Slide 1: 2019 Interim Results
2019 Interim Results Gulf Marine Services 30 September 2019

Slide 2: Contents
Contents • Governance • Current Status • H1 2019 Results • Outlook • Q&A IR@gmsuae.com 2

Slide 3: Governance
Governance Shona Mo Mike Tim Tim Turner Summers Grant Bississo Summers (SID) (Exec (INED) (NED) (Chairman) Chairman) David Blewden (INED) EGM Steve Motions Kersley defeated (CFO) May 2018 --------Oct-----------Nov-----------Dec----------Jan-----------Feb-------------Mar------------Apr--------------M

Slide 4: Current Status
Current Status Safe and Reliable Operations Continued strong safety performance: zero lost time injuries incurred (H1 2018: zero) RNS 21 August 2019 CEO change Guidance reset Banking update H1 2019 Results Adjusted EBITDA: US$ 22.3 million (H1 2018: US$ 25.4 million) Adjusted EBITDA margin: 41% (H1

Slide 5: Contract Backlog Strengthening
Contract Backlog Strengthening 2019 2020 2021 2022 VESSEL K-CLASS & P-CLASS K-Class K-Class K-Class K-Class K-Class P-Class S-CLASS S-Class S-Class S-Class E-CLASS E-Class E-Class E-Class E-Class ▪ Demand in the Middle East is strengthening ▪ Backlog improving: US$ 210.5m as at 29 September 2019 com

Slide 6: H1 2019 Income Statement
H1 2019 Income Statement US$ million H1 2018 H1 2019 Revenue 56.1 55.0 • Revenue flat at US$ 55.0 million Cost of sales (34.8) (40.9) • Utilisation improved but pressure Impairment charge - (4.6) on vessel day rates remained General and administrative expenses (9.1) (8.6) EBITDA 25.4 17.7 • Impairme

Slide 7: Sources and Uses of Cash
Sources and Uses of Cash 55.0 (25.2) 50.0 H1 2019 (7.5) 30.0 (6.0) 5.0 (15.6) (1.1) 10.0 (10.3) (10.0) (30.0) Revenue Opex Overheads Capex and Changes in Drawdown Interest Loan other Working Repayment Capital 56.1 (22.3) 50.0 H1 2018 (8.4) (14.0) 30.0 (33.0) 10.0 20.0 (16.3) (10.0) (11.7) (30.0) Rev

Slide 8: Balance Sheet
Balance Sheet Summary • Impairment: US$ 1.8 million on Our fleet Naashi, a 37-year-old non-core • Net book value US$ 730.0m vessel and US$ 2.8 million on • Dry docking US$ 3.4m other vessel equipment (cantilever) Working capital • Working capital excluding bank borrowings and lease liabilities • At

Slide 9: Vessel Performance
Vessel Performance K-Class S-Class E-Class Total Core SESVs (Small) (Mid) (Large) (6 vessels) (3 vessels) (4 vessels) (13 vessels) H1 H1 H1 H1 H1 H1 H1 H1 2018 2019 2018 2019 2018 2019 2018 2019 Utilisation based on calendar days 58% 65% 74% 96% 48% 54% 62% 69% Average charter day rate excluding hot

Slide 10: Cost Savings Ahead of Target
Cost Savings Ahead of Target Annualised savings 2019 G&A reductions 8% 1% People 25 9% Facilities Vessel Catering 20 US$ m 18% Third Party Suppliers Other 15 64% 10 2014 2015 2016 2017 2018 2019E G&A ▪ Target for annualised savings (US$ 6.0 million) exceeded; revised target US$ 8.5 million. ▪ Total

Slide 11: Capital Expenditure at Minimal Levels
Capital Expenditure at Minimal Levels US$ 213m 210 Maintenance Capex US$ Ensures vessels 180 145m remain operational US$ Reimbursable Capex 150 109m Capex incurred, paid for partially/fully by USD$ m 120 client US$ US$ Client Specific 90 32m 18m US$ 6m Required to meet 60 contract requirements Discr

Slide 12: Revenue Mix
Revenue Mix Revenue by vessel class Revenue by geographical location 29% 32% 34% 28% H1 37% H1 28% 2018 2019 72% 72% 34% 33% NW Europe E-Class (Large) Vessels K-Class (Small) Vessels H1 2018 H1 2019 S-Class (Mid) Vessels Middle East Revenue by customer Revenue by type 9% 9% 33% 28% 28% 28% H1 H1 49%

Slide 13: 2019 EBITDA Guidance Reset
2019 EBITDA Guidance Reset (RNS 21 August 2019) 60 58 55 50 45-48 US$ m -7 45 -4 -2 40 35 Prev Forecast Utilisation NW Utilisation Middle Day Rates Revised Forecast Europe East 13 13

Slide 14: Bank Negotiations
Bank Negotiations • Intensive discussions between lenders and new Board and management over the last three months over provision of a waiver and rephasing of the bank facilities • Waiver for 30 June covenant test agreed. Access to bonding facilities granted. Working capital facility rolled over unti

Slide 15: Challenging Conditions since IPO
Challenging Conditions since IPO Utilisation Falling day rates 100% 100 80% 80 US$ k 60% 60 40% 40 20% 20 0% - 2014 2015 2016 2017 2018 H12019 2014 2015 2016 2017 2018 H12019 E-Class S-Class K-Class E-Class S-Class K-Class 15 15

Slide 16: Customer Diversification
Customer Diversification Geography UAE 27% 41% Other 59% 73% 2015 H1 2019 16 16

Slide 17: Middle East Outlook
Middle East Outlook Next five years and beyond: Significant increase in SESV demand in GMS’ key markets expected: High levels of E&P investment: US$ Enhanced oil recovery critical to 134 billion expected on regional offsetting natural production decline and offshore activities to 2023 NOCs achieving

Slide 18: NW Europe Outlook
NW Europe Outlook Renewables Oil & Gas • Commissioning of Round 3 Offshore Wind Farm • Recent restructuring of the E&P landscape (from projects UK expected to stretch existing SESV major IOCs to smaller E&P companies) has caused capacity pause in investment as new entrants refocus efforts to maximis

Slide 19: Summary
Summary Safe and • Continue to deliver excellent safety and operational performance reliable • Continue to deliver operational efficiencies to customers • Annualised savings target exceeded (US$ 8.5m vs US$ 6m) Low-cost • Further opportunities to drive cost improvements operations Strengthening • Si

Slide 20: Disclaimer
Disclaimer This presentation has been prepared by Gulf Marine Services PLC (the "Company") and comprises the slides for a presentation to analysts concerning the Company. This presentation has been prepared solely for informational purposes and does not constitute or form part of or contain any invi
Source: Internet Archive copy of gmsplc.com
More decks from Gulf Marine Services PLC
Investor Presentation (September 2026)31 slides · September 2026
Investor Presentation (April 2026)25 slides · April 2026
Investor Presentation (September 2025)25 slides · September 2025
Investor Presentation (April 2025)24 slides · April 2025
Investor Presentation (January 2025)23 slides · January 2025
Investor Presentation (October 2024)23 slides · October 2024