American Pacific Mining Corp. · CSE:USGD
American Pacific Mining — Investor Presentation (August 2025)
28 slides from American Pacific Mining's investor presentation, August 2025
Slide 1: Three World-Class Partners on Western US Projects
THREE WORLD-CLASS PARTNERS ON WESTERN US PROJECTS AMERICAN PACIFIC MINING CORP. CSE:USGD | OTCQX:USGDF INVESTOR PRESENTATION
Slide 2: Forward Looking Statement
Forward Looking Statement All statements in this presentation, other than statements of historical fact, are "forward-looking information" with respect to American Pacific Mining Corp (APM) within the meaning of applicable securities laws including, without limitation economic estimates and statemen
Slide 3: Share Capital Structure
ABOUT AMERICAN PACIFIC MINING Share Capital Structure Highlights: CSE:USGD Ticker OTCQX:USGDF Common Shares 219,088,052 ~$13 million in cash Options 13,465,796 Warrants 16,096,099 Michael Gentile 14% shareholder Fully Diluted 248,649,947 Cash (CAD) ~$13M as of July 2025 AMERICAN PACIFIC MINING CORP.
Slide 4: Notable
ABOUT AMERICAN PACIFIC MINING Notable Wall Street Journal Mining Index ranked USGD #1 performing gold stock globally in 2021 Nominated by S&P Global Platts: • Rising Star Company • CEO Of The Year • Deal Of The Year (Twice) Nominated by Mines and Money: Collaboration Of The Year AMERICAN PACIFIC MIN
Slide 5: Key Takeaways
ABOUT AMERICAN PACIFIC MINING Key Takeaways Focused on high-grade projects in the western US that are attractive to majors Uniquely positioned with significant exploration work completed to date Well-funded with ~$13M in cash and two 100%-owned flagship high-grade assets Near-term catalysts include
Slide 6: AMERICAN PACIFIC MINING CORP. CSE:USGD | OTCQX:USGDF PAGE 6
AMERICAN PACIFIC MINING CORP. CSE:USGD | OTCQX:USGDF PAGE 6
Slide 7: Madison Mine
COPPER-GOLD IN MONTANA, USA Madison Mine USGD acquired the permitted Madison Copper Gold Project from Madison Metals June 2020 100%-owned $7.7 million spent on exploration since 2019 Hosts Madison Mine: past-production 2008 - 2012 of 2.7M lbs of copper with grades ranging from ~20% to over 35% coppe
Slide 8: Drill Highlights to Date
Drill Highlights to Date Exceptional grades allowed for mining with very basic methods & infrastructure 2024/2025 Results (to date) Hold ID Hole Type Interval (m) Gold (g/t) Copper (%) including Core 0.5 146.0 0.98 APMMAD24-02 Core 38.3 1.2 1.28 Historic Results including Core 7.9 2.5 2.08 Hold ID H
Slide 9: Madison 2025 Targets
Madison 2025 Targets The most informed drill targets to date American Pacific has consolidated decades of effort that has resulted in near mine growth potential and a district-scale mineralized exploration footprint of 4 km x 2 km with numerous untested targets. Phased 2025 drilling is focused on th
Slide 10: Phase I 2025 Drill Results
COPPER-GOLD IN MONTANA, USA Phase I 2025 Drill Results ~3,000 metres of drilling completed early Q3, 2025 Highlights from first holes of Phase I, 2025 drilling: APMMAD-25-02: Intersected 23.2 g/t Au over 1.5 m within broader 19.8 m interval of 2.0 g/t Au (starting at 121.9 m), and a lower zone with
Slide 11: 2025 Planned Drilling – Vectoring toward Porphyry Target
2025 Planned Drilling – Vectoring toward Porphyry Target Broadway Mine Drill Testing Dual purpose extensional and down- plunge drilling beneath the historic mine to test porphyry targets and feeders for the historic high-grade zones. These holes will expand known mineralized envelopes and refine the
Slide 12: Proposed Phase II 2025 Drill Holes
Proposed Phase II 2025 Drill Holes IP Anomalies in Cross Section Looking NW Proposed trenching of potential high-grade Au/Ag quartz sheeted vein set PORK Porphyry/Igneous Complex Skarn Ridge: SE Extensional Beast: Untested target of Target: Untested, high priority, Drilling of Madison/Broadway sheet
Slide 13: 2025 Near Mine Extension Drilling
2025 Near Mine Extension Drilling Broadway Mine Drill Testing Looking north Historic Production of 144,000 oz Au / 10.8 g/t Au 4.54 g/t (0.16 oz/tonne) 45.5 g/t Au Conducting extensional and down- plunge drilling to test historic high- grade zones, targeting mineralization in Bro adway Mine Workings
Slide 14: 2024 Drill Results
COPPER-GOLD IN MONTANA, USA 2024 Drill Results Data compilation and discovery phase High-grade intersections not only confirm, but significantly expand understanding of the widespread mineralization remaining beyond what was historically mined DRILL HIGHLIGHTS APMMAD24-02 APMMAD24-06 38.25 m of 1.28
Slide 15: Madison Core 2017 Drilling
MADISON MINE Madison Core 2017 Drilling Hole C17-24 – latite porphyry Left: Carbonate-latite porphyry contact; note the chaotic folding and brecciation Right: Latite porphyry showing the phyllic alteration AMERICAN PACIFIC MINING CORP. CSE:USGD | OTCQX:USGDF PAGE 15
Slide 16: Madison Ore
JASERPOID | NATIVE COPPER/CHALCOCITE | MASSIVE SULFIDE/SKARN Madison Ore JASPEROID/JASPER ORE NATIVE COPPER\CHALCOCITE ORE MASSIVE SULFIDE/SKARN ORE Grades: Grades: Grades: Hole 88-C9 (199'-213', 14 ft) Hole 94-5R (475'-485', 10 ft) Hole CO6-8 (401'-418.7',17.7 ft) Au= 0.53 opt Au= 0.020 opt Au= 0.6
Slide 17: AMERICAN PACIFIC MINING CORP. CSE:USGD | OTCQX:USGDF PAGE 17
AMERICAN PACIFIC MINING CORP. CSE:USGD | OTCQX:USGDF PAGE 17
Slide 18: Palmer VMS Project
VMS DISCOVERY IN SOUTHEAST ALASKA, USA Palmer VMS Project Defining a multi-deposit district with only 4 of the known 16 VMS showing included in the Mineral Resource Estimate A L A S K A Total project expenditures of >US$116 million Anchorage by the end of 2024 Juneau 100%-owned after taking over own
Slide 19: Located Within a Premier Mineral Belt
PA LME R VMS PALMER VMS PROJECT Windy PROJECT Located Within a Craggy Deposit Skagway Port Premier Mineral Belt Haines Big Nugget Port Deposits are large and rich Project Kensington Mine Rich mining district with 2 active mines AL ASK A Coeur Mining GREENS CREEK MINE Among richest VMS- Top US Silver
Slide 20: Best Copper Intercepts in Palmer History Drilled in 2023
PALMER VMS PROJECT Best Copper Intercepts in Palmer History Drilled in 2023 UPPER ZONE 1 = 2023 BEST HOLES 43.8 m of 6.54% Cu 3.15% Zn 0.42 g/t Au 27.91 g/t Ag 8.22% CuEq CMR23-172 37.1 m of 4.57% Cu 8.44% Zn 0.50 g/t Au 29.33 g/t Ag 8.40% CuEq CMR23-167 33.2 m of 5.48% Cu 7.22% Zn 0.64 g/t Au 36.78
Slide 21: Palmer Project Mineral Resource Statement
Palmer Project Mineral Resource Statement, Effective Date January 13, 2025 (1), (2), (5), (9), (10) Mass Cu Zn Pb Ag Au BaSO4 ZnEq CuEq Classification Zone Domain Mt % % % g/t g/t (%) % % Zone_1 2.75 2.15 5.20 0.11 25.7 0.33 20.5 14.9 3.9 SW(3) Indicated Zone_2 2.02 1.08 5.12 0.17 32.1 0.23 20.7 10.
Slide 22: Palmer Project Mineral Resource Statement (Contained Metal)
Palmer Project Mineral Resource Statement, Effective Date January 13, 2025 (1), (2), (5), (9), (10) Contained Metal Mass Classification Zone Domain Cu Zn Pb Ag Au BaSO4 Mt M lb M lb M lb K oz K oz (k t) Zone_1 2.75 130.2 315.4 6.6 2,275 28.8 562.8 SW(3) Indicated Zone_2 2.02 47.9 227.6 7.7 2,078 15.
Slide 23: Additional Projects
ABOUT AMERICAN PACIFIC MINING Additional Projects ZIGGURAT GOLD PROJECT-NEVADA Located 20 km from Kinross’ Round Mountain Mine (>15 Moz gold produced) Adjacent to Newmont’s Northumberland Mine (3.5 Moz gold, 11 Moz silver production + M&I) TUSCARORA DISTRICT GOLD PROJECT-NEVADA High-grade gold-silve
Slide 24: Well-rounded team with big company exploration and capital markets experience
MANAGEMENT & DIRECTORS: Well-rounded team with big company exploration and capital markets experience Warwick Smith Joness Lang Peter Mercer Alnesh Mohan Eric Saderholm CEO & DIRECTOR PRESIDENT SENIOR VP, ADVANCED PROJECTS CFO & DIRECTOR MANAGING DIRECTOR OF EXPLORATION, DIRECTOR Mr. Smith is a vent
Slide 25: Well-rounded team with big company exploration and capital markets experience
DIRECTORS: Well-rounded team with big company exploration and capital markets experience Ken Cunningham Ali Hakimzadeh INDEPENDENT DIRECTOR INDEPENDENT DIRECTOR Mr. Cunningham brings 45+ years experience in worldwide diversified mineral exploration and Ali is the Managing Partner of Sequoia Partners
Slide 26: Key Takeaways
ABOUT AMERICAN PACIFIC MINING Key Takeaways Focused on high-grade projects in the western US that are attractive to majors Uniquely positioned with significant exploration work completed to date Well-funded with ~$13M in cash and two 100%-owned flagship high-grade assets Near-term catalysts include
Slide 27: Contact Us
CONTACT US Kristina Pillon INVESTOR RELATIONS 604-908-1695 kristina@americanpacificmining.com AMERICAN PACIFIC MINING CORP. CSE:USGD | OTCQX:USGDF INVESTOR PRESENTATION
Slide 28: Mineral Resource Notes
Appendix PALMER VMS PROJECT Mineral Resource Notes (1) Mineral Resources, which are not Mineral Reserves, do not have demonstrated economic viability. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, market or other relevant issues. The quantit
American Pacific Mining — Investor Presentation (August 2025) on 6ix