  1. Slide 1: Corporate Presentation August 2013

    TSX: LUN OMX: LUMI Corporate Presentation August 2013

  2. Slide 2: Cautionary Statements

    Cautionary Statements Caution Regarding Forward Looking Statements This presentation contains forward forward‐looking looking statements. statements These forward forward‐looking looking statements are not based on historical facts, but rather on current expectations and projections about future eve

  3. Slide 3: Key Asset Overview

    Key Asset Overview • European Operations • Tenke Fungurume • Growth Projects • Neves‐Corvo, Neves Corvo Portugal • Tier 1 Cu/Co asset • Eagle Mine (Cu/Zn) • 24% interest • Lombador Phase I • Zinkgruvan, Sweden • Freeport‐McMoRan • Tenke Expansions (Zn/Pb/Cu) operator t • Aguablanca, Spain • Phase II

  4. Slide 4: Lundin Highlights

    Lundin Highlights ƒ Significant copper producer – majority of revenues from copper ƒ Leverage to zinc, lead, nickel and cobalt ƒ Wholly‐owned Wh ll d hi high h quality li assets – portfolio f li off llong lif life, relatively l i l low cost mines in stable jurisdictions ƒ Stake in Tenke – a world‐cl

  5. Slide 5: Operations and Outlook

    Operations and Outlook 5

  6. Slide 6: Production and Cost Guidance - 2013

    Production and Cost Guidance ‐ 2013 2013 Guidance Tonnes C1 Cost a Copper Neves‐Corvo 50,000 – 55,000 $1.80 Zinkgruvan 2,500 – 3,500 Aguablanca 5,000 – 5,500 Wholly‐owned 57,500 – 64,000 Tenke (@ 24%)b 49,000 $1.24 Total 106,500 – 113,000 Zinc inc Neves‐Corvo Neves Corvo 45,000 – 50,000 Zinkgruvan 7

  7. Slide 7: Cost Restraint Initiatives

    Cost Restraint Initiatives • Capital expenditures for 2013*, have been reduced by $55 million to $230 million • The $55 million reduction is comprised as follows: • $40 $ 0 million illi Tenke k • $10 million new investment • $5 million in sustaining capex • Exploration expenditures have also been re

  8. Slide 8: Neves-Corvo

    Neves‐Corvo 8

  9. Slide 9: Neves-Corvo – Snapshot

    Neves‐Corvo – Snapshot • Underground copper and zinc mine located in Portugal • Active A ti mining i i in i fi five major j ore b bodies di underground d d • Potential for future growth from Lombador zinc/copper deposit and d the h Semblana S bl copper deposit d i • Zinc production achieved a new qu

  10. Slide 10: Neves-Corvo – Outlook

    Neves‐Corvo – Outlook • Stope blasting in Lombador zinc ore commenced in June 2013. Zinc ggrades increasingg in the second half of 2013 • Favourable preliminary results on expanding shaft hoist capacity could enable p production increases with relativelyy low capex p • Reviewing shaft feed infrastru

  11. Slide 11: Neves-Corvo Production Outlook

    Neves‐Corvo Production Outlook Midpoint of guidance range assumed for 2013 ‐ 2015 11

  12. Slide 12: Zinkgruvan

    2 zi eee nkgruvan a Pape en be~ J 12

  13. Slide 13: Zinkgruvan – Snapshot

    Zinkgruvan – Snapshot • Underground zinc/lead/copper mine located 200km southwest of Stockholm • High quality zinc concentrate sought after by European smelters • Lowest quartile cost producer due to high zinc grades and strong by‐product credits • Lead production achieved record levels in Q2 Locati

  14. Slide 14: Zinkgruvan – Outlook

    Zinkgruvan – Outlook • Interim measures to improve plant availability and reduce dust and noise emissions have accomplished measurable improvements • Plant modernization contemplated but deferred pending zinc market improvement 14

  15. Slide 15: Zinkgruvan Production Profile

    Zinkgruvan Production Profile Midpoint of guidance range assumed for 2013 ‐ 2015 15

  16. Slide 16: Aguablanca

    Aguablanca 16

  17. Slide 17: Aguablanca – Snapshot

    Aguablanca – Snapshot • Open‐pit nickel/copper mine located 100km north of Seville, Spain • Operations going very well, annual production guidance increased in Q2 • Pit life extended until Q1/2015. Further pushbacks to the south wall in progress Location • Spain Ownership • 100% 2013 Production • 6,

  18. Slide 18: Tenke Fungurume

    Tenke Fungurume 18

  19. Slide 19: Tenke – Snapshot

    Tenke – Snapshot • One of the world’s largest known copper‐cobalt resources located in Katanga Province, DRC • Operated by Freeport‐McMoRan – Lundin 24% equity interest • Ph Phase 2 Expansion E i completed, l d increasing i i capacity i to at least l 195,000 tpa of copper cathode and 15,000 tpa of c

  20. Slide 20: Tenke Outlook

    Tenke Outlook Significant Cash returns Expected to Continue in 2013/2014 • Capital reduction initiatives are expected to result in capex being reduced in 2013 & 2014 • Further expansion investment timing under review by operator Freeport • LUN expects significant cash flows from Tenke to continue, a

  21. Slide 21: Eagle Mine

    Eagle Mine 21

  22. Slide 22: Eagle Mine - Acquisition Summary

    Eagle Mine ‐ Acquisition Summary • Acquired the high grade Eagle nickel/copper mine from Rio Tinto for approximately $315 million • Advanced stage of construction (over 50% completed), scheduled for startup in Q4/2014 • Acquisition to be funded from cash on hand & credit facilities • Transaction clo

  23. Slide 23: Eagle – Construction Progress

    Eagle – Construction Progress Mill site facilities Underground mine ramp Mine site facilities 23

  24. Slide 24: Exploration Upside – Eagle East and Deep Targets

    Exploration Upside – Eagle East and Deep Targets • Eagle East: 900 m deep. Initial drilling indicates lower grade, sizeable deposit • Eagle Deep: Target located 400 m beneath the lowest mine development p level. Target g is high‐ g grade massive Ni‐Cu mineralization concentrated within Eagle root fe

  25. Slide 25: Eagle Property Exploration Targets

    Eagle Property Exploration Targets Mag 1‐20 E l West Eagle W t Eagle Eagle East Eagle Cody Melt Deep 1 km Magnetics Analytic Signal High priority drill targets Generative targets

  26. Slide 26: Eagle – Low-Cost Nickel Project

    Eagle – Low‐Cost Nickel Project • We estimate Eagle LOM C1 cash cost at $2.55/lb, which is in the lowest o est cost quartile qua t e Eagle (est.) 26

  27. Slide 27: Lundin Mining - Low-Cost Operations Cu & Zn

    Lundin Mining ‐ Low‐Cost Operations Cu & Zn 2013 C1 Copper Cost Curve, Grouped by Mine ($/lb) $3 00 $3.00 $2.50 Neves‐Corvo $2.00 Weighted Average Tenke Fungurume $1.50 As Tenke $1.00 production increases, Lundin $0.50 will move down the cost curve $0.00 ‐‐ 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% C

  28. Slide 28: Lundin Mining - Summary

    Lundin Mining ‐ Summary Portfolio of high quality, long‐life mines that are performing well Optimization opportunities and exploration potential at all existing assets No high risk major capital projects Proven disciplined growth approach Geographic and base metal diversification Neves‐Corvo Zinkgru

  29. Slide 29: TSX: LUN OMX: LUMI

    TSX: LUN OMX: LUMI