  1. Slide 1: Bellevue Gold Project Investor Site Visit Presentation

    For personal use only Bellevue Gold Project Investor Site Visit Presentation 1 August 2025

  2. Slide 2: Disclaimers & Compliance Statements

    Disclaimers & Compliance Statements This presentation has been prepared by Bellevue Gold Limited (ABN 99 110 439 686) (Company or Bellevue) (ASX: BGL) and is authorised by the Managing Director & Chief Executive Officer of the Company. DISCLAIMER This presentation has been prepared by the Company ba

  3. Slide 3: Disclaimers & Compliance Statements (cont.)

    Disclaimers & Compliance Statements (cont.) FORWARD-LOOKING INFORMATION This presentation contains forward-looking statements. Wherever possible, words such as “intends”, “expects”, “scheduled”, “estimates”, “anticipates”, “believes”, and similar expressions or statements that certain actions, event

  4. Slide 4: Disclaimers & Compliance Statements (cont.)

    Disclaimers & Compliance Statements (cont.) JORC COMPLIANCE STATEMENTS It is a requirement of the ASX Listing Rules that the reporting of Ore Reserves and Mineral Resources in Australia comply with the 2012 Edition of the Joint Ore Reserves Committee’s Australasian Code for Reporting of Mineral Reso

  5. Slide 5: Disclaimers & Compliance Statements (cont.)

    Disclaimers & Compliance Statements (cont.) INVESTMENT RISK There are a number of risks specific to the Company and of a general nature which may affect the future operating and financial performance of the Company and the value of an investment in the Company, including and not limited to the Compa

  6. Slide 6: Bellevue at a glance

    Bellevue at a glance Positioned for growth in an established and fertile mining region, with a long life and strong cash flow For personal use only ▪ Long-life asset: 1.3Moz ORE; 3.1Moz MRE1 Jundee Northern Star Wiluna/Matilda Wiluna Mining ▪ Positioned for growth: New modern mine with growing produ

  7. Slide 7: Bellevue Gold Project

    Bellevue Gold Project Solar farm Cosmos Key infrastructure all in place – <5 years old Village For personal use only Westralia Pit Wind Farm TSF Airstrip Paris Portal Process Plant Bellevue Operations Highway Admin Tribune Power plant Box Cut Lake Vent Fans Miranda

  8. Slide 8: Safety – LTIFR 0.00

    Safety – LTIFR- 0.00 Embedded culture of safety and continuous improvement which is shaped by Bellevue’s core values Bellevue – 12MMA TRIFR / LTIFR 10 9.3 5 For personal use only Embedded Values-Based 8.7 8.6 8.7 Safety Systems Deliver 9 4.5 8.0 8.0 8.1 Positive Outcomes 8 7.4 4 PACE Core Values — P

  9. Slide 9: Bellevue Mine ramped up following first full year

    Bellevue Mine ramped up following first full year FY25 first full year of production complete. Building a platform for strong cash flow & production growth Built mine, built infrastructure to exit FY25 at production rates required for future growth For personal use only • Development rates Recovery

  10. Slide 10: Balance sheet strength following strong close to FY25

    Balance sheet strength following strong close to FY25 Sunk capital provides platform for strong free cash flow generation ▪ Cash & Gold ▪ Hedge commitments ▪ As at 30 June 2025 the Group had the following available ▪ Minimal forward contracts for remainder of CY25 For personal use only cash and gold

  11. Slide 11: Building a platform for further growth

    Building a platform for further growth FY25 ramp up and mine establishment complete. FY26 focus on establishing higher grade Deacon North & Viago FY25 Production FY26 Guidance FY25 production of 126koz, 130koz sold FY26 production of 130-150koz1 FY25 AISC of A$2,422/oz gold. Growth capex2 of $148M F

  12. Slide 12: Mining

    For personal use only Mining 12 12

  13. Slide 13: Mining

    Mining Long hole open stoping of 5 main mining areas. Paste fill PFS completed in CY23 with update planned for FY26 Mining overview Mining equipment For personal use only Two Underground Mines Fleet Make Number ▪ Paris Decline: South: Accesses the Deacon, Deacon North, Viago. North: Marceline and Ar

  14. Slide 14: Development rates drive operational performance

    Development rates drive operational performance Mine development advance ahead of budgeted development rates of ~270m per jumbo per month Key Timeline for underground: Quarterly Development Metres per Jumbo per month ▪ Development only mine from August 2020 – October 2023 For personal use only 400 G

  15. Slide 15: Recent improvements to mine planning and ops

    Recent improvements to mine planning and ops Building Consistency: Five jumbos for five mining areas allows the mine to focus on consistent delivery of mine plan Improved Local Knowledge: Refinement of mine plan with increased knowledge base of past mining and For personal use only geology, complexi

  16. Slide 16: Moving into more consistent mining areas

    Moving into more consistent mining areas ▪ Following establishment of infrastructure, stoping now focused on 5 key mining areas from FY26-FY29 ▪ More consistent mining expected in these areas relative to more challenging areas developed in FY25 ▪ Orebody remains open at depth and down plunge For per

  17. Slide 17: Ounce density set to substantially increase – Deacon mining area

    Ounce density set to substantially increase – Deacon mining area North Ounces per vertical metre: Deacon and Deacon North For personal use only Level 1390 1330 1270 1210 1150 1090 1030 970 910 850 790 730 670 Marceline oz density 0 2,000 4,000 6,000 significantly increases OUNCES PER METRE next leve

  18. Slide 18: Ounce Density Set To Substantially Increase – Viago mining area

    Ounce Density Set To Substantially Increase – Viago mining area North Ounces per vertical metre: Viago Level 0 OZPVM 2,000 For personal use only 1190 1150 1110 1070 1030 990 950 910 870 830 0 1,000 2,000 Ounces per metre Viago gentle dipping structure 200m and intersection with Bellevue Notes: Block

  19. Slide 19: FY26 Deacon Main Mining Area

    FY26 Deacon Main Mining Area ▪ Grade Control now completed for FY26 & indicates better grades & widths to come North For personal use only 100m Notes: 1. Refer to the Company’s ASX announcements dated 5 August 2019, 2 October 2019, 19 November 2019, 17 December 2019, 18 February 2020, 24 February 20

  20. Slide 20: FY26 Viago Mining Area

    FY26 Viago Mining Area ▪ Grade control functionally completed for FY26 & indicates better grades & widths to come ▪ Resolved Viago decline delays late in March 2025 quarter with stoping of this high-grade area to commence in FY26 For personal use only North Notes: 1. Refer to the Company’s ASX annou

  21. Slide 21: FY26 Deacon North Mining Area

    FY26 Deacon North Mining Area ▪ Access to major new mining area by end of FY26 to benefit production from FY27 onwards ▪ Grade control to be completed, FY26 focus is development down to this new mining area North For personal use only 100m Notes: 1. Refer to the Company’s ASX announcements dated 5 A

  22. Slide 22: FY26 Tribune Mining Area

    FY26 Tribune Mining Area ▪ New mining area. Portal, decline and infrastructure developed during H1 FY25 ▪ Significant increase in stoping in FY26. Grade control currently underway for FY26 For personal use only North Notes: 1. Refer to the Company’s ASX announcements dated 1 December 2017, 7 Februar

  23. Slide 23: Paste plant feasibility study

    Paste plant feasibility study Paste fill feasibility study update in FY26 – could materially increase long term value at Bellevue ▪ Option being considered is a targeted paste fill plan filling lower For personal use only Deacon and Deacon North only – ~115koz of material previously left in pillars

  24. Slide 24: Processing

    For personal use only Processing 24

  25. Slide 25: Processing Plant

    Processing Plant ROM Pad ▪ Standard gravity-CIL plant Crushing Circuit FOB ▪ 3 stage crushing, ball milling For personal use only ▪ Maintaining +94% recovery Ball Mill ▪ ~70% gravity recovery Gravity Upgrade ▪ 1.35 Mtpa expansion almost complete Complete Thickener includes: Modifications ▪ Gravity c

  26. Slide 26: Record processing throughput

    Record processing throughput ▪ Plant upgrade demonstrates its capability of achieving throughput rates equivalent to 1.35Mtpa ▪ Mill upgrade includes (4th) Knelson concentrator to improve gravity circuit efficiency and significant increase in oxygen delivery capacity to the CIL circuit For personal

  27. Slide 27: Exploration & Growth

    Exploration & Growth For personal use only 27

  28. Slide 28: Underground access opens up exploration potential

    Underground access opens up Southern Limit of Surface exploration potential Drilling post 1997 4.0moz1 921,000m of 0.12moz 11,800m of For personal use only NORTH of gold NEW drilling of gold historic drilling Deacon SHEAR Deacon SHEAR OPEN Bellevue SHEAR Bellevue SHEAR OPEN TRIBUNE SHEAR TRIBUNE SHE

  29. Slide 29: Exploiting the competitive exploration advantage

    Exploiting the competitive exploration advantage ▪ Conductive mineralisation drives more efficient discovery and target appraisal ▪ Several areas highlight the potential for future Resource growth with further drilling outside of known Resource areas For personal use only North STRONG DHEM CONDUCTOR

  30. Slide 30: Exploration Upside: Open down plunge & down dip

    Exploration Upside: Open down plunge & down dip ▪ Untested down plunge & down dip – Resource currently constrained by limit of drilling ▪ Orebody targeting aided by DHEM (geophysical) targeting that shows strong anomalies in target areas ▪ Southern drill drive extension will allow for staged explora

  31. Slide 31: System remains OPEN for repeat discovery

    System remains OPEN for repeat discovery Bellevue System remains open at depth Shear 1.4Moz For personal use only ▪ Parallel structure at depth in deep EIS funded drilling Deacon Shear ▪ 1.6m @ 9.3 g/t gold and 1.2m @ 9.0 1.5Moz g/t gold structure at depth ▪ Target area can now be cost effectively d

  32. Slide 32: Plant expansion option ~1.6Mtpa

    Plant expansion option ~1.6Mtpa ▪ Stage 1 expansion to 1.35Mtpa plant ✓ For personal use only Stage 1 - ✓ Stage 2 – substantially complete – gravity screen ✓ Gravity upgrade and additional gravity Extra BallMill Stage 1 - Upgrade concentrator, thickener modifications, O2 Thickener Modifications Spar

  33. Slide 33: Sustainability

    For personal use only Sustainability 33

  34. Slide 34: Sustainability is core to Bellevue's vision

    Sustainability is core to Bellevue’s vision Bellevue set to achieve net-zero greenhouse gas emissions by CY26 Renewable Energy ▪ 90 MW hybrid power station consisting of: 24 MW wind, 27 MW solar, 24 MW thermal and 15 MW/ 29 MWh Battery Energy Storage Solution For personal use only (BESS) ▪ Industry

  35. Slide 35: Power generation

    Power generation ▪ Bellevue Gold is forecasting annualised 80%-90% renewable energy penetration now that all four wind turbines are operating ▪ Pending the mine’s power demand and seasonality of solar and wind, the mine is forecast for 89% RE in FY26, therefore likely to be the most renewably powere

  36. Slide 36: Investment Highlights

    Investment Highlights Exceptional asset Optimised balance sheet For personal use only Long-life, high-grade gold mine in tier Optimised for cash flow generation one jurisdiction and de-risked via reduced hedge book until December 2025 Near term production Exploration upside growth Large exploration

  37. Slide 37: Regional Geology

    Regional Geology Wiluna Blackham Agnew-Wiluna Belt Geology ▪ Hosted in the Yakabindie domain of N the Agnew-Wiluna Greenstone Belt For personal use only 25 Kilometers ▪ Yakabindie domain consists of the layered Kathleen Valley gabbro Yilgarn Craton overlain by the tholeiitic Mt Goode Mt Keith Ni Ins

  38. Slide 38: Local Geology

    Local Geology Pillow Basalt Geology and Lithology Summary Integrated Surface Geology Clearly defined pillow rims with amygdales. Pillowed texture varies from intense to widely spaced rims, often containing inter ▪ Site geology is dominated by the Mount For personal use only pillow sulphide and bioti

  39. Slide 39: Mineral Resource and Ore Reserve Estimates

    Mineral Resource and Ore Reserve Estimates JORC 2012 RESERVE ESTIMATES FOR THE BELLEVUE GOLD PROJECT Tonnes Grade Contained Ounces Ore Reserve For personal use only (Mt) (g/t Au) (Moz) Probable High Grade Underground Ore Reserve 5.61 6.0 1.08 Probable Low Grade Underground Ore Reserve 2.86 2.1 0.20