Hudbay Minerals — RBC Mining & Materials Conference 2022

69 slides from Hudbay Minerals's conference presentation, Jun 8, 2022

  1. Slide 1: Investor Presentation June 2022

    INVESTOR PRESENTATION June 2022

  2. Slide 2: Cautionary Information

    CAUTIONARY INFORMATION This presentation contains forward-looking information within the meaning of applicable Canadian and United States securities legislation. All information contained in this presentation, other than statements of current and historical fact, is forward-looking information. Ofte

  3. Slide 3: Hudbay

    H' DBAY

  4. Slide 4: Revenue and Resources by Metal

    REVENUE AND RESOURCES BY METAL Revenue1 Resources2 DIVERSIFIED MID-TIER 9% 2% 1% 7% COPPER PRODUCER 4% Cu Au 7% 4% 16.9Mt ~20% year-over-year growth in $1.8B Ag 25% Zn CuEq.2 60% copper production and ~30% Mo growth in gold production in 81% 2022 Existing operations offer ANNUAL COPPER PRODUCTION &

  5. Slide 5: Copper Demand Drivers

    COPPER DEMAND DRIVERS GROWING DEMAND FOR “GREEN” COPPER Global De-carbonization Copper is one of the most heavily utilized metals in renewable energy systems and is the least carbon- intensive Electrification of Vehicles EVs require nearly 4x more copper than a conventional gas vehicle EV production

  6. Slide 6: Copper Supply Gap

    COPPER SUPPLY GAP GLOBAL COPPER MINES AND PROJECTS UNABLE TO MEET LONG-TERM DEMAND EXPECTATIONS Mt Base Case Production Capability Declining Copper Grades 35 Probable Projects Primary Demand Global copper resources continue to be 30 depleted and the average mined copper grade has declined by more th

  7. Slide 7: Hudbay Copper Growth Pipeline

    HUDBAY COPPER GROWTH PIPELINE LEADING FREE CASH FLOW GROWTH AND SIGNIFICANT COPPER RESOURCE OPTIONALITY Meaningful near-term free cash flow growth with high quality organic pipeline offering significant long-term growth LEADING NEAR-TERM FREE CASH FLOW YIELDS SIGNIFICANT GROWTH IN COPPER RESOURCES P

  8. Slide 8: Hudbay

    H' DBAY

  9. Slide 9: Copper Quality Assets Sustainability

    Peru Constancia – 17 year mine life Exploration Properties 100% ownership Maria Reyna Open pit long-life copper/molybdenum mine Caballito 90k tpd concentrator processes Constancia and Pampacancha ore Kusiorcco Annual average Cu and Au production 1 of 105kt and 60koz, respectively Llaguen Pampacancha

  10. Slide 10: South America Business Unit

    Cusco SOUTH AMERICA CUSCO BUSINESS UNIT Las Bambas CONSTANCIA Yauri PERU Tintaya Antapaccay MINE Lima TOWN AREQUIPA Imata RAIL ROAD CONSTANCIA Arequipa Cerro Verde MOQUEGUA & Peru Economic Risk Business Political Risk Commercial Risk Financing Risk Matarani Environment Risk BB2 Medium Risk 0 TACNA 1

  11. Slide 11: Constancia Mine

    CONSTANCIA MINE 17 YEARS Cu-Mo 86k tpd MINE LIFE PORPHYRY DEPOSIT MILL CAPACITY 105kt 60koz $1.15/lb 7-YEAR AVG. 7-YEAR AVG. 7-YEAR AVG. CU PRODUCTION1 AU PRODUCTION1 CASH COSTS1 CONSTANCIA COPPER PRODUCTION PROFILE1 140 $1.50 122 124 120 $1.45 Cash Costs ($/lb) 102 $1.25 $1.28 LONG LIFE, LOW-COST C

  12. Slide 12: Peru Exploration Potential

    PERU EXPLORATION POTENTIAL SEVERAL OPPORTUNITIES EXIST ON HUDBAY’S EXTENSIVE LAND PACKAGE IN PERU CONSTANCIA SATELLITE EXPLORATION TARGETS Geophysics indicate several nearby exploration targets within trucking distance of Constancia’s infrastructure - Maria Reyna and Caballito have Maria Reyna & Kus

  13. Slide 13: Manitoba Business Unit

    New Britannia Gold Mill MANITOBA BUSINESS UNIT 1,500 tpd capacity Snow Lake Stall Base Metal Mill 3,800 tpd capacity MINE LALOR MINE ~4,650 tpd MILL TOWN RAIL ROAD LALOR 0 5km SASKATCHEWAN MANITOBA Winnipeg Snow Lake LALOR MINE Flin Flon Canada Economic Risk Business Flin Flon Base Metal Mill* Polit

  14. Slide 14: Snow Lake Operations

    SNOW LAKE OPERATIONS 17 YEARS Au-Zn-Cu 5.3k tpd MINE LIFE1 VMS DEPOSITS TOTAL MILL CAPACITY 150-185koz 50-70kt 12-16kt 2022E AU PRODUCTION 2022E ZN PRODUCTION 2022E CU PRODUCTION MANITOBA GOLD PRODUCTION PROFILE2 200 185 178 168 Cash Costs ($/oz) LOW-COST GOLD OPERATION WITH MEANINGFUL BASE METAL 15

  15. Slide 15: Snow Lake Exploration Potential

    SNOW LAKE EXPLORATION POTENTIAL LALOR IN-MINE EXTENSION POTENTIAL AND REGIONAL UPSIDE EXPLORATION OPPORTUNITIES Snow Lake deposits contain 1.7 million ounces of gold in inferred resources Lalor and 1901 inferred resources estimated using stringent methodology constraining the resource within a stope

  16. Slide 16: Arizona Business Unit

    ARIZONA BUSINESS UNIT Miami Pinto Valley Phoenix Resolution ARIZONA, US Ray Morenci Florence Safford MINE TOWN RAIL ROAD Silver Bell Phoenix Tucson Tucson Gunnison Mission COPPER WORLD COMPLEX Sierrita COPPER WORLD COMPLEX United States Economic Risk Business Political Risk Commercial Risk Financing

  17. Slide 17: Copper World Complex

    1.2Bt $1.15/lb 44 YEARS M&I TONNAGE CU CASH CASH COST1 MINE LIFE COPPER WORLD COMPLEX 0.41% 86kt $1,296M / 18% M&I CU GRADE ANNUAL CU PRODUCTION1 NPV10% / IRR2 COPPER WORLD ECONOMICS LOM After-Tax NPV10% (US$M) Phase I After-Tax NPV10% (US$M) $1,903 $1,193 $1,296 $741 $990 $513 $3.25 $3.50 $4.00 $3.

  18. Slide 18: Copper World Complex

    COPPER WORLD COMPLEX Total private land package EXECUTION OF ALTERNATIVE STRATEGY SINCE AUGUST 2019 Conducted Internal Study on Private-only Plan at East in 2019 Discovered New Mineralization on Patented Mining Claims Initiated a drill program in 2020 in support of a private land development plan; s

  19. Slide 19: Copper World Project Upside Opportunities

    COPPER WORLD PROJECT UPSIDE OPPORTUNITIES EVALUATING MANY OPPORTUNITIES TO FLEX THE SCOPE & TIMING OF THE PROJECT Expanding private land Phase I Acquire additional land to unlock the full potential of mining on private land / extend beyond 16 years Operating opportunities to further enhance project

  20. Slide 20: Nevada Mason Project

    NEVADA MASON PROJECT Power Plant Lyon County NEVADA Douglas County MacArthur Reno MASON PROJECT Yerington Blue Hill Mine (Historic) TOWN MASON Yerington Road HUDBAY MINERAL CLAIMS HUDBAY PRIVATE LAND CLAIMS POWER LINE Mason RAIL Las Vegas MINE / DEPOSIT Pumpkin Hollow Mason Valley Mines United State

  21. Slide 21: Mason Project

    2.2Bt $1.76/lb 27 YEARS MASON PROJECT M&I TONNAGE CU SUSTAINING CASH COST MINE LIFE 0.29% 112kt $1,191M / 18% M&I CU GRADE ANNUAL CU PRODUCTION NPV / IRR 1 MASON ECONOMICS1 After-Tax NPV10% (US$M) Unlevered IRR (%) $2,019 23% 18% $1,191 15% $773 $3.25 $3.50 $4.00 $3.25 $3.50 $4.00 Column1 Column1 LA

  22. Slide 22: ESG

    SEE a Pine ESG H' DBAY

  23. Slide 23: Our Approach to Sustainability

    OUR APPROACH TO SUSTAINABILITY MUTUAL RESPECT, TRUST AND CONTINUOUS DIALOGUE By living our values, we build strong relationships with our employees, host communities and governments, making us a better partner and a better company Our Values are: Dignity & Respect: Caring: We treat our stakeholders

  24. Slide 24: Environment

    ENVIRONMENT WE AIM TO DEVELOP, OPERATE AND CLOSE MINES IN A MANNER THAT DEMONSTRATES OUR COMMITMENT TO ENVIRONMENTAL STEWARDSHIP LEADING EMISSIONS RANKING Near-term GHG mitigation is focused on energy efficiency t CO2e/t at our operations CuEq Rank Boliden 0.9 1 Over 50% of our total energy consumpt

  25. Slide 25: Social Impact & Our People

    SOCIAL IMPACT & OUR PEOPLE EMBRACING DIVERSITY AND PROVIDING A HEALTHY & SAFE WORKPLACE Constancia “Hatun Warmi” program expands opportunities for women in mining All operations are required to be certified to ISO 45001, an internationally accepted standard for occupational health and safety managem

  26. Slide 26: Governance

    GOVERNANCE WE RECOGNIZE THE TREMENDOUS OPPORTUNITY THAT WE HAVE TO POSITIVELY CONTRIBUTE LOCALLY AND GLOBALLY TO A MORE SUSTAINABLE WORLD Focused on increased disclosure transparency Data mapped to GRI, SASB and TCFD Disclosure provided through CDP Climate, Water and Forests questionnaires 10/11 Boa

  27. Slide 27: Copper World Designed to Reduce Emissions

    COPPER WORLD DESIGNED TO REDUCE EMISSIONS “MADE IN AMERICA” COPPER TARGETS LOWER ENERGY CONSUMPTION AND REDUCED GHG EMISSIONS Copper World Complex will produce copper cathode expected to be sold entirely to domestic U.S. customers Reduces the operation's total energy consumption, GHG emissions and s

  28. Slide 28: Sustainable Value Creation

    SUSTAINABLE VALUE CREATION WE ALLOCATE RISK-ADJUSTED CAPITAL TO CREATE VALUE ACROSS EVERY STAGE OF THE MINING LIFECYCLE 2022 KEY OBJECTIVES Successful Proven Mine Exploration Development DELIVER meaningful copper and gold production growth to generate positive cash flow and strong returns on investe

  29. Slide 29: Growing Production and EBITDA Outlook

    GROWING PRODUCTION AND EBITDA OUTLOOK ENTERING A PERIOD OF SIGNIFICANT PRODUCTION AND EBITDA GROWTH Completed ~$250M brownfield investment program in 2021 and now at an inflection point in terms of meaningful copper and gold production growth, which is expected to lead to significant growth in EBITD

  30. Slide 30: Near-Term Catalysts

    NEAR-TERM CATALYSTS NUMEROUS ORGANIC GROWTH OPPORTUNITIES EXIST New Britannia gold mill construction, ramp-up and first production achieved ✓ 2021 MANITOBA Updated Snow Lake mineral reserves and resources incorporating recent drilling at 1901 and Lalor ✓ Q1 2022 Advance 3rd phase of Snow Lake gold s

  31. Slide 31: Slide 31

  32. Slide 32: Leading Organic Growth Pipeline

    LEADING ORGANIC GROWTH PIPELINE HUDBAY HAS BUILT A DIVERSIFIED PORTFOLIO FOCUSED ON GROWTH THROUGH EXPLORATION AND M&A, WHILE DIVESTING NON-CORE ASSETS RESOURCE FEASIBILITY STUDY EXPLORATION PRODUCTION DEFINITION COMPLETE Constancia Norte Constancia Mine evaluating underground potential Cu-Mo-Au-Ag

  33. Slide 33: World-Class Management Team

    WORLD-CLASS MANAGEMENT TEAM PETER KUKIELSKI PRESIDENT & CEO PROVEN MINING INDUSTRY EXPERIENCE More than 30 years of sector experience in base metals, precious metals and bulk materials across the globe, including leadership positions at Nevsun, Anemka, ArcelorMittal, Teck and Noranda ANDRE LAUZON ST

  34. Slide 34: Board of Directors

    BOARD OF STEPHEN A. LANG CHAIR PETER KUKIELSKI PRESIDENT & CEO DIRECTORS Stephen has over 40 years of experience in the mining industry, including engineering, development and production at gold, Peter has more than 30 years of experience within the base & precious metals and bulk materials sectors,

  35. Slide 35: Ample Liquidity & Long-Dated Debt Profile

    AMPLE LIQUIDITY & LONG-DATED DEBT PROFILE PRUDENT BALANCE SHEET MANAGEMENT LONG-TERM DEBT STRUCTURE PROVIDES SIGNIFICANT FLEXIBILITY Cash and Equivalents1 $213 million 4.5% Revolver Availability2 $358 million due 2026 Callable starting in 2023 (October 2025 Maturity) Available Liquidity $571 million

  36. Slide 36: Copper Cash Cost Curve

    COPPER CASH COST CURVE LEADING LOW-COST PROFILE (2023E Copper AISC1) 1. Wood Mackenzie’s 2023 by-product C1 + sustaining capex copper cost curve (Q4 2021 dataset dated December 2021). Wood Mackenzie’s costing methodology may be different than the methodology reported by Hudbay or its peers in their

  37. Slide 37: Greenhouse Gas Emissions Curve

    GREENHOUSE GAS EMISSIONS CURVE HUDBAY’S OPERATIONS ARE WELL-POSITIONED ON THE SCOPE 1 & SCOPE 2 EMISSIONS CURVE Benchmarking curves rank site by site emissions for global copper producers Operation Scope 1 & 2 Emissions Rank (t CO2e / t CuEq.) (out of 282) Hudbay’s operations positioned in the 1st a

  38. Slide 38: 3-Year Production Outlook

    3-YEAR PRODUCTION OUTLOOK GROWING COPPER AND GOLD PRODUCTION CONTAINED METAL IN CONCENTRATE AND DORE1 2022 GUIDANCE 2023 GUIDANCE 2024 GUIDANCE PERU Copper tonnes 89,000 - 115,000 110,000 - 134,000 111,000 - 136,000 Gold ounces 70,000 - 90,000 100,000 - 125,000 110,000 - 135,000 Silver ounces 1,620,

  39. Slide 39: 2022 Cost Guidance

    2022 COST GUIDANCE CAPITAL EXPENDITURE GUIDANCE1 EXPLORATION EXPENDITURES 2022 2022 ($ MILLIONS) ($ MILLIONS) SUSTAINING CAPITAL Peru 25 Peru2 105 Manitoba 15 Manitoba3 115 Arizona and other5 40 Total sustaining capital 220 Total exploration expenditures 80 Capitalized spending (25) GROWTH CAPITAL T

  40. Slide 40: Constancia Mine Plan

    CONSTANCIA MINE PLAN 17-YEAR MINE PLAN BASED ON PROVEN AND PROBABLE RESERVES ONLY Updated mine plan for Constancia operations reflects higher copper and gold production from 2022 to 2025 as the higher grades from the Pampacancha deposit enter the mine plan 2021A 2022 2023 2024 2025 2026 2027 2028 20

  41. Slide 41: Constancia Norte Underground

    CONSTANCIA NORTE UNDERGROUND POSITIVE SCOPING STUDY ADDED HIGH-GRADE INFERRED RESOURCES AT CONSTANCIA 2021 scoping study resulted in the addition of 6.5Mt at 1.2% Cu in inferred mineral resources defined in two high-grade skarn lenses (North Skarn and South Skarn) located below the open pit in the C

  42. Slide 42: Maria Reyna Historical Drill Results

    MARIA REYNA HISTORICAL DRILL RESULTS A summary of the historical drill results from Maria Reyna is contained in the table below, however a qualified person has not independently verified this historical data or the quality assurance and quality control program that was applied during the execution o

  43. Slide 43: Snow Lake Gold Strategy

    SNOW LAKE GOLD STRATEGY PHASE 1: Repositioning PHASE 2: Optimization PHASE 3: Historical Work Lalor as a Gold Mine & Execution Expansion Potential ✓2008 & 2009 – Au zone and Cu- ✓2018 – Completion of tradeoff ✓2020 – Optimized mine plan with ✓2021 – Further optimized mine plan with Au zone identifie

  44. Slide 44: Snow Lake Mine Plan

    SNOW LAKE MINE PLAN 17-YEAR MINE PLAN BASED ON PROVEN AND PROBABLE RESERVES ONLY Mine plan optimizes processing capacity in Snow Lake to maximize the NPV of the operations and reflects the first full year of production at the New Britannia gold mill in 2022 and a ramp up at Lalor to 5,300tpd in 2023

  45. Slide 45: Snow Lake Process

    SNOW LAKE PROCESS Lalor Crushed Ore Stall Mill New Britannia Mill Grinding Grinding Flotation Flotation Tails to Tails Zn Concentrate Cu Concentrate Cyanide Destruction Anderson TIA or Leaching/CIP Dewatering Dewatering Process Lalor Paste Plant Electrowinning Tails to Stall Mill (EW)/Refining (via

  46. Slide 46: Snow Lake Processing Logistics

    SNOW LAKE PROCESSING LOGISTICS LALOR MINE 2022 10 years 2031 Source Ore 1901 DEPOSIT 2026 6 years 2031 SATELLITE GOLD DEPOSITS 2031 8 years 2038 (WIM, 3 ZONE) Processing STALL BASE METAL MILL Location 2022 10 years 2031 (WITH GOLD BY-PRODUCT) NEW BRITANNIA GOLD MILL 2022 17 years 2038 (WITH COPPER B

  47. Slide 47: Snow Lake Growth Over Time

    SNOW LAKE GROWTH OVER TIME OVER 3.2M OUNCES OF GOLD HAS BEEN IDENTIFIED AS RESERVES / PRODUCED TO DATE +350% INCREASE IN IDENTIFIED RESERVES / PRODUCED GOLD FROM INITIAL RESERVE ESTIMATE Cumulative Production Reserves 9% increase from 7% increase from 32% increase from resource conversion resource c

  48. Slide 48: Snow Lake Exploration Potential

    SNOW LAKE EXPLORATION POTENTIAL LARGE PROSPECTIVE LAND PACKAGE IN THE SNOW LAKE BELT WITH SIGNIFICANT UPSIDE POTENTIAL MINE MILL Asset Metal Type TOWN • Deposit starts from surface PROJECT WIM WIM Cu-Au • Located 15km from New Britannia mill RAILROAD • 40kt Cu and 126k oz Au in reserves Osborne Lake

  49. Slide 49: Flin Flon Closure Cost Plan

    FLIN FLON CLOSURE COST PLAN 75% OF CLOSURE AND RECLAMATION COSTS ARE TO BE INCURRED AFTER 2037 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2122 $23M in tailings stability $13M in demolition costs between the close of Flin Flon and 203

  50. Slide 50: Copper World Complex

    COPPER WORLD COMPLEX COPPER WORLD 2021 INITIAL RESOURCE ESTIMATES: SIGNIFICANT HIGH-GRADE PORTION CLOSE TO SURFACE Resources comprise both sulphides and oxides with a majority on private land claims Several deposits contain higher grade mineralization, often starting at or very near surface with pot

  51. Slide 51: Copper World Complex

    COPPER WORLD COMPLEX EAST DEPOSIT 2022 REVISED RESOURCE ESTIMATES RESULT IN HIGHER GRADES Upper plate East Deposit revised using Constancia’s resource methodology East Deposit 2022 resource model based on same data as in 2017 but methodology differs on three aspects: East Deposit 2022 Grade shell Ho

  52. Slide 52: Copper World Complex

    COPPER WORLD COMPLEX PHASE I CONSTRAINED BY LAND AVAILABLE TO OPERATE WITHOUT FEDERAL PERMIT REQUIREMENTS During Phase I, land available Phase I Phase I + II to dispose tailings (TSF), Material Mined Material Mined waste rocks (WRF) and heap leach pads (HLP) does not exceed 1,070Mt More resources co

  53. Slide 53: Copper World Complex Mine Plan

    COPPER WORLD COMPLEX MINE PLAN PHASE I 16-YEAR MINE LIFE; PHASE II EXTENDS MINE LIFE TO 44 YEARS PEA contemplates a two-phased mine plan with the first phase reflecting a standalone operation with processing infrastructure on Hudbay’s private land and mining occurring on patented mining claims COPPE

  54. Slide 54: Copper World Complex Mine Plan (Continued)

    COPPER WORLD COMPLEX MINE PLAN (CONTINUED) PHASE I 16-YEAR MINE LIFE; PHASE II EXTENDS MINE LIFE TO 44 YEARS PEA contemplates a two-phased mine plan with the first phase reflecting a standalone operation with processing infrastructure on Hudbay’s private land and mining occurring on patented mining

  55. Slide 55: Copper World Complex Mine Plan by Deposit

    COPPER WORLD COMPLEX MINE PLAN BY DEPOSIT Peach Elgin West Broadtop Bolsa East 100% Peach, Elgin, West and East deposit 90% Broadtop deposits contribute Phase I Phase II contributes 100% ~90% of mined production for 80% the first five years (-1 to 4) 70% % Mined Production 60% ~50% of mined producti

  56. Slide 56: Copper World Robust Economics

    COPPER WORLD METRIC SUMMARY OF KEY METRICS (at $3.50lb Cu) UNIT Phase I Phase II LOM ROBUST ECONOMICS Valuation Metrics (Unlevered) Net present value @ 8% (after-tax) 1 $ millions $1,097 $947 $2,044 Net present value @ 10% (after-tax) $ millions $741 $555 $1,296 Phase I - 16 year mine life Internal

  57. Slide 57: Copper World Early Site Works & Exploration

    COPPER WORLD EARLY SITE WORKS & EXPLORATION PROJECT DE-RISKING ACTIVITIES UNDERWAY Initial grading and clearing activities commenced in April 2022 Seven drill rigs continue to turn at site conducting infill drilling in support of future feasibility studies 2022 spending guidance increased by $30M fo

  58. Slide 58: Significant Copper Production Optionality

    SIGNIFICANT COPPER PRODUCTION OPTIONALITY COPPER WORLD PROVIDES THE NEXT LEG OF COPPER PRODUCTION GROWTH AT HUDBAY Copper World provides significant medium-term copper growth Phase II Incremental +225kt Near-term fully- constructed copper growth ~125 kt Phase I 95 kt 2020 Actual 2022E - 2024E Avg. G

  59. Slide 59: Copper World Permitting Timeline

    COPPER WORLD PERMITTING TIMELINE PHASE I FEASIBILITY STUDY AND PERMITS BY END OF 2023 Received first state-level permit, Mined Land Reclamation Plan (MLRP), in June 2021 Advance pre-feasibility study and state-level permits for Phase I in H2 2022 Definitive feasibility study and receipt of permits e

  60. Slide 60: Copper World Construction Schedule

    COPPER WORLD CONSTRUCTION SCHEDULE PEA BASED ON CONSERVATIVE APPROACH – OPPORTUNITIES TO ACCELERATE FIRST COPPER PRODUCTION PEA assumes a three-year construction period as a prudent base case Concentrator has the longest construction period Opportunities exist to accelerate first copper production w

  61. Slide 61: Peru Mineral Reserves (as at January 1, 2022)

    PERU MINERAL RESERVES (AS AT JANUARY 1, 2022) CATEGORY TONNES Cu (%) Mo (g/t) Au (g/t) Ag (g/t) CONSTANCIA Proven 426,200,000 0.29 82 0.042 2.90 Probable 56,800,000 0.24 69 0.043 3.06 TOTAL PROVEN AND PROBABLE 483,000,000 0.28 80 0.042 2.92 PAMPACANCHA Proven 36,400,000 0.65 177 0.368 5.26 Probable

  62. Slide 62: Peru Mineral Resources (as at January 1, 2022)

    PERU MINERAL RESOURCES (AS AT JANUARY 1, 2022) CATEGORY TONNES Cu (%) Mo (g/t) Au (g/t) Ag (g/t) CONSTANCIA Measured 123,800,000 0.22 64 0.038 2.07 Indicated 118,200,000 0.22 65 0.037 2.08 Inferred – Open Pit 51,000,000 0.30 77 0.054 2.69 Inferred – Underground 6,490,000 1.20 69 0.137 8.62 PAMPACANC

  63. Slide 63: Snow Lake Reserves & Resources – Lalor & 1901

    SNOW LAKE RESERVES & RESOURCES – LALOR & 1901 (AS AT JANUARY 1, 2022) PROPERTY CATEGORY TONNES Zn (%) Au (g/t) Cu (%) Ag (g/t) Proven Lalor 6,420,000 5.57 2.6 0.47 29.5 Base Metal Zone 1901 1,260,000 8.00 2.2 0.32 24.7 Probable Lalor 1,300,000 4.02 3.2 0.50 32.4 1901 380,000 10.01 0.7 0.29 31.0 Tota

  64. Slide 64: Snow Lake Reserves & Resources – Other Gold

    SNOW LAKE RESERVES & RESOURCES – OTHER GOLD (AS AT JANUARY 1, 2022) PROPERTY CATEGORY TONNES Zn (%) Au (g/t) Cu (%) Ag (g/t) WIM Probable 2,450,000 0.25 1.6 1.63 6.3 Probable 660,000 - 4.2 - - 3 Zone TOTAL WIM + 3 ZONE PROBABLE (GOLD) 3,110,000 0.20 2.2 1.28 5.0 Inferred 570,000 - 4.4 - - Birch New

  65. Slide 65: Snow Lake Reserves & Resources – Other Base Metals

    SNOW LAKE RESERVES & RESOURCES – OTHER BASE METALS (AS AT JANUARY 1, 2022) PROPERTY CATEGORY TONNES Zn (%) Au (g/t) Cu (%) Ag (g/t) PEN II Indicated 470,000 8.89 0.3 0.49 7 Talbot1 Indicated 2,190,000 1.79 2.1 2.33 36 TOTAL INDICATED (BASE METALS) 2,660,000 3.04 1.8 2.01 31 Watts River Inferred 3,15

  66. Slide 66: Copper World Complex Mineral Resources

    COPPER WORLD COMPLEX MINERAL RESOURCES (AS AT MAY 1, 2022) Cu Grade Soluble Cu PROPERTY CATEGORY TONNES Mo (g/t) Ag (g/t) (%) Grade (%) Measured 687,000,000 0.45 0.05 138 5.1 Indicated 287,000,000 0.36 0.06 134 3.6 Flotation Total M&I 973,000,000 0.42 0.05 137 4.6 Inferred 210,000,000 0.36 0.05 119

  67. Slide 67: Mason Mineral Resources

    MASON MINERAL RESOURCES (AS AT JANUARY 1, 2022) PROPERTY CATEGORY TONNES Cu (%) Mo (g/t) Au (g/t) Ag (g/t) Measured 1,417,000,000 0.29 59 0.031 0.66 Mason Indicated 801,000,000 0.30 80 0.025 0.57 TOTAL MASON MEASURED AND INDICATED 2,219,000,000 0.29 67 0.029 0.63 Mason Inferred 237,000,000 0.24 78 0

  68. Slide 68: Additional Reserves & Resources Information

    ADDITIONAL RESERVES & RESOURCES INFORMATION The reserve and resource estimates included in this presentation were prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) and the Canadian Institute of Mining, Metallurgy and Petroleum Standar

  69. Slide 69: For more information contact

    For more information contact: Candace Brûlé Vice President, Investor Relations 416.814.4387 | candace.brule@hudbay.com