Seva Mining Corp. · TSXV:SEVA
Seva Mining — Investor Presentation (October 2026)
19 slides from Seva Mining's investor presentation, October 2026
Slide 1: Advancing The Cameron project in NW Ontario
Advancing The Cameron project in NW Ontario October 2026
Slide 2: Cautionary Legal Disclaimer and Forward-Looking Statements
Cautionary LEGAL DISCLAIMER The information contained in this presentation and other information furnished by or on behalf of Seva Mining Corp ("Seva Mining") is FORWARD-LOOKING STATEMENTS AND INFORMATION statements confidential and has been prepared to assist the recipients hereof in This presentat
Slide 3: Led By The Fiore Group
SEVA MINING 3 Led By The Fiore Group Delivering Consistent Returns For Shareholders and Capitalizing On Gold Cycles Frank Giustra Gordon Keep Proven leadership + credibility: Led by Frank Frank Giustra is a leading Gordon Keep is a veteran Giustra and Gordon Keep, Fiore brings a mining financier kno
Slide 4: Board of Directors and Advisors
SEVA MINING 4 Board of Directors Advisors Ranj Pillai President, CEO, & Director Frank Giustra Former Premier of Yukon (10th Premier) — Deputy Premier + Minister of Energy, Mines & Resources — natural- Strategic Advisor resources governance + stakeholder/regulatory navigation. Indigenous partnership
Slide 5: Management
SEVA MINING 5 Management Helton Fan Ranj Pillai VP Environmental & Communities President, CEO, & Director Senior Technical Consultant, Fuse Advisors (SLR) — sustainability + environmental permitting / approvals advisory. Former Premier of Yukon (10th Premier) Former Director roles: Environmental Per
Slide 6: Seva Mining at a Glance
SEVA MINING 6 SEVA MINING AT A GLANCE CREATING A LEADING GOLD ~1.25 Moz High-Grade Foundation — At Surface PRODUCER IN NW ONTARIO Fiore-Backed — The Team That's Done It Before CAMERON PROJECT HIGHLIGHTS 1.25M Oz Total Contained Gold 118,809m i to i illin H s r c Dr g Near-Term Cash Flow Without Buil
Slide 7: The M&A Wave
$14B+ 7 The M&A Wave In M&A Since 2020 Project Aquirer Year Value Cameron Gold Seva Mining 2025 $25M $343M $5.1B Rainy River Couer Mining 2025 US$7B Musselwhite Equinox Gold 2026 US$5.1B Dixie Project Kinross 2021 US$1.4B Red Lake Evolution 2019 US$375M Mining $375M Battle North Gold Evolution 2021
Slide 8: Cameron Project Key Attributes
SEVA MINING 8 Cameron Project Key Attributes 01 Existing High-Grade Existing 125 o Resource provides foundation of value Resource 323 m of underground 02 Project De-Risking development and 110 m of historic drilling already in place 24 km mineralied trend ith multiple 03 Resource + Regional high-gra
Slide 9: Major Gold Deposit
SEVA MINING 9 NORTHWEST ONTARIO Major Gold Deposit 0.515 0.740 COEUR
Slide 10: Seva's Legacy Infrastructure
BO ae fi wd SEVA’S LEGACY “aL INFRASTRUCTURE Power Proximity to regional infrastructure including power ' service centres, supporting a “direct-to-mill” logistics concept. x A, Proximity ‘Cameron Mine sits approx. 88km from the Rainy River Mine, which can support partnership and toll-mining, style p
Slide 11: The Orebody
SEVA MINING 11 The Orebody Shallow, Wide, High-Grade. 1.25 Moz Total Resource 515 koz M&I at 2.44 g/t + 740 koz Inferred at 2.18 g/t >500 koz M&I in the Upper 300 m Shallow, mineable from existing workings Typical Widths 5–20 m+, Core Zones >10 m Supports bulk underground mining Open at Depth Minera
Slide 12: De-Risked Access
SEVA MINING 12 De-Risked Access Existing Underground Workings Cut Through High-Grade Ore. 3,238 m of Existing Development 1,390 m decline to 243 m depth + 1,848 m of lateral drifting (1986–1990) Drifts Intersect >3 g/t M&I Blocks Directly Direct path to high-grade ore 118,809 m of Historic Drilling
Slide 13: Resource + Regional Upside
SEVA MINING 13 CAMERON PROJECT Cameron Deposit New Discovery Potential Resource + Contains o at gt u Proect spans a m structural and o at gt u nerred corrido osted in altered asalts along te iggrade mineraliation including Regional Upside Cameron ae ear on notale intercepts at ictor eggs Remains ope
Slide 14: Mineralized Stockpile
SEVA MINING 14 Mineralized Stockpile 1980 2009 Underground exploration 2009: Nuinsco Resources Ltd. development & bulk sampling resampled the stockpile from late 1980’s 281 samples (cross pattern trenching), survey & volume calculations 2020 2025 Systematic sampling Potential for toll-milling in pla
Slide 15: DSO Approach
SEVA MINING 15 DSO Approach Proven Satellite Mine Model Transport to Off-Site Mill igh-grade ore mined ndergrond and shipped to Ore cold e trcked km to the ainy iver Mill No Mill, No Tailings Facility an eisting off-site mill no onsite processing ktpd, or to one of several proposed development reire
Slide 16: The Seva Model
SEVA MINING 16 The Seva Model Acquire. Develop. Toll-Mill. Repeat. Acquire High-Grade Develop Using the DSO Low Capex. Fast Assets in NW Ontario Approach — No Mill Required Approvals. Repeatable. Seva targets advanced-stage gold Mine high-grade ore and truck it to an Each acquisition follows the sam
Slide 17: Cap Table
SEVA MINING 17 Cap Table New Money ~35.9% Cameron Aquisition CAD $5,000,000 Transaction Costs CAD $500,000 First Mining Gold ~47.9% Total Cash OUT CAD $5,500,000 Cash Post Acquisition CAD $10,200,000 Debt Post Acquisition CAD $0 Fiore ~13.7% Issued & Outstanding Shares No. 187,180,285 Options No. 15
Slide 18: Why Seva Mining
SEVA MINING 18 Why The Fiore Group Ranj Pillai The team behind 8X–30X returns As Former Premier of Yukon and across Dolly Varden, West Red Lake, Minister of Energy, Mines & and NexGold. Fiore brings Resources he brings cabinet-level institutional-grade capital access, regulatory experience and deep
Slide 19: For More Information, Please Contact
27 For More Information, Please Contact Daniel Baraghoush daniel@sevamining.com 604 364-8847 3123-595 Burrard St, Vancouver, BC V6C 0E4 sevamining.com