Landore Resources Limited · LSE:LND
Landore Resources — Investor Presentation (May 2016)
19 slides from Landore Resources's investor presentation, May 2016

Slide 1: Landore Resources, May 2016
RESOURCE S AND®RE & ToT cline. May 2016 www.landofe.com

Slide 2: Board of Directors and Management
Landore Resources Ltd. BOARD AND MANAGEMENT: Board of Directors and Management Charles Wilkinson, Non-Executive Chairman Charles Wilkinson is a solicitor who retired from Lawrence Graham LLP in March 2005. At Lawrence Graham he specialised in corporate finance and commercial law and advised mining c

Slide 3: Landore Properties
Landore Properties 6 in Eastern Canada plus 30% Interest in West Graham CANADA USA NEWFOUNDLAND Hudson Bay AND LABRADOR QUEBEC ONTARIO Miminiska Lessard Lake Root Lake Junior Chibougamau Lake Mt. Fronsac Thunder Bay Seeley Lake NEW Sudbury BRUNSWICK Lake Superior Montreal West Graham Lake Huron Toro

Slide 4: Corporate Strategy
Corporate Strategy Focus on the highly prospective Junior Lake Property Investigate potential of the newly- discovered BAM East Gold Prospect Expansion of the existing B4-7 and VW compliant resources to +100,000 tonnes of Nickel Equivalent with objective to either develop in JV partnership or sell o

Slide 5: Junior Lake Property
Junior Lake Property 22,700 Hectares Junior Lake Property Despard Lithium Swole Lithium BAM East Gold BAM Gold Occurrence Prospect B4-7 Ni/Cu ONTARIO Deposit Junior VW Ni Deposit Lake Mining Leases 21-year renewable mining, surface rights 5

Slide 6: Junior Lake Project Infrastructure
Junior Lake Project Infrastructure Good road access Proposed Hydro Station Little Jackfish River Junior Lake Abundant water Proposed hydropower generating station (approx.20kms) Canadian National Rail (approx. 13kms) Thunder Bay port facilities 6

Slide 7: Junior Lake Project Exploration Camp and Core Storage Yard
Junior Lake Project Exploration Camp and Core Storage Yard 7

Slide 8: BAM East Gold Prospect
BAM East Gold Prospect RESOURCE L 3000E ‘500E Ww =] S ire N VW Deposit 300 metres Zz © TL 600N TL SOON MM-17 Baseline 00] _ T3008 | ~~_| Grassy Pond Sill, s MaxMin Anomaly Basic and ultrabasic intrusives Iron formation Meta-volcanics Felsic Metavolcanics Granitic rocks Diamond drill hole Hoon Metase

Slide 9: BAM East Gold Prospect Drilling
BAM East Gold Prospect Drilling Close to surface +30 metres wide gold mineralisation Consistent gold grades for 100 metres strike length, improving with depth Open to the east and west along strike and at depth Potential for the initial development to be progressed as a low cost, bulk tonnag

Slide 10: BAM East Gold Prospect: Gold Grades Improving to Depth
BAM East Gold Prospect Gold Grades Improving to Depth 10

Slide 11: BAM East Gold Prospect 2016 Proposed Work Plan
BAM East Gold Prospect 2016 Proposed Work Plan Phase 1: Q2-3 Exploration and Technical Works • Trenching and Channel sampling along the full extent of maxmin geophysical anomalies MM-7, MM- 17 and MM-18 • 2,500 metre drilling program to extend new gold zone down dip and along strike to the east and

Slide 12: Junior Lake Nickel Project
Junior Lake Nickel Project Expansion of the existing nickel resource to a minimum of 100,000 tonnes of Nickel Equivalent with the objective to either: • Develop in JV partnership Or • Sell outright VW Nickel Deposit – Katrina Zone 12

Slide 13: Nickel Project: B4-7 and VW Resources
Junior Lake Nickel Project B4-7 Nickel-Copper-Cobalt-PGE Deposit NI 43-101 – January 2013 RESOURCE CLASS VOLUME (tonnes) GRADE (% NiEq) Contained Metal (tonnes NiEq) Indicated 2,695,000 1.24 33,248 1,500,000 to Exploration Target ~1.24 ~20,000 2,000,000 Remains open along strike and down plunge

Slide 14: B4-7 Deposit Growth Potential
Junior Lake Nickel Project B4-7 Deposit Growth Potential Landore carried out drilling programs from 2013 to 2015 that tested the down-dip extension of the B4-7 Deposit. These down-dip drilling programs have been successful in extending the limits of the B4-7 Deposit along the down-dip direction by 2

Slide 15: B4-7 Deposit Down Plunge Potential
Junior Lake Nickel Project B4-7 Deposit – Down Plunge Potential 15

Slide 16: Work Completed late 2013-2015
Junior Lake Nickel Project Work Completed late 2013-2015 23,300 metres diamond drilling on the Junior Lake property since the last Resource Estimates; 16,910 metres of which on B4-7, VW Deposits Ground Direct Current Induced Polarization (DCIP) and Magnetotellurics (MT) survey on the area between an

Slide 17: Nickel Project 2016/17 Proposed Work Plan
Junior Lake Nickel Project 2016/17 Proposed Work Plan Phase 1 • Open pit design for the B4-7 deposit • Follow up drilling on priority targets as identified by Mineral Potential and Geophysical Review • Complete metallurgical works for optimisation of resources on both B4-7 and VW deposits Phase 2 •

Slide 18: Junior Lake Lithium Occurrences
Junior Lake Lithium Occurrences The Tape Lake Lithium Occurrence Rock chip samples from one pegmatite dyke returning 1.036%, 1.219% and 2.374% Li2O. Swole Lake Lithium Occurrence Despard Spodumene bearing pegmatite: Lithium Discovered by Occurrence Landore Drill hole 0411-304 returning interse

Slide 19: Other Properties and Assets
Other Properties and Assets MIMINISKA LAKE PROPERTY – GOLD • Exploration Target-503,000 tonnes at 5.34g/t for 86,375oz Au LESSARD PROPERTY – COPPER , ZINC, SILVER • Inferred Resource (NI43-101 compliant)-740,000 tonnes at 1.88% Cu + 3.50% Zn + 38.62g/t Ag and 0.84g/t Au for a NSR value of US$206.52/
Source: Internet Archive copy of landore.com
More decks from Landore Resources Limited
Investor Presentation (June 2026)23 slides · Jun 4, 2026
Investor Presentation (January 2024)29 slides · January 2024
Investor Presentation (November 2023)19 slides · November 2023
Investor Presentation (October 2023)27 slides · Oct 16, 2023
Investor Presentation (September 2023)26 slides · September 2023
Investor Presentation (August 2023)23 slides · August 2023