mN 124,000mN 125 000mN 125,000mN 126 000mN 126,000mN 127 000mN 127,000mN TOTAL

  10. Slide 10: Garden Gully Line of Lode (North)

    For personal use only SOUTH Garden Gully Line of Lode (North) NORTH 500RL 1.070 Moz (17.0g/t Au) 1.014 Moz (14.2g/t Au) 693,000 oz (13.4g/t Au) 0RL -500RL LEGEND 1,000 metre depth 0 1000 Historic Stoping -1000RL Metres 128,000mN , 129,000mN , 130,000mN , 131,000mN , 132,000mN , TOTAL GARDEN GULLY PR

  11. Slide 11: Exploration approach

    For personal use only  Not trying to prove the old timers wrong  Not spending p g$$50 - $ $100 million below old workings g  Looking for virgin discoveries under shallow cover  Cheap exploration using Aircore ($2,000 per hole)  Potential open pit or shallow underground will negate nugget proble

  12. Slide 12: High grade gold intercepts

    For personal use only 6m @ 82.7g/t Au (FE328) 1m @ 18 18.3g/t 3g/t Au (FERC002) 3m @ 31.3g/t Au (FE415) 1m @ 17.5g/t Au (FEDD001) 5mm 3m @ 9.7g/t Au (FE380)

  13. Slide 13: Drillhole intersections map

    é catalyst METALS LTD a ee \ 316 (3.85kmi\north) old e _ 5,990,000m 5,988,000mN 242,000mE| suey paved — 2 euep! a) TARGET ( NorTH Drillhole Intersections (>0.2g/t Au) FE297 6m @ 0.45g/t Au from 78m FE299 3m @ 0.39g/t Au from 126m FE305 3m @ 0.38g/t Au from 75m FE316 3m @ 0.27g/t Au from 102m FE319 3

  14. Slide 14: Four Eagles Cross Section 5989369N

    For personal use only Four Eagles Cross Section 5989369N FE415 FERC001 FE472 FERC002 100m d ne COVER do 80m an SEDIMENTS ab 60m 3m @ 1.3g/t Au OXIDISED / SAPROLITIC 3m @ 1.0g/t Au BASEMENT 6m @ 2.4g/t Au 3m @ 1.3g/t Au 40m 2m @ 1.8g/t Au ORDOVICIAN 3m @ 31 31.3g/t 3g/t Au 1m @ 0.55g/t Au BASEMENT Go

  15. Slide 15: Four Eagles Cross Section

    For personal use only Four Eagles Cross Section Proposed Diamond Drillholes 2012 5988925mN FE300 FE299 FE328 FE298 FE329 FE297 FE330 FE296 FE331 FE295 FE294 02 1 0 HP HP DD DD 0m 3m @ 0.51g/t Au, from 78m 3m @ 0.59g/t Au from 123m 3m @ 0.29g/t Au from 81m 6m @ 82.7g/t Au from 123m; 0.7m @ 4.83g/t Au

  16. Slide 16: Four Eagles Gold Footprint

    For personal use only Four Eagles Gold Footprint NORTH of Bendigo Goldfield Whiti ela 0 4  Bendigo kilometres INSET Drillholes w EL5295 0.2 to 0.5 g/t Au 0.5 to 1.0 g/t Au 8km x 3km Fault 1.0 to 5.0 g/t Au > 5.0 g/t Au Prospective target trend  Four Eagles Gold Zone As Zone SEE Fault INSET Railway

  17. Slide 17: Aircore drilling and gold trends

    For personal use only 240,000mE 250,000mE Drillholes EL5295 2011 Aircore (Catalyst) 6,000,000mN 0.2 to 0.5 g/t Au Ra 0.5 to 1.0 g/t Au ilw ay 1.0 to 5.0 g/t Au > 5.0 g/t Au Gold Zone Arsenic Zone Catalyst & Navarre Main Road GOLD TRENDS Note: No Arsenic data available for Navarre 5,990,000mN Mitiamo

  18. Slide 18: Next exploration steps and objective

    For personal use only  Large gold footprint in oxidised zone with high grades but little testing below  Angled RC and Diamond drilling of Lines of Lode  Geophysics (CSAMT) to map quartz veins  Further Aircore drilling (10,000 metres) along Whi l Fault Whitelaw F l Objective: Minimum 150,000 150

  19. Slide 19: Heads of Agreement

    For personal use only Heads of Agreement Initial Phase $2 100 000 exploration spend by January 2014 to earn 50%  $2,100,000 interest in project with approx. $800,000 spent to date $$100,000 , cash (payable (p y before 20 March 2012))  750,000 CYL shares (to be issued before 20 March 2012) At Farm

  20. Slide 20: Unity Gold Plant

    For personal use only  600,000 tpa  Original cost approx. $65M  Built in 2006  Gravity/CIL  90% recovery  Exploration ground

  21. Slide 21: Option Agreement

    For personal use only Option Agreement Pre exercise $100 000 cash at signing to secure 12 month option  $100,000  1,000,000 CYL shares escrowed for 6 months  3 x $100,000 cash payable quarterly over 12 month option period with right to withdraw at any time  Unity to keep tenements in good standi

  22. Slide 22: Gascoyne molybdenum-tungsten project

    For personal use only 380,000mE 400,000mE 420,000mE Catalyst Metals Tungsten in Rock (%W) Gascoyne Mo-W >0.5% 0.05 - 0.5% Project 7,336,200mE <0 05% <0.05% 0 200 7,340,000mN Metres 7,335,800mE , , E0901776 E0901174 389,400mE 389,800mE Nina Tungsten Project 7 320 000mN 7,320,000mN 4 23m @ 0.16% & 17m

  23. Slide 23: Everton molybdenum project

    For personal use only 0 mN 9,570,000 462,100 462,200 462,300 Visible Molybdenum mE mE mE Beechworth Rock sample points 5,000 to 18,400 Wangaratta 1,000 to 5,000 qua 500 to 11,000 000 rry lim EL4866 it 0 to 500 Mine adit Everton Historic workings Felsic Intrusive Sediments Canberra 5,969,80 0mN Evert

  24. Slide 24: Capital Structure

    For personal use only Capital Structure (ASX:CYL)  41,344,369 fully paid ordinary shares – 1,000,000 1 000 000 unlisted li t d 20 centt options ti expiring i i 30/06/2014 – 1,000,000 unlisted 30 cent options expiring 30/06/2015 – 1,000,000 , , unlisted Performance Rights g  Top 20 control approxim

  25. Slide 25: Share Purchase Plan and Bonus Issue

    For personal use only Share Purchase Plan  $0.40 per share – 8.7% discount to 5 day VWAP  Shareholders can apply for up to $15,000 $15 000 each  Maximum shares that can be issued is 12.4 million to raise $4.96 million  Timetable: – Opens 15 February 2012 / Closes 14 March 2012 – Issue shares 20

  26. Slide 26: Board of Directors

    For personal use only Stephen Boston – Non-executive Chairman The principal of a Perth-based private investment group specialising in the Australian resources sector. Previously worked as a Stockbroker from 1984 to 1998 in Perth and Sydney. Sydney Bruce Kay – Non-executive Director Bruce was previou

  27. Slide 27: Advisors and Competent Person's Statement

    For personal use only Advisors John Arbuckle – Corporate Advisor John is an accountant with extensive experience in the resources industry in Australia and overseas. Currently he operates a corporate advisory business that provides corporate and capital financing advice to resource industry companie

  28. Slide 28: Disclaimer

    For personal use only  This Thi presentation t ti hash been b prepared d by b Catalyst C t l tMMetals t l Li Limited it d (“C (“Catalyst”). t l t”) Thi This d documentt contains t i b background k d information about Catalyst current at the date of this presentation. The presentation is in summary

  29. Slide 29: Investor Presentation

    Investor For personal use only P Presentation i 13 February 2012 Bruce Kay Non-Executive Director

Catalyst Metals — Investor Presentation (February 2012) on 6ix