  1. Slide 1: Idylwood Substation Open House Presentation

    Idylwood Substation Open House Presentation January 28, 2015 © 2003 Dominion

  2. Slide 2: © 2003 Dominion

    © 2003 Dominion

  3. Slide 3: Idylwood Substation…Critical Hub

    Idylwood Substation…Critical Hub The Idylwood Substation is a 60-year old facility located at the intersection of two major transmission corridors. It is an electrical transmission hub and major distribution substation that is critical to Dominion for providing reliable power to the Holly Crest Comm

  4. Slide 4: Updated Plans

    Updated Plans  Fact remains: Substation must be updated and remodeled  Following last open house, Dominion removed rear expansion proposal  Dominion will proceed with remodeling substation at front portion of property  Along with removing Phase 2, other improvements to proposal were made © 2003

  5. Slide 5: Community requests that have been implemented

    Community requests that have been implemented: • Lowered Backbones • Brick Architectural Wall • Increased Landscaping • Extra Street Lighting • Removal of Entrance from Holly Crest • Off-Site Landscaping • Phase 2 removed • Substation shifted approximately 30’ away from Holly Manor Drive properties

  6. Slide 6: Aerial View of Existing Substation

    Aerial View of Existing © 2003 Dominion 6 Substation

  7. Slide 7: Previous Buffer & Landscaping

    Previous Buffer & Landscaping Approximate 20’ buffers

  8. Slide 8: Enhanced Buffer & Landscaping

    Enhanced Buffer & Landscaping Phase 2 Removed Buffer increased to 50’ Buffer increased to 35’

  9. Slide 9: Equipment

    EQUIPMENT • Existing equipment footprint: 3.99 acres  Existing equipment is wider and bulkier  It has more steel and metal throughout property • Proposed equipment footprint: 2.27 acres  New footprint is 1.72 acres smaller than what exists today  New equipment is less bulky  Majority of equipme

  10. Slide 10: Side-by-Side Comparison of Various Footprints

    Side-by-Side Comparison of Various Footprints Existing Previously Proposed Currently Proposed 3.99 Acres 4.69 Acres 2.27 Acres © 2003 Dominion 10

  11. Slide 11: Wall

    = Thuja occidentalis == Emetald-Green Arborvitae® fe if ne 44‘ maximum allowed height of plantings Hydrangea -quercifolia Aronia arbutifolia Oakleaf Hydrangea — —Red:Chokeberry = t abate OREM a kk sab i Mae alll Lik Vit

  12. Slide 12: Profile View of Wall

    Profile View of Wall © 2003 Dominion 12

  13. Slide 13: Visual Simulations

    Visual Simulations © 2003 Dominion 13

  14. Slide 14: Front Entrance – Existing View

    Front Entrance – Existing View

  15. Slide 15: Front Entrance – 2 Year Growth

    Front Entrance – 2 Year Growth

  16. Slide 16: Front Entrance – 10 Year Growth

    Front Entrance – 10 Year Growth

  17. Slide 17: View from Shreve Road - Existing

    View from Shreve Road - Existing

  18. Slide 18: View from Shreve Road – 2 Year Growth

    View from Shreve Road – 2 Year Growth

  19. Slide 19: View from Shreve Road – 10 Year Growth

    View from Shreve Road – 10 Year Growth

  20. Slide 20: 7715 Marthas Lane - Existing

    7715 Marthas Lane - Existing

  21. Slide 21: 7715 Marthas Lane – 2 Year Growth

    7715 Marthas Lane – 2 Year Growth

  22. Slide 22: 7715 Marthas Lane – 10 Year Growth

    7715 Marthas Lane – 10 Year Growth

  23. Slide 23: 7715 Marthas Lane – Off Site Landscaping

    7715 Marthas Lane – Off Site Landscaping

  24. Slide 24: 2554 Holly Manor Drive

    2554 Holly Manor Drive Viewpoint 01 - Residence at 2554 Holly Manor Drive - Looking West Southwest - Proposed View

  25. Slide 25: 2564 Holly Manor Drive

    2564 Holly Manor Drive 2 aces see eee) Viewpoint 04 - Residence at 2564 Holly Manor Drive - Looking West - Existing View IM | TRUESCAPE orrr fit ei be 453 i i ergurerert conaitants Viewpoint 04 - Residence at 2564 Holly Manor Drive - Looking West - Proposed View

  26. Slide 26: Benefits of Application

    Benefits of Application • After 60 years, site gets brought back under County review • Opportunity for improved equipment that is quieter and less bulky looking • An improved, architectural brick wall that hides the industrial look of the property • Landscaping – on and off-site • County development

  27. Slide 27: Location of Transmission & Distribution Lines

    Location of Transmission & Distribution Lines Existing Proposed Transmission: • Distribution Lines Along Holly Manor Being Undergrounded Substation: • Transmission Lines now go further to front of property, but are 45’ inside property line Distribution: • Substation Equipment 50’ inside property lin

  28. Slide 28: Electromagnetic Fields (EMF)

    Electromagnetic Fields (“EMF”) • EMF, at various frequencies, is naturally present everywhere in the environment • It is also created whenever an electrical current is used • It is not only found near transmission and distribution lines, but also in homes, workplaces, schools, etc. • EMF “falls off”

  29. Slide 29: Sample household items that generate EMF

    Sample household items that generate EMF Distances from Source EMF Source (mG) 6 inches 1 Foot 2 Feet 4 Feet Fluorescent Lights 40 6 2 - PCs (with color monitors) 14 5 2 - Copy Machines 90 20 7 1 Color TVs Not measured 7 2 - Digital Clock Not Measured 1 - - Microwave Oven 200 4 10 2 Vacuum Cleaner 3

  30. Slide 30: Imagery Date: 10/12/2012 38°53'08.33"N__77°12'31.46"W elev 01ft eye alt 1464 ft ©

    Imagery Date: 10/12/2012 38°53'08.33"N__77°12'31.46"W elev 301ft eye alt 1464 ft ©

  31. Slide 31: ok as

    4 ok as %. ©2014 Google ti. olc r- Ai > — te . ~ a - ‘ ¥ ha she eee 4 Imagery Date: 10/12/2012 38°53'02.60" NW77°12'39.49" W elev 366 ft eye alt 1199 ft

  32. Slide 32: Sound Study

    Sound Study • Fairfax County requires 55 dba at property line • Proposed equipment is newer and quieter • Levels shown are without proposed wall • 14’ wall will mitigate sound even further

  33. Slide 33: Status of Application

    Status of Application • Planning Commission Hearing Date: February 11, 2015 • County has been drafting development conditions and staff report • Staff Report will be posted on the County website tomorrow © 2003 Dominion 33

  34. Slide 34: Community Contact

    Community Contact  Dominion will maintain a point of contact for citizens’ concerns  Tiffany Taylor-Minor with Dominion is the main point of contact  Email: powerline@dom.com or call 1-888-291-0190 © 2003 Dominion 34

  35. Slide 35: Questions?

    QUESTIONS? © 2003 Dominion 35

  36. Slide 36: Landscaping legend

    @ medium evergeen tree 6’ ht @ medium evergreen shrub © small evergreen shrub ©) seman deciduous tree © large deciduous shrub > existing tree line ] 20° tall red brick walt

  37. Slide 37: Existing, Future and Revised Substation Profile

    Existing Substation Profile Future Substation Profile Revised SE Proposal © 2003 Dominion 37