Oroco Resources Corp. · TSXV:OCO
Oroco Resources — Oroco Resource — Investor Presentation (November 2020)
25 slides from Oroco Resources's investor presentation, Nov 19, 2020
Slide 1: Oroco Resource Corp.
OROCO RESOURCE CORP. TSX-V OCO WWW.OROCORESOURCECORP.COM OROCO RESOURCE CORP JULY 2019 1
Slide 2: Forward Looking Statements
FORWARD LOOKING STATEMENTS This presentation contains certain forward-looking statements that reflect the current views and/or expectations of Oroco Resource Corp. (“Oroco”) with respect to its business and future events including statements regarding Oroco’s business and exploration plans. Forward-l
Slide 3: Technical Information / Qualified Person
TECHNICAL INFORMATION In this presentation, results from historical studies by Bateman Engineering (1994, 2003) and John Thornton (2011) are cited. The most recent Technical Report is titled "Geology, Mineralization, and Exploration of the Santo Tomas Cu-(Mo-Au-Ag) Porphyry Deposit, with an effectiv
Slide 4: Santo Tomas Porphyry Copper Project
SANTO TOMAS PORPHYRY COPPER PROJECT OROCO RESOURCE CORP. 4
Slide 5: Directors and Management
DIRECTORS AND MANAGEMENT Oroco is managed by industry veterans with experience in mineral deposit discovery, development, finance, and M&A Craig Dalziel, CEO and Director: Founder and initial financier of several public resource companies, including Oroco Resource Corp. in 2006. Over 35 years of financ
Slide 6: Technical Advisors & Qualified Persons
TECHNICAL ADVISORS & QUALIFIED PERSONS TECHNICAL ADVISORS Ken Thorsen, Senior Technical Advisor: A past President of Teck Exploration Ltd. responsible for exploration in 17 countries. Ken brings 50-years of experience in the mining industry including discoveries of the Leinster Mine (Ni-Cu) and Estr
Slide 7: Highlights
HIGHLIGHTS Rare opportunity to invest in a very large, outcropping porphyry copper deposit Current 62.1% ownership interest in the core concessions, which can be increased up to an 81% interest with additional project investment of up to CAD $28.5 million, and a 77.5% interest in surrounding concess
Slide 8: Mineral Concessions
MINERAL CONCESSIONS The Santo Tomas Core Concessions comprise 1,172.9 ha (the Santo Tomas Concessions on the figure). The surrounding Peripheral Concessions comprise 7,807.9 ha. Together, the Company controls 8,980.8 ha (22,192 acres or 34.7 sq. miles) of contiguous concessions. The Santo Tomas Prope
Slide 9: Exploration History
EXPLORATION HISTORY 1968 -1991: Exploration of the Core Concessions by ASARCO Mexicana S.A., Tormex Mining Developers Ltd., and Industria Minera Peñoles spanned 1968 to 1977, drilling a total of 50 holes comprising 16,003 m of length. 1992-1997: Exall Resources Ltd. (“Exall”) optioned the Property a
Slide 10: Technical Work in 2019 & 2020
TECHNICAL WORK IN 2019 & 2020 B. Tapsoba, Ph.D. and D. Bridge, P. Geol. conducted field structural geological mapping. Stevens & Collins reviewed the historical mineral resource estimate of Thornton (2011) and confirmed the tabulations of historical mineral resources. Cambria Geosciences updated and v
Slide 11: Historical Estimate – Constrained by a Historical Mine Scoping Study
HISTORICAL ESTIMATE – CONSTRAINED BY A HISTORICAL MINE SCOPING STUDY Stevens & Collins reviewed the historical MineSight resource estimate data (in the STD-MODREV model) of Thornton (2011) and prepared tabulations of Total Cu (“CuT”). Herein, Inferred is included in Waste for purposes of the histori
Slide 12: Historical Estimate – Constrained by a Historical Mine Scoping Study
HISTORICAL ESTIMATE – CONSTRAINED BY A HISTORICAL MINE SCOPING STUDY Thornton (2011) Historical Estimate: Measured (blue), Indicated (red), and Inferred (green). Shown in relation to the Phase 1-4 North Pit, and the Phase 5-6 South Pit. km 0 4. These estimates and mining studies inform recommendatio
Slide 13: Historical Estimate – Constrained by a Historical Mine Scoping Study
HISTORICAL ESTIMATE – CONSTRAINED BY A HISTORICAL MINE SCOPING STUDY A higher-grade portion of the North Pit area contains approximately 85% of the higher-grade material in the Historical Estimate, predominantly in a Stevens & Collins reviewed the historical MineSight coherent, shallow, central port
Slide 14: North Zone – Historical Drilling & 3D Geological Modelling
NORTH ZONE – HISTORICAL DRILLING & 3D GEOLOGICAL MODELLING Shown is Longitudinal Section P-20 in the central area of the North Zone. Geological modelling work of faults and mineralization was conducted prior to, and independently of, Thornton (2011). Higher-grade mineralization (red) is enclosed in
Slide 15: North Zone – Historical Drilling & 3D Geological Modelling
NORTH ZONE – HISTORICAL DRILLING & 3D GEOLOGICAL MODELLING South Zone Unit South Zone Extends Mx Extends +2 km +2 km Grade Shell southward southward Grade Shell North Cu > 0.30% Cu > 0.30% North Zone Zone Unit Nor Mx Nor t th h Brasiles Zone Brasiles Zone Extends Extends +2 km to NE +2 km to NE Clos
Slide 16: Recommendations – North Zone Phase One & Two Drilling
RECOMMENDATIONS – NORTH ZONE PHASE ONE & TWO DRILLING Open Open Open 3D Geological Model North Zone mineralized Unit Mx dips toward the bottom of this The 3D 2009 Grade Shell Cu > 0.30% encloses an initial exploration target that view. is recommended for drilling in Phase 1.1. Recommended drilling (
Slide 17: Recommendations – 3D Induced Polarization Survey
RECOMMENDATIONS – 3D INDUCED POLARIZATION SURVEY Looking NNW A 3D Induced Polarization Survey has been contracted for by the Company. Preparation of 200 Brasiles Zone Blind Target line-km of grid is nearing completion. Brasiles Zone The 3D mode of surveying delivers a multi-scale Extension data set
Slide 18: Location and Infrastructure
LOCATION AND INFRASTRUCTURE Located on the fringe of the Sierra Madre mountain range, on the “La Entrada al Pacífico” corridor, a federal Mexican-USA multimodal trade & transportation link between the Port of Topolobampo and Texas. Highway, mainline rail lines, the NW Mexican power transmission grid,
Slide 19: Location and Infrastructure
LOCATION AND INFRASTRUCTURE Huites Dam (Luis Donaldo Colosio Dam) is a flood control, irrigation, and hydropower facility proximal to Santo Tomas. TC Energy’s new natural gas pipeline (670 million cubic feet/day). High pressure gas can be potentially tapped directly to fuel power generation at Santo
Slide 20: Located in a Superior Mining Jurisdiction
LOCATED IN A SUPERIOR MINING JURISDICTION OROCO RESOURCE CORP. 20
Slide 21: Expectations for Copper and Sector M&A
EXPECTATIONS FOR COPPER and SECTOR M&A “Sustained growth in copper demand is expected to continue because copper is essential to economic activity and even more so to the modern technological society” - (International Copper Study Group) The value of mined copper in 2019 was approximately US $120 bi
Slide 22: Strong Liquidity Path, High Demand, Asset Scarcity, and Established Valuation Metrics
STRONG LIQUIDITY PATH, HIGH DEMAND, ASSET SCARCITY, AND ESTABLISHED VALUATION METRICS OROCO RESOURCE CORP. 22
Slide 23: Expectations for Copper and Sector M&A
EXPECTATIONS FOR COPPER and SECTOR M&A RFC AMBRIAN RESEARCH: Copper M&A … The Cupboard is Nearly Bare, November 2018 Potential acquisitors in “better financial shape” “… project pipelines of many of these companies is diminished” “… a number of companies … will have to participate in M&A in the near
Slide 24: Significant additional copper will be required for other parts of the EV supply chain
Significant additional copper will be required for other parts of the EV supply chain including charging infrastructure, energy storage, and grid. Forecast future copper consumption has resulted in heightened M&A in the copper sector. Source: GLENCORE presentation slides, 2019 Bank of America Global
Slide 25: Corporate Information
CORPORATE INFORMATION OROCO RESOURCE CORP.: HEAD OFFICE: CAPITAL STRUCTURE (November 17, 2020): 1201 - 1166 Alberni Street Shares Issued: 171,947,605 Vancouver, B.C. V6E 3Z3 Share Purchase Warrants: 11,227,100 Canada Incentive Options O/S: 5,965,000 Phone: (604) 688-6200 Fully Diluted: 189,139,705 F
Oroco Resource — Investor Presentation (November 2020) on 6ix