Petra Diamonds Limited · LSE:PDL

Petra Diamonds — Technical Presentation (February 2019)

46 slides from Petra Diamonds's technical presentation, February 2019

  1. Slide 1: Finsch Site Visit

    Finsch Site Visit 2 February 2019

  2. Slide 2: Important Notice

    Important Notice • These Presentation Materials are being supplied to you by Petra Diamonds Limited (the “Company”) solely for your information and use at this presentation. These Presentation Materials may contain information that is confidential, legally privileged or otherwise protected by law. T

  3. Slide 3: Finsch Site Visit Itinerary

    Finsch Site Visit Itinerary • 09:30 Visitors Induction (including Res-Q-Pack Training) and Overview of Visit • 10:00 To Change House for Personal Protective Equipment (PPE) • 11:00 Underground Visit • 12:30 Light Lunch/Corporate Social Responsibility Overview • 13:00 Control Room Overview • 13:30 Pl

  4. Slide 4: Finsch Diamond Mine Orientation

    Finsch Diamond Mine Orientation • Visitors Induction (including Res-Q-Pack Training) • Visit Orientation 4

  5. Slide 5: Visit Orientation – Surface

    Visit Orientation – Surface Open Pit Admin Conf Changehouse Sorthouse Lookout Point Room Lamproom & Shaft Control Room 5

  6. Slide 6: Visit Orientation – Underground

    Visit Orientation – Underground 6

  7. Slide 7: H1 FY 2019 Trading Update

    V4 H1 FY 2019 Trading Update

  8. Slide 8: Current Trading in H1 FY 2019

    Current Trading in H1 FY 2019 LTIFR improved to 0.16 in H1 FY 2019 (from 0.24) On track to meet guidance of 3.8 – 4.0 Mcts for FY 2019 • 2,019,147 carats produced in H1 FY 2019 (up 10% vs. H1 FY 2018) • H1 revenue up 8% to US$207.1 million • Diamonds sold increased 15% to 1,736,357 carats • Capex of

  9. Slide 9: H1 FY 2019 (six months to December 2018)

    H1 FY 2019 (six months to 31 December 2018) H1 FY 2019 H1 FY 2018 Variance FY 2018¹ Sales Diamonds sold Carats 1,736,357 1,510,361 +8% 3,793,799 Revenue US$m 207.1 191.7 +15% 495.3 Production ROM tonnes Mt 6.4 6.0 +7% 12.1 Tailings & other2 tonnes Mt 1.0 0.7 +43% 1.6 Total tonnes treated Mt 7.4 6.8

  10. Slide 10: About Finsch

    ea eS aS - ” About Finsch

  11. Slide 11: Location within Petra Portfolio

    Location within Petra Portfolio 11

  12. Slide 12: Finsch Overview

    Finsch Overview Fincham & Schwabel established Finsch Diamonds Extensive modifications treatment plant 1961 1963 1978 1980 1990 2002 2008 2011 1961 1980 14 Sep 2011 Established Finsch 1963rights Full mining 1978 First stage Upgrade of treatment Open 1990 pit operation Development of Second upgrade o

  13. Slide 13: The Petra Story Commences for Finsch – Oct 2011

    The Petra Story Commences for Finsch – Oct 2011 The first single boom Sandvik drill rig arrives at Finsch Mine 13

  14. Slide 14: Mine Site Layout

    Mine Site Layout 9 2 6 4 5 4 8 1 3 7 1 Underground 3 Post-79 TD 5 Waste rock dump 7 FRD’s 1,2 and 3 and Infill Dam 2 Pre-79 TMR 4 Overburden Deposit 6 Britz FRD 8 Old Paddocks 14

  15. Slide 15: Diamond Profile

    Diamond Profile • Rich in gem quality smaller diamonds • Highly commercial goods of +5 carats • Produces a number of +50 carat stones pa – both white and yellow diamonds Selection from tender 36cts & 43cts 53cts 43cts 2.9cts 2 classic models of 6-7.5cts 15

  16. Slide 16: Safety Performance

    Safety Performance Highest LTIFR (Petra) = 2012FY: 0.58 2008 = Lowest LTIFR in Finsch Mine history = 0.08 (De Beers) 2019FY YTD = Second lowest LTIFR in Finsch Mine history = 0.09 (Petra) Lowest LTIFR (Petra) = 2019FY YTD: 0.09 2014 = Third lowest LTIFR in Finsch Mine history = 0.10 (Petra) *LTIFR =

  17. Slide 17: SHE Achievements

    SHE Achievements Finsch was third place in the Northern Cape Mine Managers’ Association (NCMMA) Awards, for the underground mines safety category – November 2018 ISO14001:2015 OHSAS18001:2007 certification re-certification February 2018 February 2018 Achieved 1,000,000 Fatality Free Shifts - 21 July

  18. Slide 18: Finsch – H1 FY 2019 Trading Results

    Finsch – H1 FY 2019 Trading Results Unit H1 FY 2019 H1 FY 2018 Variance FY 2018 Sales Revenue US$m 87.0 100.8 -14% 231.9 Diamonds sold Carats 829 530 970 446 -15% 2 152 786 Average price per carat US$ 105 104 1% 108 ROM Production Tonnes treated Tonnes 1 503 335 1 559 280 -4% 3 084 395 Diamonds prod

  19. Slide 19: Block 5 SLC Mining and Development Programme

    Block 5 SLC Mining and Development Programme

  20. Slide 20: Geology

    Geology • Finsch pipe is hosted by banded ironstones at surface and thereafter dolomites of the Griqualand West Sequence of the Transvaal Supergroup • A Group II kimberlite pipe with an age of 118Ma • 17.9ha on surface • Main pipe tapers to 3.7ha and Precursor to 1.5ha at 880m • Truncates earlier Pr

  21. Slide 21: Finsch – Development Programme

    Finsch – Development Programme Highlights • SLC ramp up: • FY 2017 – 0.75 Mt • FY 2018 – 1.65 Mt • FY 2019 – 2.7 Mt • Total ROM throughput (from SLC and overburden) of 3.2 Mt – FY 2019 • Pre 79 Tailings treated – end FY 2019 21

  22. Slide 22: Underground Development

    Underground Development SLC rim intersection 63 Pillars SWPC 70, 73, 75 & 78 level rim drives complete SLC Phase 1 SLC Phase 2 BC Ground BC Sections 2,3 & 4 of Handling SLC ground handling tunnels complete 22

  23. Slide 23: Sub-level Caving

    Sub-level Caving • A cave where most of the recovered rock is drilled, charged and blasted • The face must continuously advance: • To disturb the column above • To manage the damaged brows • Performance is highly dependent on: • Extraction sequencing and disciplined following of it • Drill and blast

  24. Slide 24: Block 5 Sub-level Cave

    Block 5 Sub-level Cave Cycles of Mining the SLC Long hole drilling Charging & Blasting Loading & Tipping 24

  25. Slide 25: Finsch South-West Pre-Cursor

    Finsch South-West Pre-Cursor CAVED ORE 25

  26. Slide 26: Crushing & Conveyance

    Crushing & Conveyance Complete In Progress final commissioning January 2019 26

  27. Slide 27: Production Ramp-up

    Production Ramp-up Industrial Action Forecast 27

  28. Slide 28: Plant Overview

    ” Plant Overview

  29. Slide 29: Plant Infrastructure

    Plant Infrastructure Pre upgrade: • Original plant built – 1964 • First upgrade completed – 1980 • Underground operation commence – 1990 • Introduced Pre-79 dump retreatment – 2003 • Full contops since 2005 – capacity of 5.7 Mtpa Post upgrade: • Treatment plant upgrade – predominantly the DMS, recov

  30. Slide 30: Plant Overview

    Plant Overview Ore Reception Ore Preparation Concentration Mine Residue Disposal Recovery WIFS 30

  31. Slide 31: Simplified Process Flow

    Simplified Process Flow Shaft -300mm Primary Gyratory Crusher -150mm Buffer Stockpile Secondary & Tertiary Crushing High Pressure Rolls Crushing Coarse DMS -22mm Overspill Bin +22mm -150mm -22+ 1mm Feed Separation & -22+8mm Final Recovery Primary Scrubbing & Secondary Screening Scrubbing -1mm -8+1mm

  32. Slide 32: Treatment Profile

    Treatment Profile Industrial Forecast Action 32

  33. Slide 33: Typical Production Layout

    Typical Production Layout 33

  34. Slide 34: Operating Costs

    ” Operating Costs

  35. Slide 35: Operating Cost History and Make-up

    Operating Cost History and Make-up On-mine cash cost per tonne treated 450 6 400 • Risk of rising 5 electricity/potable water costs Million tonnes treated 350 300 4 managed through efficient R/t treated 250 design of new infrastructure 3 200 150 2 • Maintenance and 100 management of infrastructure 1

  36. Slide 36: Labour Relations – Risk Mitigation

    Labour Relations – Risk Mitigation • Labour relations at Petra’s South African operations were stable for the three year period up to the negotiation of a new three year deal in 2017 • September 2017: Finsch, Koffiefontein and KEM JV experienced labour disruption (contained to less than two weeks),

  37. Slide 37: Finsch Outlook

    Finsch Outlook • Transformation in production profile • Depletion of lower value Pre-79 tailings resource planned during H2 FY 2019 , with final cleanup in H1 FY 2020 • Ramp up of undiluted ore from new mining areas to contribute ca. 2.7 Mt in FY 2019 • Expected to lead to improving average product

  38. Slide 38: CSR

    CSR

  39. Slide 39: Northern Cape District Municipalities

    Northern Cape District Municipalities Finsch Diamond Mine falls within the Kgatelopele local Municipality (8) which includes the towns of Danielskuil and Lime Acres 39

  40. Slide 40: Corporate Social Responsibility Objectives

    Corporate Social Responsibility Objectives • Our objectives are: • Comply with legislation o 2018 Mining Charter of South Africa o S100 (2) (a) MPRDA as prescribed by the Department of Mineral Resources • To continue building effective relationships with employees, stakeholders and the community at

  41. Slide 41: Sustainability Focus Areas

    Sustainability Focus Areas • Infrastructure • Health Care Services • Community Development and Support • Education and Training: - Early Childhood Development (ECD) - Maths & Science - Outreach programmes • Sports, Arts and Culture 41

  42. Slide 42: Sustainability Focus Areas – Safety

    Sustainability Focus Areas – Safety Finsch wins safety awards Finsch employees take initiative to improve safety In 2018, for the third consecutive year, Employees from the Concentration section of the Finsch plant Finsch won the ‘National Winner of the took the initiative to implement several impro

  43. Slide 43: Sustainability Focus Areas – Health Care

    Sustainability Focus Areas – Health Care Partnership with the Department of Health (“DOH”) One of the issues identified with regards to health management within our workforce was access to practical healthcare for employees at Finsch. With the mine being located ca. 30km from the nearest town, many

  44. Slide 44: Sustainability Focus Areas – Education

    Sustainability Focus Areas – Education Finsch Mine’s Techno Girls Finsch, in partnership with the local government, hosts the ‘Techno Girls’ initiative twice a year. The objective of the initiative is to reverse the growing skills shortage in science, technology, engineering and mathematics in South

  45. Slide 45: Community Development and Support

    Community Development and Support Finsch provides support to community members seeking employment in order to contribute to alleviating poverty and unemployment in the community Services Provided • Computer and internet access • Business advice • Entrepreneurial training and business mentoring • Ass

  46. Slide 46: Thank You

    Thank You Further enquiries: Investor Relations investorrelations@petradiamonds.com +44 20 7494 8203 www.petradiamonds.com