New Carolin Gold Corp

New Carolin Gold — Investor Presentation (April 2016)

15 slides from New Carolin Gold's investor presentation, April 2016

  1. Slide 1: Carolin Mine in production, 1984

    Slide 1: Carolin Mine in production, 1984

    ( Carolin Mine in production, 1984 )! www.newcarolingold.com TSX-­‐V:LAD

  2. Slide 2: Forward-looking statements

    Slide 2: Forward-looking statements

    This presentation may contain certain statements which may be considered “forward-looking statements.” Forward-looking statements are statements that are not historical facts and are generally identified by words such as “expects”, plans”, “anticipates”, “believes”, “intends”, “estimates”, “projects

  3. Slide 3: www.newcarolingold.com TSX-­‐V:LAD

    Slide 3: www.newcarolingold.com TSX-­‐V:LAD

    3! www.newcarolingold.com TSX-­‐V:LAD

  4. Slide 4: Environmental manager and advisors

    Slide 4: Environmental manager and advisors

    Ed Beswick B.Sc. P. Eng - Environmental Manager and Consultant. Ed is a registered professional mining engineer that has most recently been responsible for field operations and exploration projects, including leading environmental and safety programs. Ed was the former north central BC Regional Mini

  5. Slide 5: Easy access to Carolin Mine site

    Slide 5: Easy access to Carolin Mine site

     Easy access to Carolin Mine site! • Proximity to Vancouver (2 hr drive by freeway) and 15 minutes to mining-friendly! !Hope, BC by freeway, eliminating the need for mining camp.! • Easily accessible near full services at Hope and Vancouver BC.! • Main rail line 18 kilometers away at Hope, BC.!  A

  6. Slide 6: Our Environment, Community Engagement, Mine permits

    Slide 6: Our Environment, Community Engagement, Mine permits

     Our Environment! • Environmental bond of CAD$200,000 – August 31, 2011 is in place. Reclamation work has been on-going to address historical mined areas, tailings storage facilities and waste materials.! • LC50 fish mortality test of historical flotation tailings storage facility conducted by Lake

  7. Slide 7: Ladner Gold Project land package

    Slide 7: Ladner Gold Project land package

    • 144 Sq. Km contiguous land package – approx. 28 km x 5 km, with excellent road infrastructure in place.! Ward Mine • Under-explored district scale gold system along Hozameen Fault.! Pipestem Mine • Extensive geological database that includes 700+ drill holes and 50,000+ meters of drilling.! McMast

  8. Slide 8: Coquihalla Gold Belt and Hozameen Fault

    Slide 8: Coquihalla Gold Belt and Hozameen Fault

     The Coquihalla Gold Belt extends from the property on a northwest trend for 28 km on Company claims and along the Hozameen Fault.!  5 historical mines (since 1910).!  30 known gold workings and high grade occurrences with little follow-up work or modern day exploration techniques or know how. !

  9. Slide 9: Consistent grade distribution and width

    Slide 9: Consistent grade distribution and width

    • Consistent grade distribuMon and width • Selected composite intervals represenMng typical grade and width using 5.20 g /t / 7.2m 6.66 g /t 18.65m > 2 g /t gold cutoff grade for averaging 5.02 g /t / 57.8m 5.70 g /t / 59.1m 7.23 g /t / 21.4m 10.51 g /t / 10.0m 6.79 g /t / 14.5m 5.33 g /t / 36.6m 6.9

  10. Slide 10: Historical mines and production

    Slide 10: Historical mines and production

    5 Historical mines (4 operating) and 30 known high-grade gold occurrences and numerous artisan mining activities since 1890." Arum Mine located 300 meters south of the existing Carolin Mine recorded 525 oz au from 495 tons in 1910 and 1925. ! The Emancipation gold mine active between 1916 and 1941 r

  11. Slide 11: Athabaska Gold work programs and results

    Slide 11: Athabaska Gold work programs and results

    DDH No. From (m) To (m) Width (m) Gold gm/to Width (ft) Gold oz/t  Athabaska Gold - $3.5M in Work Programs! 11000-52 3.00 8.00 5.00 3.85 16.4 0.112 11000-52 31.00 34.00 3.00 3.45 9.8 0.101 • 110 meters of new drifting to 11000-55 64.00 66.00 2.00 6.79 6.6 0.198 extend the workings on the 11000-71 1

  12. Slide 12: Geological model compared to Bralorne and Mother Lode

    Slide 12: Geological model compared to Bralorne and Mother Lode

    The geological model and local structures at Ladner Creek are comparable to Bralorne (4m oz) & Motherlode (7 million oz producer) mining camps! Bralorne! Bralorne Gold Mines Inc. Presentation 2014! Carolin Zones Long Section, looking east. ! Mother Lode! Sutter Gold Mining Inc. Presentation 2013! Mi

  13. Slide 13: Exploration Focus and Action Plan 2016

    Slide 13: Exploration Focus and Action Plan 2016

     Exploration Focus! • Expand and upgrade existing gold resources at the Carolin Mine and McMaster Zones. ! • Leverage over 50,000m of historic drilling. Utilize 600+ drill hole database from the Carolin Mine from the 1970s/80s, along with the Athabaska Gold drill program in 1995-96, which provides

  14. Slide 14: Market cap, resources, assets, work plans

    Slide 14: Market cap, resources, assets, work plans

     Market Cap - fully diluted March 2016 - approx. $16M.!  Current Resources - Inferred NI 43-101 compliant resource estimate consisting of: 607,000 oz au grading 1.53 g/t using a 0.5 g/t Au cut-off at Carolin Mine; and 79,000 oz au grading 0.69 g/t using 0.5 g/t Au cut-off grade. (Reference 2015 Te

  15. Slide 15: Contact

    Slide 15: Contact

    Robert Thast, President / CEO - 604-542-9458 (Bus) 604-220-5031 (cell) ! Email – ceo@newcarolingold.com! Bob Singh, P.Geo. Project Manager / Geoscientist bob.singh@northfacesoftware.com! Barry Lee, CFO dblee@firstmg.com! Ken Holmes LLB, Director, Operations Manager / Corporate Secretary krholmes55@g

Source: Internet Archive copy of newcarolingold.com

More decks from New Carolin Gold Corp