Bumi Armada Bhd. · MYX:ARMADA

Bumi Armada Bhd — Q1 2012 Earnings Presentation

21 slides from Bumi Armada Bhd's earnings presentation, May 28, 2012

  1. Slide 1: Q1 2012 Results Briefing

    Q1 2012 Results Briefing 28th May 2012 “Knots Ahead of the Rest”

  2. Slide 2: Disclaimer

    Disclaimer This document may contain statements of future expectations and other forward-looking statements based on management’s and/or other information providers’ current views and assumptions and involve known and unknown risks and uncertainties that could cause actual results, performance, or e

  3. Slide 3: The leading indicators are still positive

    The leading indicators are still positive Source: Bloomberg Oil prices remain in positive territory above USD70 per barrel. The pull-back from over USD120/ barrel will deter speculators and reduce the likelihood of “over-heating”. Source: IEA 3

  4. Slide 4: The leading indicators are still positive (cont.)

    The leading indicators are still positive (cont.) Infield Systems The outlook for global offshore E&P Increasingly oil from deepwater, investment continues to be bullish. harsh environments. 4

  5. Slide 5: Overview of our four business

    Overview of our four business Enable effective project management and cost REVENUE DRIVERS control 1 2 3 4 5 6 Floating Production Offshore Transport Oilfield Fleet Storage and Offloading Support and Installation Services Services Engineering, Procurement Management Services (FPSO) Vessel (OSV) (T&I

  6. Slide 6: Strategic focus: Further, Deeper, Harsher

    Strategic focus for the business units FURTHER, DEEPER, POTENTIAL HARSHER Large Ultra- PLANNED FPSO Deep Water CURRENT Medium Deep FPSO Deep Water Small Mid FPSO Shallow Water Shallow 6 6

  7. Slide 7: A Malaysia-based international offshore services provider

    A Malaysia-based international offshore services provider Turkmenistan 1 office UAE 1 shore base 1 marketing office Turkmenistan UAE Armada Installer India MEXICO Office for JV with Forbes & 1 shore base AFRICA Company Limited 2 shore bases D1 FPSO Mexico 1 JV office Armada TGT 1 India Venezuela Nig

  8. Slide 8: Our key strengths remain intact

    Our key strengths remain intact A Malaysia-based international offshore services provider (3A strategy). Established and expanding FPSO operator (5 active contracts). A large and modern OSV fleet with cross-border operability (47 vessels). Established partnerships with customers as well as with the

  9. Slide 9: Overview of the first quarter

    Overview of the first quarter Q1 2012, revenue of RM335 million. First quarter net profit increased y-o-y to RM90 million. OSV fleet added one new 3000 DWT PSV (Armada 301), which was chartered to Petrobras in Brazil. She takes our total of OSV vessels in Brazil to three. The Armada Installer comple

  10. Slide 10: Continuing our deep-water OSV fleet expansion

    Continuing our deep-water OSV fleet expansion ARMADA TUAH 301 & 302 300 DWT PLATFORM SUPPORT VESSEL (PSV) AT301 Chartered to Petrobras on a 4-yr + 4x 1-yr contract, announced on 21st March 2012. Armada Tuah 301 Armada Tuah 302 ARMADA TUAH 107 & 108 12,000 BHP - DEEPWATER AHTS Acquired from Sanko Ste

  11. Slide 11: FPSO update

    FPSO update FPSO D1 – ARMADA STERLING IN DRY-DOCK FOR HULL PAINTING LEAVING DRY-DOCK FULLY PAINTED 11

  12. Slide 12: T&I update

    T&I update 800 MT CRANE HAS BEEN FULLY INSTALLED ARMADA HAWK Secured a USD200 million installation contract with Lukoil for the Filanovsky Field Development project , which was announced on 16th April 2012. More projects in the pipeline for the Armada Installer in the Caspian 12

  13. Slide 13: OFS Focus

    OFS Strategy …spearhead Bumi Armada’s move into Services • Extend, leverage Bumi Armada’s core competencies • Spearhead our extension into Services • Step by step approach, taking on selective partners & collaborative JV’s to capture space • Position us as a preferred Malaysia-based international in

  14. Slide 14: Financial Performance

    Financial Performance “Knots Ahead of the Rest”

  15. Slide 15: Results overview – Q1 2012 vs. Q1 2011

    Results overview – Q1 2012 vs. Q1 2011 Net Profit* 22% 27% Revenue 200.0 376.2 20% 150.0 0% -20% 335.1 100.0 82.1 89.7 -40% -60% 50.0 -80% Q1 2011 Q1 2012 - -100% Q1 2011 Q1 2012 Lower revenue from the OFS and T&I segments, higher revenue from the FPSO & OSV segments EBITDA Higher profit by 9.3% 500

  16. Slide 16: Revenue composition by business unit

    Revenue composition by business unit Revenue by business unit (RM m) Revenue composition by geographical % 400.0 100% 376.2 4% 7% 90% 350.0 3.7 79.1 80% 25% 32% 300.0 51.3 70% 73.9 250.0 60% 114.2 200.0 50% 36% 97.9 40% 44% 150.0 30% 100.0 165.9 20% 125.3 32% 50.0 10% 19% - 0% YTD March 2011 YTD Mar

  17. Slide 17: Leverage and capitalization

    Leverage and capitalization Net Debt / EBITDA(1) Gearing ratio 4.5x 6.0x 4.0x 4.0x 3.9x 5.1x 5.0x 4.9x 4.8x 3.4x 3.5x 3.0x 4.0x 2.5x 3.0x 2.0x 1.9x 2.0x 1.5x 2.0x 1.0x 0.9x 0.8x 1.0x 0.5x 0.0x 0.0x 2008 2009 2010 Q4 2011 Q1 2012 2008 2009 2010 Q4 2011 Q1 2012 Total debt of RM2.9b to shareholders fun

  18. Slide 18: Order book

    Order book As at 31 March 2012, the Group’s order book stood at RM7.0 billion. Upon expiration of the firm contract period, certain contracts contain extension options which are renewable on annual basis with a total potential contract sum of RM3.1 billion over the entire option periods. Firm contra

  19. Slide 19: Outlook

    Outlook “Knots Ahead of the Rest”

  20. Slide 20: Outlook for BAB

    Outlook for BAB FPSO Submitted bids for Cluster-7 (ONGC, India). Continue to bid on projects in Asia and Africa. OSV Expand the fleet – buy and build. Focus remains in Asia, Africa and Latin America. T&I Secure additional work for the Armada Installer with a view to maximising her utilisation in the

  21. Slide 21: Q&A

    Q&A ee BUMIARMADA “Knots Ahead of the Rest”