Slide 1: BW Offshore - Pareto Oil & Offshore Conference
NOT FOR PUBLIC DISTRIBUTION, DIRECTLY OR INDIRECTLY, IN OR INTO THE UNITED STATES OF AMERICA, CANADA, SOUTH AFRICA, AUSTRALIA OR JAPAN BW Offshore Pareto Oil & Offshore Conference 1 September 2010 Picture: Petrobras
Slide 2: Disclaimer
Disclaimer This Presentation has been produced by BW Offshore Limited ( “BW Offshore”) exclusively for information purposes. This presentation may not be redistributed, in whole or in part, to any other person. This document contains certain forward-looking statements relating to the business, finan
Slide 3: BW Offshore
BW Offshore Leading position in a FPSO market set for growth Demonstrated capability to undertake demanding projects Demonstrated cost and execution control Demonstrated operational stability Strong funding provide opportunities for growth organically and through M&A 1 September 2010 3
Slide 4: Market & Operations
MARKET & OPERATIONS
Slide 5: Market situation
Market situation Limited competition South East Asia • 2-3 bidders per project (max) • 20-30 opportunities • Price • Limited technology requirements Brazil • Limited local content issues • 30-40 opportunities • All types of commercial regimes • Local content • Size of projects Gulf of Mexico • Techn
Slide 6: Industry challenges
Industry challenges Effect of recent events – GOM disaster (on the offshore oil industry) − Barriers to entry will get higher − Only proven equipment will be accepted − Players will need to be bigger and have track record Capital constrained rather than opportunity constrained − Other sources of cap
Slide 7: FPSO awards
BW Offshore perspective Financial strength and track record increasingly important factors to secure contracts Focus on project robustness, financial return and risk factors Clients favors the large and established players. 30 25 FPSO awards 20 15 10 5 0 2005 2006 2007 2008 2009 2010e 2011e 2012e Aw
Slide 8: BW Offshore with record order intake
BW Offshore with record order intake USD 1.4 billion contract inflow since January BW Offshore’s success is primary a result of − Project execution − Operational excellence − Financial robustness FPSO awards 2010 - Lease Number of awards Contractor Field Operator Country Comments BW Offshore Athena
Slide 9: Long term contracted cash flow
Long term contracted cash flow 2007 2010 2015 2020 2025 Sendje Berge Nigeria: Addax/Sinopec– 2011 (2013) Berge Helene Mauritania: Petronas – 2013 (2021) Yùum K’ak’Náab Mexico: Pemex – 2022 (2025) BW Cidade de São Vicente Brazil: Petrobras – 2019 (2024) BW Pioneer US: Petrobras – 2015 (2018) BW Carme
Slide 10: FPSO BW Pioneer
FPSO BW Pioneer BW Pioneer has passed the inspection on 25th of August − Important milestone in completion of project − Full compliance with US regulations − Onshore and offshore personnel ready for operation Standby day rate (95%) of full day rate will commence after the vessel has been hooked up t
Slide 11: FPSO P-63 (Papa Terra)
FPSO P-63 (Papa Terra) Project is progressing according to schedule − BW Nisa (ULCC) at COSCO Dalian Shipyard − Demolition work well under way − In first drydock from 30 July to end September − Steel renewal and life extension work started Long lead items successfully contracted − 50% of budget comm
Slide 12: FPSO OSX-1
FPSO OSX-1 Contract signed 14 July 2010 − Total value of the works USD 150 million − Completion mid 2011 OSX has engaged BW Offshore to complete the FPSO OSX-1 − Topside extensions to operate in the Campos Basin offshore Brazil − Delivery of a Submerged Turret Production (STP) system from APL 1 Sept
Slide 13: FPSO for Terang Sirasun Batur
FPSO for Terang Sirasun Batur Contract signed 15 July 2010 − Total contract value USD 875 million − 10 year fixed contract (up to 14 years including options) First gas early 2012 − Gas FPSO (340 mmscfd) Kangean Energy Indonesia (KEI) partners − Energi Mega Persada (50%) − Mitsubishi (25%) − Japex (2
Slide 14: FPSO operations
FPSO operations Production uptime Production uptime − Q2 2010: 99.9% 100.0 − 5 year average: 99.5% 99.0 98.0 97.0 High HSE level maintained 96.0 95.0 Improving operational efficiency 94.0 93.0 92.0 91.0 90.0 2005 2006 2007 2008 2009 1H'10 5.00 4.50 4.00 3.50 3.00 2.50 2.00 1.50 1.00 0.50 0.00 Lost t
Slide 15: Order backlog (MUSD)
APL building momentum First evidences of market pick up − Order backlog at USD 233 million per end Q2 2010 Gas market activity improving Significant variations in market activity by region New orders – signed and in progress − Offloading systems for Goliat (ENI) − STP OSX-1 (OSX) − Mooring and riser
Slide 16: Solid financial position
Solid financial position Growing operational cashflow based on fixed long term contracts − USD 156 million in 1H 2010 Run-rate EBITDA on current portfolio is USD 275-325 million* Remaining net cash outflow is USD 300 million* Unsecured RCF of USD 1,500 million − LIBOR +125 bps to May 2013 − Utilised
Slide 17: Voluntary offer for Prosafe Production
Voluntary offer for Prosafe Production The FPSO market is growing and the sector needs larger companies that can meet the increasing requirements from clients and regulators A combined BW Offshore and Prosafe Production will address these needs through − Diversification − Presence − Financial scale
Slide 18: Summary
SUMMARY
Slide 19: Higher returns for BW Offshore's projects
Higher returns for BW Offshore’s projects Positive market outlook − Target good return projects − Will not agree to undue contractual risk Expect further improvement in terms and returns on new charter contracts − Improved contracts − Lower prices from suppliers − Improved project delivery process 1
Slide 20: Set for profitable growth
Set for profitable growth Demonstrated operations and project development capabilities Order book of USD 4.2 billion after USD 1.4 billion in new contracts Positive market development - larger established players with consistent track record best positioned to strengthen market positions BW Offshore
Slide 21: 1 September 2010
1 September 2010 21
Slide 22: Appendix
s a) Zz Lu o. o. <4 =
Slide 23: APL turnkey solutions
APL turnkey solutions Production systems Terminal systems Submerged Turret Production Submerged Turret Loading (STL) (STP) for FPSO for LNG and Shuttle Tankers Submerged Turret Loading (STL) Single Anchor Loading (SAL) for for FSO Shuttle Tankers External Turret Production (ETP) for FPSO Buoy Turret
Slide 24: Units on contract
Units on contract Sendje Berge, FPSO Sinopec, Nigeria 60,000 bopd processing 55 mmscfd gas compression 2,000,000 bbls storage Spread mooring Yùum K’ak’Náab, FPSO Pemex, Mexico 600,000 bopd handling 200,000 bopd processing 2,500,000 bbls storage Disconnectable turret mooring Berge Helene, FPSO Petron
Slide 25: Units on contract
Units on contract Belokamenka, FSO Sovkomflot, Russia 2,400,000 bbls storage Cargo heating system Spread mooring BW Pioneer, FPSO Petrobras, US 80,000 bopd processing 25.6 mmscfd gas export 600,000 bbls storage capacity Disconnectable turret mooring Picture: Petrobras Double hull (M/T Sarasota) BW C
Slide 26: Units on contract
Units on contract P-63 (Papa Terra), FPSO Petrobras, Brazil ULCC (322.000 dwt) 2,200,000 bbls storage capacity BW Nisa - construction contract BW Cidade de São Vicente, FPSO Petrobras, Brazil 40,000 bopd oil processing 1,000,000 bbls storage capacity Prepared for facilities upgrades TSB, FPSO Kangea
Slide 27: Available units
Available units BW Ara ULCC (322.000 dwt) 2,000,000 bbls storage capacity 1 September 2010 27
Slide 28: Further information
Q3 2010: 30 November 2010 Further information: www.bwoffshore.com IR contact: Kristian Flaten, VP Finance & IR kristian.flaten@bwoffshore.com 1 September 2010 28