Luka Koper D.d. · LJSE:LKPG
Luka Koper D.d — Luka Koper — Investor Presentation (October 2026)
27 slides from Luka Koper D.d's investor presentation, October 2026
Slide 1: Green European Gateway
“7 LUKA KOPER Port of Koper
Slide 2: Multi-Purpose Port
MULTI-PURPOSE PORT CONTAINERS CARS AND BREAK BULK PERISHABLES The largest terminal Diversity of products Over 50 years of in the Adriatic RO-RO is the motto experience The largest terminal in the Med COAL AND PROJECT ALUMINA AND TIMBER IRON ORE CARGOES OTHER Top timber terminal in the region Gateway
Slide 3: Car & Ro-Ro Terminal
CAR & RO-RO TERMINAL Largest car terminal in the Mediterranean 35+ global car producers Gateway for 25+ Import and Export volumes 46.000 parking places More than 47.500 Throughput in 2025: 914.817 units
Slide 4: Container Terminal
LUKA KOPER Port of Koper ual <x = = = [aa Lid = [a LJ = < - =< O O
Slide 5: Break Bulk Terminal
BREAK BULK TERMINAL Various metal products plates, coils, billets, tubes, rails
Slide 6: Reefer Terminal
REEFER TERMINAL Copenhagen 2 days London 2 days Rotterdam Berlin Warszaw 1 day 1 day 2 days Frankfurt 1 day KOPER AS EU München Prague FRESH PRODUCE 0,5 day 1 day DISTRIBUTION Vienna 0,5 day CENTER Fast entry procedures of goods Budapest into EU: flexibility, smooth work 0,5 day during weekends (inc
Slide 7: CFS Services
CFS Services • stuffing/stripping of containers, loading/discharging of vehicles • palletizing, wrapping, lashing, …
Slide 8: Project Cargo Handling
PROJECT CARGO HANDLING HIGH & HEAVY, OOG CARGO HANDLING
Slide 9: Dry Bulk & Silo Terminal
DRY BULK & SILO TERMINAL Flat stores for minerals Flat stores for minerals Flat stores for soya Silo for alumina Silo for grain/cereals Flat stores for soya
Slide 10: Coal & Iron Ore Terminal
COAL & IRON ORE TERMINAL 800.000 ton total storage capacity cellulose anti-dusting system
Slide 11: Liquid Bulk Terminal
LIQUID BULK TERMINAL fuels & chemicals 45 tanks with 203.000 m3 of total capacity
Slide 12: Hinterland Markets
HINTERLAND MARKETS POLAND Containers, Cars, GERMANY General cargo CZECHIA Containers, Cars, Containers, Cars, General cargo General cargo SLOVAKIA Vehicles are by far the dominant Container market leader cargo segment in both with 60– 70 % share directions, while exports from Germany mainly include
Slide 13: Maritime Connections
DEEP SEA MARITIME CONNECTIONS DirectLine Transhipment
Slide 14: Short Sea Maritime Connections
SHORT SEA MARITIME CONNECTIONS For details please visit https://luka-kp.si/eng/sailing-list/ = Hub Port
Slide 15: Intermodal Connections
INTERMODAL CONNECTIONS REGULAR INTERMODAL RAILWAY CONTAINER SERVICES BLOCK CONTAINER TRAINS:22-24 TRAINS/DAILY Melnik Wrocław CAPACITY ON THE TERMINAL: 30-32 TRAINS/DAILY Katowice Prague Ostrava CONTAINER TERMINAL MODAL SPLIT Linz Brno Žilina Košice Salzburg München Bratislava 39 % RAIL (2025) Wien
Slide 16: Hinterland Road Connections
HINTERLAND ROAD CONNECTIONS Modern highway network Reachable from the Port of Koper Wrocław 1018 km by road in less than 1 day Katowice 871 km Nürnberg 679 km Prague 814 km Reduction of CO2 emissions Stuttgart 742 km Brno 617 km Permits for road oversized cargo road transport easily and rapidly obta
Slide 17: Current and Future Major Investments
CURRENT AND FUTURE MAJOR INVESTMENTS Dedicated berth for Car storage area Under Construction car-carriers Future Investment Long-term Warehouse for steel coils development areas New Berth no. 12 Area next to the port to be used for car storage in the future. Extension of the northern part of Pier I
Slide 18: Expansion of the Container Terminal
EXPANSION OF THE CONTAINER TERMINAL • 326 m of quayside, • 2 berths, • 3 additional super post-panamax STS cranes • 2 additional railway tracks of 700m each • an additional RMG crane • 11 e-RTGs • 70 thousand m2 of storage areas, • a 40% increase of annual throughput capacity
Slide 19: Investments on the Car and Ro-Ro Terminal
INVESTMENTS ON THE CAR AND RO-RO TERMINAL New open storage areas for additional 3.000 units New dedicated berth / for car-carriers GARAGE CAPACITY (normal size passenger vehicle) Garage part Covered Roof Total Existing 10.656 3.000 13.656 Additional 9.628 2.052 11.680 TOTAL 20.284 5.052 25.336
Slide 20: New Berth
NEW BERTH Dedicated to break bulk & Ro-Ro vessels Area of 17 ha Draft 12m
Slide 21: New Warehouse for Steel Coils
NEW WAREHOUSE FOR STEEL COILS 14.000 m2 of additional warehouse, specialized for steel coils Transition from forklift to overhead crane warehouse operations Automating stock position data for an easier outbound process – through WMS Releasing existing 23.000 m2 of classical warehouses to other cargo
Slide 22: Construction of the New Railway Line Divača - Koper
CONSTRUCTION OF THE NEW RAILWAY LINE DIVAČA - KOPER 27,1 km total length Divača 75% (20,5km) inside 7 tunnels 430 m altitude difference constructions works started in May 2021 expected to become operative in H1 2027 Source: https://drugitir.si/ TRANSIT NUMBER of CARGO TIME TRAINS* CAPACITY* 110 90 1
Slide 23: Construction of New Railway Line Divača - Koper
CONSTRUCTION OF NEW RAILWAY LINE DIVAČA - KOPER
Slide 24: Investments into the Slovenian Railway Network
INVESTMENTS INTO THE SLOVENIAN RAILWAY NETWORK Gornja HODOŠ Radgona ŠENTILJ Dravograd Ljutomer Lendava JESENICE Prevalje MARIBOR Velenje Main double railway line PRAGERSKO Ormož Main single railway line CELJE Construction of new railway line Divača – Koper LJUBLJANA ZIDANI MOST Modernization of rail
Slide 25: Reliable Operations
RELIABLE OPERATIONS - a single company operates all terminals - pre-clea - synergy in operations - entir - quality, reliability, flexibility - - non-stop handling operations po 24/7/363 Port Before Koper
Slide 26: Customs Procedures
CUSTOMS PROCEDURES PO - pre-clearing customs procedures - fu - entire port area is a customs bond area - EU border inspection point; possibility of fiscal clearance and fiscal warehousing - fiscal representation available and simple - ISPS code compliant Port Before Koper
Slide 27: Thank You for Your Attention!
THANK YOU FOR YOUR ATTENTION!