Var Energi Asa · OSL:VAR

Var Energi Asa — Q2 2023 Earnings Presentation

24 slides from Var Energi Asa's earnings presentation, Jul 25, 2023

  1. Slide 1: Second quarter and first six months 2023

    Second quarter and first six months 2023 Results presentation | 25 July 2023

  2. Slide 2: Disclaimer

    Disclaimer The Materials speak only as of their date, and the views expressed are subject to change based on a number of factors, including, without limitation, macroeconomic and equity market conditions, investor attitude and demand, the business prospects of the Group and other specific issues. Th

  3. Slide 3: Today's Vår Energi presenters

    Today’s Vår Energi presenters Torger Rød Stefano Pujatti Ida Marie Fjellheim CEO CFO Head of Investor Relations 3

  4. Slide 4: Second quarter 2023 highlights

    Second quarter 2023 highlights Solid performance on operated assets ▪ 88% production efficiency on operated fields and improved drilling performance ▪ Production impacted by maintenance, turnarounds and unplanned downtime at partner-operated fields Continued high gas price realisation ▪ Gas sales st

  5. Slide 5: Neptune acquisition summary

    Neptune acquisition summary Neptune Norway’s high-quality NCS assets located near existing hub areas The Barents Sea Operator of Goliat and partner in Key terms and conditions the Johan Castberg development ▪ Vår Energi to acquire 100% of the shares of Neptune Energy Norge AS Snøhvit Highly strategi

  6. Slide 6: Key performance indicators

    Key performance indicators Q2 2023 vs. Q1 2023 Actual serious incidents frequency1 Production Cash flow from operations 0.0 202 kboepd USD 231m (0.0) (214) (1 358) CO2 emissions intensity Production cost per boe Dividend for the quarter 11.5 kg/boe USD 15.5 USD 270m (13.0) (13.1) (270) 6 1. 12 month

  7. Slide 7: Operational review

    ar energi Pe V. Operational review

  8. Slide 8: Continuous work on safe and responsible operations

    Continuous work on safe and responsible operations SIF1 and TRIF2 18 CO2 emission intensity for operated assets kg CO2/boe 16 3.8 14 13.0 12 11.5 2.7 2.8 10 8.6 8 1.4 6 4 0.5 0.6 2 0 Q2 2022 Q1 2023 Q2 2023 Q2 2022 Q1 2023 Q2 2023 SIF TRIF ▪ No serious incidents in the quarter ▪ Reduced emission int

  9. Slide 9: Turnarounds and seasonal maintenance in the quarter

    Turnarounds and seasonal maintenance in the quarter Production, production efficiency1 and product mix kboepd 1,0 ▪ Developments coming on stream 89% 88% ▪ Hyme, Bauge and Fenja on stream in April 85% 0,9 ▪ Volumes lower than expected due to start-up 0,8 challenges at the Njord host 0,7 214 214 210

  10. Slide 10: Solid performance on operated assets

    Solid performance on operated assets Goliat ▪ Continued stable performance on Goliat with 93% production efficiency ▪ Three-day planned maintenance stop completed on plan Balder/Ringhorne ▪ Production efficiency of 83% with planned maintenance in the quarter ▪ Restart of the riser at Ringhorne in Ma

  11. Slide 11: Quarterly production cost impacted by seasonal maintenance

    Quarterly production cost impacted by seasonal maintenance Production cost per boe produced1 USD per boe 18 17 16 15.5 15.5 ▪ Impact from lower production, higher maintenance activity 15 14.1 14.3 2023 guidance and currency effects 14 13.1 13.3 14.5 13 12 11 ▪ Full-year 2023 opex per boe guidance ma

  12. Slide 12: Jotun FPSO refloated and turret successfully installed

    Jotun FPSO refloated and turret successfully installed Key milestones met: Drilling and SPS/SURF progressing well: On critical path, key focus areas: Major heavy-lift installations completed Seven of 15 producing wells completed Increase productivity High construction activity Front-loading subsea c

  13. Slide 13: Project portfolio progressing according to schedule

    Project portfolio progressing according to schedule Existing production and sanctioned developments Breidablikk First oil field extension First oil new field development Started production ▪ The High Activity Period (HAP) on Grane topside has been completed and flotel demobilised Hub areas Operator

  14. Slide 14: Updated 2023 exploration campaign

    Updated 2023 exploration High-value exploration near existing hubs campaign Venus – (2024) Countach - Q1 Discovery Est. recoverable resources: Pre-drill unrisked mmboe1,2: 94 3-13 mmboe Vår Pre-drill Pre-drill License Prospect Operator Energi unrisked unrisked Status share mmboe mmboe VE PL 229 Coun

  15. Slide 15: Financial review

    Financial review

  16. Slide 16: Key financials

    Key financials USD million Q2 2023 Q1 2023 Q2 2022 1H 2023 1H 2022 Petroleum revenues 1 432 2 089 2 423 3 521 4 906 EBIT 778 1 432 1 725 2 210 3 475 Profit before taxes 701 1 276 1 265 1 977 2 992 Production cost (USD/boe) 15.5 13.1 14.7 14.3 13.3 Operating CF before tax 1 285 1 935 1 864 3 220 4 24

  17. Slide 17: Continued high realised gas price

    Continued high realised gas price Total petroleum revenues Q2 2023 gas revenues USD million 4 906 Oil Gas NGL ▪ Month and day ahead sales weighted towards France and Germany with ~36% of volumes exposed to high Month ahead prices 2 484 3 522 ▪ Fixed price sales included contracts with Gas Year Ahead

  18. Slide 18: High cash tax payments in Q2 related to 2022 results

    High cash tax payments in Q2 related to 2022 results CFFO and capex Income tax paid USD million 1 000 USD million 3.5 3 735 500 3.0 0 2.5 ~(250) 2.0 (329) -500 ~(500) (512) (577) 1 589 1.5 1 535 1 358 1 330 -1 000 1 195 (1 054) 1.0 642 687 573 -1 500 0.5 231 (1 631) 0.0 -2 000 Q2 2022 Q1 2023 Q2 202

  19. Slide 19: Continued strong liquidity position

    Continued strong liquidity position Cash flow development Q2 2023 Available liquidity USD million USD million 28 195 26 24 22 20 18 1 090 3 000 16 14 (1 054) 12 769 231 3 000 10 8 73 6 4 (696) 4 111 769 2 (270) 111 0 Cash at end- CFFO Working Taxes paid CFFO after tax Cash flow Net financing Dividen

  20. Slide 20: Optimising the long-term financing structure

    Optimising the long-term financing structure Net interest-bearing debt and leverage ratio1 Maturity profile USD billion USD million EUR 600 million bond issue in April 13 1.0 2023 to refinance the remaining USD 0.8 500 million bridge-to-bond 12 0.4x 0.4x 0.6 11 0.3x 0.4 10 0.2 0.0 9 1 500 1 500 8.1

  21. Slide 21: Maintaining attractive and resilient distributions

    Maintaining attractive and resilient distributions Dividends USD million ▪ Dividend guiding for Q3 2023 of USD 270 million (~0.11 USD per share) 300 290 270 270 270 ▪ Expected dividend for 2023 of approximately 30% of CFFO after tax ▪ Dividend for Q2 2023 of USD ~0.11 per share to be paid 14 August

  22. Slide 22: Guidance for 2023 maintained

    Guidance for 2023 maintained 2023 outlook Actual 1H 2023 Production 210-230 kboepd 208 kboepd Production cost USD 14.5-15.5 per boe USD 14.3 per boe USD 2.4-2.7 billion excl. exploration and abandonment USD 1.3 billion Capex Exploration USD ~200 million Exploration USD 95 million Abandonment USD ~50

  23. Slide 23: Summary

    Summary Solid performance on operated assets Continued high price realisation Project portfolio progressing per schedule Accelerating growth and value creation 23

  24. Slide 24: Second quarter and first six months 2023

    Second quarter and first six months 2023 Results presentation | 25 July 2023

Vår Energi — Q2 2023 Earnings Presentation on 6ix