Jupiter Energy Limited · ASX:JPR
Jupiter Energy — Investor Presentation (October 2009)
30 slides from Jupiter Energy's investor presentation, Oct 15, 2009

Slide 1: JPR Corporate Presentation
JPR Corporate Presentation 15 October 2009 | www.jupiterenergy.com.au

Slide 2: Forward looking statements
This presentation contains forward looking statements that are subject to risk factors associated with the oil and gas industry. It is believed that the exceptions reflected in these statements are reasonable, but they may be effected by a variety of variables which could cause actual results or tre

Slide 3: Jupiter Energy Limited Kazakhstan
ENERGY LIMITED JUPITER Kazakhstan

Slide 4: Corporate Overview
Corporate Overview • Jupiter Energy Limited is a listed company trading on the Australian Stock Exchange (ASX) under the ticker “JPR”. • JPR began reviewing oilfield development opportunities in Kazakhstan in early 2007. • JPR has since then reviewed a range of acquisitions from exploration permits

Slide 5: Local Kazakh Representation
Local Kazakh Representation Executive Director Erkin Svanbayev Based in Almaty, Kazakhstan Experienced oil trader Responsible for managing all interaction with Kazakh Government and Industry officials

Slide 6: JPR Executives: Technical Leadership
JPR Executives Technical Leadership David Thorpe M. Eng. Sc. and PhD Operations Manager Extensive Operations background Drilling Engineer at BHP Petroleum, Woodside and Shell Todd Oil Services (STOS). Responsible for all of JPR’s drilling activities

Slide 7: JPR Executives: Technical Leadership
JPR Executives Technical Leadership Keith Martens B.Sc. in Geophysics / Geology 30 years experience in onshore oilfield discovery and remediation Exploration manager at SANTOS, Tap Oil and Bow Energy. Has reviewed 100+ opportunities in Kazakhstan Responsible for all JPR exploration activit

Slide 8: JPR Australian Board Members
JPR Australian Board Members Executive Chairman Geoff Gander Manages interaction with finance community Responsible for day to day business operations Non Executive Director Andrew Childs Geologist by background Involved in a number of listed oil companies

Slide 9: Main oil fields and infrastructure map
ile re sorerea eee cont nee en ehhh hh JUP TER ENERGY, LIMITED Main oil fields Oil Pipelines Gas Pipelines Railroad O es | 4km

Slide 10: Geology Factors in the Area
Geology Factors in the Area Source/Charge - multi billion barrels trapped in basin, surrounding structures and only modern well in the permit have movable oil Seal - Main targets (Triassic A&B, Jurassic XIII) have on trend seals Reservoir - Producing Triassic A&B field at Akkar North, Jurassic

Slide 11: Block 31 Overview
Block 31 Overview Initial permit acquired by JPR in June 2008. Size was approximately 100 square kms and located in the Zhetybai-Uzen step of the Mangistau Basin, close to infrastructure and the port city of Aktau. Permit has a 10 year exploration licence (6 years with 2 * 2 year extensions).

Slide 12: Current Plan – Re entry of the NWZ 2 well
Current Plan – Re entry of the NWZ 2 well Block 31 has a 1969 well (NWZ #2) that showed an oil discovery. The NWZ 2 well had shows throughout the Jurassic/Triassic and flowed oil from a 30m sand just about the Jurassic/Triassic UC (which is labelled Ju XIII). NWZ 2 was cased and JPR has decided

Slide 13: Recompletion Target
Updip NWZhetybay2 Primary Targets JUPITER ENERGY LIMITED Recompletion Target Formation on, . Jurassic XIll lass | Revowerabie fa 575 Oil Potential — 144 mmbls . . . .

Slide 14: Recomplete 30m oil zone in October 2009
Recomplete 30m oil zone in October 2009

Slide 15: Workover rig in operation at NWZ 2 location
Workover rig in operation at NWZ 2 location

Slide 16: 2 Prospective Areas both with proven oil
2 Prospective Areas both with proven oil

Slide 17: Next drilling program – SV Akkar well
Next drilling program – SV Akkar well Block 31 has 2 parts with the 3D seismic recently shot providing 95 square kms of full fold coverage over the western part (Part 1). No 3D was shot over the eastern part (Part 2). This 3D survey forms the main data used for prospect identification and the quan

Slide 18: Independent Mapping on Jupiter 2009 3D Seismic confirms potential
Independent Mapping on Jupiter 2009 3D Seismic confirms potential Akkar North Ext. Formation : Triassic A & B Area (hectares) : 156 Porosity : 9.5% Net Pay (m) : 30 Sw % : 42% Recovery % “ 30% Geometric Correction : 90% Oil-in-place : 19.98 mmbbls Recoverable Oil Potential : 5.995 mmbbls

Slide 19: Akkar N - Official Field Mapping
Akkar N - Official Field Mapping T3 T2A Pool AK 6 Block 31 T2B Pool AK 2 T2B Pool AK 1, 3, 11, 13 Booked Reserves of 23 mmbbls 6 producers with an aggregate of ~1600 bopd The bulk of reserves and production are in the eastern pool (3 producers)

Slide 20: Akkar N - Official Cross Sections
Akkar N - Official Cross Sections T2B Pool South to North T2B Pool AK 1, 3, 11, 13 T2B zone flowed at 500-600 bopd on test T2B Pool T3 T2A Pool AK 2 AK 6

Slide 21: Akkar N – Net Pay on Main Sand
Akkar N – Net Pay on Main Sand Block 31 Drill Site Block 31 Official Numbers inside Block 31 19.98 mmbbls OIP 5.995 mmbbls potential resource

Slide 22: Local Operations
Local Operations JPR has a local office in Almaty which administers the local operation and interfaces into government authorities for approvals and general reporting. JPR has now opened an office in Aktau and expects to have staff of 6 in the near term. Aktau is 50kms from site. David Thorpe, a

Slide 23: Transport
Transport Infrastructure is close to Block 31 permit Pipeline - Eastern Europe - Baltic - Black Sea - Proposed Eastern Link to China Caspian tanker Trade - - Baku - Iran (oil swap) Rail - Aktau - Caspian trade Road - Aktau - Caspian trade

Slide 24: Kazakh Fiscal Regime
Kazakh Fiscal Regime Corporate income tax has been reduced to 20% in 2009 and will continue to drop to 17.5% in 2010 and then to 15% in 2011. Rent tax on Oil Exports rates set at 0 – 32%, with higher rates applied to larger amounts of exports .(JPR has used a rate of 7% in its model based on $US

Slide 25: Financial Snapshot
Financial Snapshot Range of Gross Revenues per Year Allocations based on $US 50/barrel

Slide 26: Summary of the Opportunity
Summary of the Opportunity 3D seismic on Block 31 is complete and specific targets have been identified. Re entry of old discovery well has commenced. New well is planned to be drilled, commencing in late 2009. Data available on Akkar N wells, when combined with JPR’s 3D seismic and general

Slide 27: Recoverable Oil Potential
JUPITER ENERGY LIMITED Recoverable Oil Potential NWz6 oo

Slide 28: Further Questions?
Further Questions? Geoff Gander Chairman Jupiter Energy Limited M: +61 417 914 137 (Australia) or +7 701 221 8907 (Kazakhstan) E: geoff@jupiterenergy.com.au

Slide 29: Disclaimer
Disclaimer This presentation was prepared exclusively for the benefit and use of potential investors in order to provide an update on the future business directions of Jupiter Energy Limited (“JPR”) and neither the presentation nor its delivery to any prospective investor shall constitute an offer t

Slide 30: Competent Person Statement
Competent Person Statement The information in this document that relates to oil exploration results and reserves is based on information compiled by Mr. Keith Martens who is a Director of Martens Petroleum Consulting Pty Ltd. Mr. Keith Martens has sufficient experience which is relevant to oil explo
Source: Internet Archive copy of jupiterenergy.com.au
More decks from Jupiter Energy Limited
Investor Presentation (October 2026)8 slides · October 2026
Investor Presentation (April 2026)9 slides · April 2026
Investor Presentation (December 2025)9 slides · December 2025
Investor Presentation (May 2025)13 slides · May 2025
Shareholder Meeting (February 2025)12 slides · Feb 5, 2025
Investor Presentation (December 2024)13 slides · December 2024