Kutcho Copper Corp · TSXV:KC

Kutcho Copper — Investor Presentation (March 2026)

42 slides from Kutcho Copper's investor presentation, Mar 25, 2026

  1. Slide 1: Investor Presentation March 2026

    TSXV: KC | OTCQX: KCCFF Investor Presentation March 2026

  2. Slide 2: Forward Looking Statement

    2 | kutcho.ca TSXV:KC OTCQX:KCCFF Forward Looking Statement This presentation contains certain statements that may be considered “forward-looking statements” with respect to Kutcho The forward-looking information contained herein is expressly Copper Corp. (“Kutcho Copper” or the “Company”) within th

  3. Slide 3: Feasibility Study Headline Results

    3 | kutcho.ca TSXV:KC OTCQX:KCCFF * The Feasibility Study and data in this slide includes no cost inflation or re- assessment of costs. 1 Metal prices: Cu US$5.00/lb, Zn US$1.15/lb, Ag Feasibility Study Headline Results US$20/oz. Au US$1,600/oz. 2 CuEqR calculation based on base case metal prices. 3

  4. Slide 4: Significant Leverage to Rising Copper Prices

    4 | kutcho.ca Significant NPV and IRR Sensitivity to Copper Price Only Zinc, Silver & Gold at FS Base Case Prices Leverage to Rising Copper Prices * All values includes Wheaton Stream

  5. Slide 5: Copper developer comparables: Kutcho re-rate opportunity

    5 | kutcho.ca TSXV:KC OTCQX:KCCFF Copper developer comparables: Kutcho re-rate opportunity Cu Developers: Consensus P/NAV dddd Based on Kutcho Coppers share price at $.33 - Jan 23, 2026. See page 3 of this presentation for financial metrics @ US$5Cu. Source: Haywood Securities Inc, S&P Capital IQ Pr

  6. Slide 6: Kutcho Copper Offers a Strong Share Structure

    6 | kutcho.ca TSXV:KC OTCQX:KCCFF Kutcho Copper Offers a Strong Share Structure Share Price Last 12 Months (TSX.V – C$) Capital structure Ticker Shares issued 184,244,988 TSXV:KC $0.25 Stock options 11,975,000 OTCQX:KCCFF Warrants 19,469,982 Share Ownership Wheaton Precious Metals 9.6% Capstone Mini

  7. Slide 7: Wheaton Precious Metals Provides Over $100M Financing Package

    7 | kutcho.ca TSXV:KC OTCQX:KCCFF Wheaton Precious Metals Provides Over $100M Financing Package Metal % contribution Precious metals stream (US $87.8M) to revenue at base case ● US $15.8M towards project acquisition metal prices ● US $10.5M+ in equity participation ● US $7M provided to fund the feas

  8. Slide 8: A Development-Friendly Region with a Number of Major Projects

    8 | kutcho.ca TSXV:KC OTCQX:KCCFF N Kutcho A Development-Friendly Dease Lake Property Region with a Number of with 120km access road Major Projects in Various Red Chris Phases of Development Kemess & Construction, with Galore Creek KSM Local Skilled Workforce Brucejack Mt Milligan Port of Stewart Ki

  9. Slide 9: First Nations – Tahltan & Kaska Dena

    9 | kutcho.ca TSXV:KC OTCQX:KCCFF First Nations – Tahltan & Kaska Dena Kutcho Copper executed a new Exploration Agreement with Tahltan Central Government in November 2021 and renewed their Communications Agreement in January 2021 Exploration Agreement signed with Kaska Dena Nation in February 2019 T

  10. Slide 10: Kutcho is an Accessible Project with On-Site and Nearby Infrastructure

    10 | kutcho.ca TSXV:KC TSXV:KC OTCQX:KCCFF OTCQX:KCCFF Kutcho is an Accessible Project with On-Site and Nearby Infrastructure Situated Within Moderate Terrain Accessibility Port facilities Existing field camp First Nations 120 km of existing ground in Stewart ~400 km from with 900 m long gravel ongo

  11. Slide 11: Kutcho Project Resource Lenses Contains Over 1 Billion lbs Copper Equivalent in M&I

    11 | kutcho.ca TSXV:KC OTCQX:KCCFF Kutcho Project Resource Lenses Contains Over 1 Billion lb’s Copper Equivalent in M&I 2021 Mineral Resource1 First of the Regional Targets TOTAL TOTAL M&I 22.8 Mt @ 2.26% CuEqR INFERRED 12.9 Mt @ 1.62% CuEqR MAIN MAIN Main M&I 20.2 Mt @ 1.97% CuEqR INFERRED 2.1 Mt @

  12. Slide 12: Kutcho Project Mine Workings

    12 | kutcho.ca TSXV:KC OTCQX:KCCFF Kutcho Project Mine Workings View to Northeast Main Main Open Pit Portal to Underground Mines Esso Underground Mine Esso Main Underground Mine Sumac Inferred Resource

  13. Slide 13: Efficient Infrastructure Layout

    Tailings 13 | kutcho.ca TSXV:KC OTCQX:KCCFF Management Facility Efficient Infrastructure Layout Stockpiles Open Pit Compact site footprint Collection Pond Waste rock dump temporary - backfilled to open pit during operations Underground Mill Complex Portal Tailings embankment: downstream Camp constru

  14. Slide 14: Kutcho Copper's Objective: 2X

    14 | kutcho.ca TSXV:KC OTCQX:KCCFF Kutcho Copper’s Objective: To double the size of 2X the current resource through exploration - adding significant value and expanding mine life as we move towards a construction decision

  15. Slide 15: The Kutcho Project Covers 90% of the Prospective Kutcho Formation rocks

    15 | kutcho.ca TSXV:KC OTCQX:KCCFF The Kutcho Project Covers 90% of the Prospective Kutcho Formation rocks Main / Sumac / The prospective volcanic rocks SOUTH Esso Deposits NORTH are folded, repeating the mineralized horizon threefold on the project, King Salmon Thrust Fault Nahlin including the dep

  16. Slide 16: District Scale VMS Target Rich Environment that Remains Under-Explored

    16 | kutcho.ca TSXV:KC OTCQX:KCCFF Kutcho Copper Project is a District Scale VMS Target Rich Environment that Remains Under-Explored Over 10 untested near-resource & regional targets Bow exhibiting ZTEM conductivity highs Josh Creek Kris Sumac Mother Hamburger / The Gap / Esso West – Sumac Deposit R

  17. Slide 17: Kutcho Copper Project Near Resource Targets

    17 | kutcho.ca TSXV:KC OTCQX:KCCFF Kutcho Copper Project Near Resource Targets dddd Untested ZTEM conductivity highs near to the known mineralization – strongly supported by geology, magnetic, and seismic data to 850 m depth Known mineralization lies on the upper edge of the conductivity shell Main

  18. Slide 18: Hamburger - Largest Untested ZTEM Target

    18 | kutcho.ca TSXV:KC OTCQX:KCCFF Hamburger - Largest Untested ZTEM Target A large high priority target area of over 2.8 km2 – an area more than double the current known Resource Sumac Geological indicators give room for Main multiple exploration target types, including downfaulted mineralization o

  19. Slide 19: The Gap - Strong Conductivity Trends

    19 | kutcho.ca TSXV:KC OTCQX:KCCFF The Gap - Strong Conductivity Trends A large high priority target area of over 1.3 km2 – a nexus Sumac Esso of trends Main Geological indicators allow for multiple exploration target trends, including both cross- potentially downfaulted and parallel trends. Histori

  20. Slide 20: Esso West - New Technology Changes Targeting

    20 | kutcho.ca TSXV:KC OTCQX:KCCFF Esso West - New Technology Changes Targeting Current ZTEM modelling and seismic surveys improve targeting ability Limited historical drilling results lacked current targeting ability and yet include: EO94B3 7.17 m 1.96% Cu & 5.25% Zn, EO94B1 0.64 m 1.15% Cu & 0.33%

  21. Slide 21: Esso West: Target Morphology

    21 | kutcho.ca TSXV:KC OTCQX:KCCFF Esso West : Target Morphology Opportunity to potentially find multiple Esso sized lenses in target area Target area geology interpreted Esso is the highest grade lens of the Project – to be the same as the Esso Deposit responsible for accreting 50% of the return on

  22. Slide 22: Exploration Program 2026: Summary

    22 | kutcho.ca TSXV:KC OTCQX:KCCFF Exploration Program 2026: Summary Drill-Ready Priority VMS Targets (Hamburger, The Gap, Esso West) • 6,000 m initial drill program with additional drilling contingent on results • Downhole EM geophysical surveys for target vectoring and determining mineralization e

  23. Slide 23: A Clear Path to Discovery, Growth, and Production

    23 | kutcho.ca TSXV:KC OTCQX:KCCFF A Clear Path to Discovery, Growth, and Production Kutcho Copper's Objective - to double the size of the current resource through exploration - adding significant value and expanding mine life as we move towards a construction decision High Grade Copper Zinc develop

  24. Slide 24: Management and Directors

    24 | kutcho.ca TSXV:KC OTCQX:KCCFF Management and Directors Vince Sorace Andrew Sharp P.Eng Gavin Cooper President & CEO, Director COO CFO ● Over 30 years experience in ● 35 years experience in mine design, ● 40 years in finance, strategy and capital markets construction, operational mine planning,

  25. Slide 25: Advisory Board

    25 | kutcho.ca TSXV:KC OTCQX:KCCFF Advisory Board Rob Duncan Stephen Quin Angus Christie Technical Consultant Advisor Advisor ● 26 years experience in mineral ● 40 years experience in mining and ● Over 30 years experience in mine exploration for majors including corporate affairs project development

  26. Slide 26: Contact

    TSXV: KC | OTCQX: KCCFF +1 (778) 357-1249 info@kutcho.ca Kutcho.ca Suite 918 - 1030 West Georgia St. Tel Email Website Vancouver, BC Canada V6E 2Y3

  27. Slide 27: Appendix

    27 | kutcho.ca TSXV:KC OTCQX:KCCFF Appendix

  28. Slide 28: Technical Information Compliance with NI 43-101

    28 | kutcho.ca TSXV:KC OTCQX:KCCFF Technical Information Compliance with NI 43-101 The technical or scientific information in this presentation has been reviewed and approved by Andrew Sharp, P.Eng The Project will be subject to a number of federal, provincial and BC (Lic. No. 47907), FAusIMM, Chief

  29. Slide 29: Feasibility Study Overview

    29 | kutcho.ca TSXV:KC OTCQX:KCCFF Feasibility Study Overview Notes: ● Tonnages are reported in metric tonnes (t), copper and zinc in pounds (lbs), silver and gold reported in troy ounces (oz). ● "M" = million, "k" = thousand ● All tables report rounded figures and may not sum precisely. ● The finan

  30. Slide 30: Estimate of Mineral Resources

    30 | kutcho.ca TSXV:KC OTCQX:KCCFF Estimate of Mineral Resources Inclusive of Reserves (effective 30 July 2021) Notes: 1. The mineral resource estimates in the table above form coherent bodies of mineralisation that are considered amenable to a combination of open pit and underground extraction meth

  31. Slide 31: Mineral Reserve Estimate

    31 | kutcho.ca TSXV:KC OTCQX:KCCFF Mineral Reserve Estimate (effective 4 November 2021) See next page for Notes

  32. Slide 32: Mineral Reserve Estimate (Notes)

    32 | kutcho.ca TSXV:KC OTCQX:KCCFF Mineral Reserve Estimate (effective 4 November 2021) Notes: Underground Specific Notes: 1. CIM definitions were followed for Mineral Reserves. 10. Underground Mineral Reserve cut-off grade was C$129.45/t NSR. 2. Mineral Resources are reported inclusive of Mineral R

  33. Slide 33: Ore by Source and NSR

    33 | kutcho.ca TSXV:KC OTCQX:KCCFF Ore by Source and NSR

  34. Slide 34: Open Pit and Underground Mining Statistics

    34 | kutcho.ca TSXV:KC OTCQX:KCCFF Open Pit and Underground Mining Statistics (Incl Pre-Production) Notes: 1. Includes 1.25 years for pre-production and stockpile rehandle periods 2. Mining operational costs and tonnages are inclusive of the pre-production period.

  35. Slide 35: Flotation Feed Grades

    35 | kutcho.ca TSXV:KC OTCQX:KCCFF Flotation Feed Grades

  36. Slide 36: Processing and Concentrate Production

    36 | kutcho.ca TSXV:KC OTCQX:KCCFF Processing and Concentrate Production Notes: 1. 10.75 years after pre-production, plus 0.25 years in pre-production start-up 2. 0.25 years for pre-production and 2.75 for stockpile rehandle periods 3. Metal recovery to concentrates compared to crusher head feed, an

  37. Slide 37: Capital Cost Summary

    37 | kutcho.ca TSXV:KC OTCQX:KCCFF Capital Cost Summary (1,2) Notes: 1. All values stated are undiscounted. 2. No inflation or depreciation of costs were applied; all costs are in 2021 money values. Major underground mobile equipment, all open pit mobile equipment and the power gensets are leased. 3

  38. Slide 38: Operating Cost Summary

    38 | kutcho.ca TSXV:KC OTCQX:KCCFF Operating Cost Summary (Excluding Pre-Production(1)) Notes: 1. Pre-production tonnages and costs are not included in the Life- of-Mine operating cost summary (these are Years -2 and -1 and are capitalized). 2. Year 1 includes pro-rated adjustments for working capit

  39. Slide 39: Cash Flow Summary

    39 | kutcho.ca TSXV:KC OTCQX:KCCFF Cash Flow Summary

  40. Slide 40: Kutcho's GHG Intensity

    40 | kutcho.ca TSXV:KC OTCQX:KCCFF Kutcho’s GHG Intensity Operational GHG Intensity Comparison for BC Copper Mines 1 GHG intensity of 1.3 kg CO2e/kg Cueq inclusive of all construction and closure requirements Other comparative carbon intensity reporting measures place Kutcho below the median of BC o

  41. Slide 41: Intrusive Related Targets

    41 | kutcho.ca TSXV:KC OTCQX:KCCFF Intrusive Related Targets • Intrusive target defined by magnetic inversion high and ZTEM conductivity low • Likely area of intrusive 4 x 5 km • Anomalous copper in overlying soils dddd • 2 x 1.5 km area of shallow anomalous ZTEM and VTEM conductivity may represent

  42. Slide 42: Intrusion Related Targets - Section A' - B'

    42 | kutcho.ca TSXV:KC OTCQX:KCCFF Intrusion Related Targets - Section A' - B' • Anomalous Conductivity in both limestones and volcanic rocks above modeled intrusive • Potential for intrusion related mineralization including CRD and skarn dddd • Mineral occurrences and anomalous soil geochemistry su

Kutcho Copper — Investor Presentation (March 2026) on 6ix